RERA project · Residential/Group Housing

Jeevans Octave

by Jeevan Developers · 274 homes · 3.09 acres · 1 tower · Bengaluru East

Delivered late Completed: the builder filed for completion on 1 Jul 2026, 366 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 1 Jul 2026, 366 days after the date it first promised.

How much is sold?103 left
69% booked

233 of 336 homes, as the builder reported for Q1 2026-27.

How crowded is it?More crowded
89 homes per acre

Similar projects within 3 km: 79 per acre. 33% of the land is left open.

Any complaints?See the list
3 complaints

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
50% on time

Of its 3 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jun 2022
  2. Approved by RERA12 Sep 2022
  3. First promised30 Jun 2025

    The date the builder gave at registration.

  4. Completion filed1 Jul 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-26100%
Q4 2025-26100%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

233 booked103 leftQ1 2026-27

Still available: 20 × 2.5BHK, 63 × 2BHK, 20 × 3BHK.

Booked, by type

2.5BHK78 of 98
2BHK117 of 180
3BHK38 of 58

Booked, each quarter

Q3 2025-26224 of 336
Q4 2025-26233 of 336
Q1 2026-27233 of 336

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2BHK
744 sq ft
69 m² carpet
35 m² land share · 15 m² balcony/terrace · 1 parking space
180 homes · 54% of the project
2.5BHK
899 sq ft
84 m² carpet · sizes 899–973 sq ft (80 at this size)
42 m² land share · 17 m² balcony/terrace · 1 parking space
98 homes · 29% of the project
3BHK
1,067 sq ft
99 m² carpet · sizes 976–1,067 sq ft (30 at this size)
49 m² land share · 20 m² balcony/terrace · 1 parking space
58 homes · 17% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Jeevans Octave9 floors

Jeevans Octave: 336 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project89
Typical within 3 km (76)79
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project33%
Typical within 3 km (75)55%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.09 acres

12,509 m²

Ground covered by buildings
67% of the land

8,403 m²

Floor-area ratio
2.76

Floors built per unit of land: 2.76 m² of floors for each m² of land.

Parking
2.49 per home

369 covered, 7 open

Built-up area, all floors
4,75,323 sq ft

44,159 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of M/s. Jeevan Developers on the map

The company

Registered as
Jeevan Developers
Type
Partnership Firm
PAN
AANFJ6615K
GSTIN
29AANFK6615K1ZS

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹29.2 crBuilding and development ₹94.8 crTotal ₹124.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹11.7 cr₹7.7 cr
Q4 2025-26₹3.5 cr₹2.5 cr
Q1 2026-27₹3.5 cr₹2.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.33 kmReliable
  • Nearest railway station1.2 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)1.74 kmCaveat

Hospitals

  • Nearest hospital0.34 kmCaveat

Schools

  • Schools in pincode 560067 (UDISE+ census)57Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km11Caveat
  • Median pupil-teacher ratio, schools within 1 km24.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)8Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKadugodi PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)8.93 kmReliable
  • Nearest sewage treatment plant2.06 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)5.18 kmCaveat
  • Nearest commercial-airport runway20.48 kmReliable
  • Distance to runway approach-path proxy18.96 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.00728, 77.76150), 2026-10-24. Each figure's source and caveat are in the full report.