Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Mahaveer Camelia

by REDDY STRUCTURES PRIVATE LIMITED · 92 homes · 1.09 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Oct 2026. 47% built with 100% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
47% built

Due 31 Oct 2026. 100% of the time from RERA approval to the deadline has passed.

Built47%
Time used100%
How much is sold?92 left
0% booked

0 of 92 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
84 homes per acre

Similar projects within 3 km: 82 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 102 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?24 due so far
0% on time

Of its 27 RERA projects in Bengaluru Urban: 0 delivered on time, 8 late (after the date first promised), 16 past due with no completion filed, 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2022
  2. Approved by RERA4 Nov 2022
  3. Today24 Oct 2026

    100% of the time to the deadline has passed.

  4. If it slips like a typical project2 Aug 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2647%
Q4 2025-2647%
Q1 2026-2747%
Q2 2026-2747%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked92 leftQ2 2026-27

Still available: 5 × 1 BHK, 87 × 2 BHK.

Booked, by type

1 BHK0 of 5
2 BHK0 of 87

Booked, each quarter

Q3 2025-260 of 92
Q4 2025-260 of 92
Q1 2026-270 of 92
Q2 2026-270 of 92

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
738 sq ft
69 m² carpet · sizes 427–833 sq ft (24 at this size)
50 m² land share · 21 m² balcony/terrace · 1 parking space
87 homes · 95% of the project
1 BHK
833 sq ft
77 m² carpet · sizes 662–833 sq ft (2 at this size)
48 m² land share · 21 m² balcony/terrace · 1 parking space
5 homes · 5% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Mahaveer Camelia3 floors

Mahaveer Camelia: 92 homes, 14 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project84
Typical within 3 km (69)82
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (71)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.09 acres

4,408 m²

Ground covered by buildings
47% of the land

2,086 m²

Floor-area ratio
1.73

Floors built per unit of land: 1.73 m² of floors for each m² of land.

Parking
1.09 per home

84 covered, 16 open

Built-up area, all floors
72,409 sq ft

6,727 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 27 RERA projects of Mahaveer Group on the map

Complaints to RERA about its other projects

102 complaints across 7 projects. The most complained about:

Show all 7 projects
  • Mahaveer Highlands 1 complaint
  • MAHAVEER WILLET 1 complaint

The company

Registered as
REDDY STRUCTURES PRIVATE LIMITED
Type
Company
Company number
U07010KA2002PTC031181

CIN or LLPIN, from the Registrar of Companies.

PAN
AACCR6953L
GSTIN
29AACCR6953L1ZQ

Its other registrations on RERA Karnataka

10 registrations under this company
  • MAHAVEER CREST PRM/KA/RERA/1251/446/PR/170726/008823 · approved 17 Jul 2026
  • Mahaveer Highlands PRM/KA/RERA/1251/310/PR/220922/005266 · approved 22 Sep 2022
  • Mahaveer Rarus PRM/KA/RERA/1251/310/PR/220817/005160 · approved 17 Aug 2022
  • Mahaveer Palatium Sy No 41 PRM/KA/RERA/1251/308/PR/220221/004719 · approved 21 Feb 2022
  • MAHAVEER TRIDENT PRM/KA/RERA/1251/310/PR/190219/002385 · approved 19 Feb 2019
  • MAHAVEER WILLET PRM/KA/RERA/1251/446/PR/171015/000828 · approved 15 Oct 2017
  • MAHAVEER PALATIUM PRM/KA/RERA/1251/308/PR/171015/000357 · approved 15 Oct 2017
  • MAHAVEER MERIDIAN PRM/KA/RERA/1251/310/PR/171015/000467 · approved 15 Oct 2017
  • MAHAVEER PROMENADE PRM/KA/RERA/1251/446/PR/171015/000455 · approved 15 Oct 2017
  • MAHAVEER TURQUOISE PRM/KA/RERA/1251/310/PR/171014/000777 · approved 14 Oct 2017

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹37.1 crBuilding and development ₹30.0 crTotal ₹67.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹0.0 lakh₹0.0 lakh
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.99 kmReliable
  • Nearest railway station3.83 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.65 kmCaveat

Hospitals

  • Nearest hospital0.5 kmCaveat

Schools

  • Schools in pincode 560036 (UDISE+ census)89Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
  • Median pupil-teacher ratio, schools within 1 km30 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionK.R. Puram PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)9.38 kmReliable
  • Nearest sewage treatment plant1.66 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)5.99 kmCaveat
  • Nearest commercial-airport runway21.04 kmReliable
  • Distance to runway approach-path proxy20.58 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.99914, 77.71076), 2026-10-24. Each figure's source and caveat are in the full report.