by M/S JRC PROJECTS · 115 homes · 1.69 acres · 2 towers · Bengaluru South

Upcoming Under construction, due Nov 2028. 65% built with 43% of the time used. 6% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
65% built

Due 10 Nov 2028. 43% of the time from RERA approval to the deadline has passed.

Built65%
Time used43%
How much is sold?108 left
6% booked

7 of 115 homes, as the builder reported for Q3 2025-26.

How crowded is it?About the same
68 homes per acre

Similar projects within 3 km: 72 per acre. 62% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?5 due so far
40% on time

Of its 8 RERA projects in Bengaluru Urban: 2 delivered on time, 3 late (after the date first promised), 3 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started11 Nov 2023
  2. Approved by RERA7 Apr 2025
  3. Today24 Oct 2026

    43% of the time to the deadline has passed.

  4. If it slips like a typical project12 Aug 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2665%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q3 2025-26

Tower K80%
Tower L0%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

7 booked108 leftQ3 2025-26

Still available: 66 × 1 BHK, 42 × 3 BHK.

Booked, by type

1 BHK4 of 70
3 BHK3 of 45

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

1 BHK
642 sq ft
60 m² carpet · sizes 637–650 sq ft (30 at this size)
37 m² land share · 7 m² balcony/terrace · 1 parking space
70 homes · 61% of the project
3 BHK
1,311 sq ft
122 m² carpet · sizes 1,311–1,528 sq ft (25 at this size)
73 m² land share · 9 m² balcony/terrace · 1 parking space
45 homes · 39% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower K4 floors
Tower L4 floors

Tower K: 105 homes, 15 m tall, 1 basement · Tower L: 10 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (68)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project62%
Typical within 3 km (68)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.69 acres

6,843 m²

Ground covered by buildings
38% of the land

2,594 m²

Floor-area ratio
0.27

Floors built per unit of land: 0.27 m² of floors for each m² of land.

Parking
1.10 per home

127 covered, 0 open

Built-up area, all floors
1,84,138 sq ft

17,107 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 8 RERA projects of JRC PROJECTS on the map

The company

Registered as
M/S JRC PROJECTS
Type
Partnership Firm
PAN
AALFJ7178H
GSTIN
29AALFJ7178H1ZP

Its other registrations on RERA Karnataka

7 registrations under this company
  • JRC KANSO PRM/KA/RERA/1251/308/PR/250526/008679 · approved 25 May 2026
  • JRC SANZIO PRM/KA/RERA/1251/308/PR/200923/006277 · approved 20 Sep 2023
  • JRC Wild Woods building 2 PRM/KA/RERA/1251/308/PR/240723/006087 · approved 24 Jul 2023
  • JRC Palladio Phase 2 PRM/KA/RERA/1251/308/PR/090623/005987 · approved 9 Jun 2023
  • JRC WILD WOODS PRM/KA/RERA/1251/310/PR/030822/005129 · approved 3 Aug 2022
  • JRC PALLADIO PRM/KA/RERA/1251/308/PR/200211/003281 · approved 11 Feb 2020
  • PALLADIO PRM/KA/RERA/1251/308/PR/180504/001600 · approved 4 May 2018

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹7.0 crBuilding and development ₹130.0 crTotal ₹137.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.0 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.73 kmReliable
  • Nearest railway station5.59 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.36 kmCaveat

Hospitals

  • Nearest hospital1.11 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Median pupil-teacher ratio, schools within 1 km28.9 :1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well1 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.42 kmReliable
  • Nearest sewage treatment plant2.1 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)9.32 kmCaveat
  • Nearest commercial-airport runway35.8 kmReliable
  • Distance to runway approach-path proxy34.86 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.86610, 77.67610), 2026-10-24. Each figure's source and caveat are in the full report.