Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

KANISHA WHITE PALACE

by Kanisha Builders · 40 homes · 0.27 acres · 1 tower · Yelahanka

Delivered on time Completed: the builder filed for completion on 6 May 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 6 May 2026, by the date it promised.

How much is sold?32 left
20% booked

8 of 40 homes, as the builder reported for Q4 2025-26.

How crowded is it?More crowded
146 homes per acre

Similar projects within 3 km: 74 per acre. 40% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started2 Sep 2022
  2. Approved by RERA16 Jan 2023
  3. Completion filed6 May 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2696%
Q4 2025-26100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

8 booked32 leftQ4 2025-26

Still available: 10 × 1 BHK, 13 × 2 BHK, 9 × 3 BHK.

Booked, by type

1 BHK0 of 10
2 BHK2 of 15
3 BHK6 of 15

Booked, each quarter

Q3 2025-265 of 40
Q4 2025-268 of 40

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 422 sq ft2 homes39.2 m²
  • 355 sq ft1 home33.0 m²
  • 388 sq ft1 home36.0 m²
  • 455 sq ft1 home42.3 m²
  • and 10 homes in other sizes
Typically 328 m² land share · 12 m² balcony/terrace · 1 parking space
15 homes · 38% of the project
3 BHK
  • 883 sq ft2 homes82.0 m²
  • 667 sq ft1 home62.0 m²
  • 797 sq ft1 home74.0 m²
  • 823 sq ft1 home76.5 m²
  • and 10 homes in other sizes
Typically 405 m² land share · 18 m² balcony/terrace · 1 parking space
15 homes · 38% of the project
1 BHK
  • 368 sq ft2 homes34.2 m²
  • 253 sq ft1 home23.5 m²
  • 256 sq ft1 home23.8 m²
  • 389 sq ft1 home36.1 m²
  • and 5 homes in other sizes
Typically 159 m² land share · 10 m² balcony/terrace · 1 parking space
10 homes · 25% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Kanisha White Palace3 floors

Kanisha White Palace: 40 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project146
Typical within 3 km (70)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project40%
Typical within 3 km (72)53%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.27 acres

1,112 m²

Ground covered by buildings
60% of the land

667 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.00 per home

40 covered, 0 open

Built-up area, all floors
30,182 sq ft

2,804 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Kanisha Builders
Type
Partnership Firm
PAN
AAOFK7319J
GSTIN
29AAOFK7319J1ZP

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.3 crBuilding and development ₹10.8 crTotal ₹13.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹1.0 cr₹77.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.37 kmReliable
  • Nearest railway station0.26 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.48 kmCaveat

Hospitals

  • Nearest hospital0.82 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
  • Median pupil-teacher ratio, schools within 1 km35.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.84 kmReliable
  • Nearest sewage treatment plant0.65 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)3.18 kmCaveat
  • Nearest commercial-airport runway13.95 kmReliable
  • Distance to runway approach-path proxy8.09 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.10726, 77.59255), 2026-10-24. Each figure's source and caveat are in the full report.