Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

LEAFY SERENE

by LEAFY REALTY LLP · 44 homes · 0.73 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2028. 5% built with 16% of the time used. 9% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
5% built

Due 31 Dec 2028. 16% of the time from RERA approval to the deadline has passed.

Built5%
Time used16%
How much is sold?40 left
9% booked

4 of 44 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
60 homes per acre

Similar projects within 3 km: 72 per acre. 48% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA21 May 2026
  2. Work started1 Jun 2026
  3. Today24 Oct 2026

    16% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q1 2026-272%
Q2 2026-275%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

4 booked40 leftQ2 2026-27

Still available: 2 × 2 BHK, 38 × 3 BHK.

Booked, by type

2 BHK2 of 4
3 BHK2 of 40

Booked, each quarter

Q1 2026-271 of 44
Q2 2026-274 of 44

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
906 sq ft
84 m² carpet · sizes 906–944 sq ft (20 at this size)
68 m² land share · 13 m² balcony/terrace · 1 parking space
40 homes · 91% of the project
2 BHK
700 sq ft
65 m² carpet
53 m² land share · 11 m² balcony/terrace · 1 parking space
4 homes · 9% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Leafy Serene4 floors

Leafy Serene: 44 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project60
Typical within 3 km (52)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project48%
Typical within 3 km (52)60%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.73 acres

2,946 m²

Ground covered by buildings
52% of the land

1,520 m²

Floor-area ratio
1.74

Floors built per unit of land: 1.74 m² of floors for each m² of land.

Parking
1.09 per home

48 covered, 0 open

Built-up area, all floors
68,308 sq ft

6,346 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of LEAFY REALTY LLP on the map

The company

Registered as
LEAFY REALTY LLP
Type
Partnership Firm
Company number
ACB-9733

CIN or LLPIN, from the Registrar of Companies.

PAN
AAKFL9554C
GSTIN
29AAKFL9554C1ZY

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹4.7 crBuilding and development ₹20.4 crTotal ₹25.2 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q1 2026-27₹1.4 lakh₹0.0 lakh
Q2 2026-27₹53.6 lakh₹55.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.66 kmReliable
  • Nearest railway station8.65 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.31 kmCaveat

Hospitals

  • Nearest hospital3.7 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)14.75 kmReliable
  • Nearest sewage treatment plant8.84 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)11.25 kmCaveat
  • Nearest commercial-airport runway33.06 kmReliable
  • Distance to runway approach-path proxy30.95 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.89568, 77.78469), 2026-10-24. Each figure's source and caveat are in the full report.