Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

JAGADHABI PREMIER 1

by JAGADHABI CONSTRUCTIONS LLP · 90 homes · 0.92 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Aug 2027. 95% built with 70% of the time used. 48% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
95% built

Due 31 Aug 2027. 70% of the time from RERA approval to the deadline has passed.

Built95%
Time used70%
How much is sold?47 left
48% booked

43 of 90 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
97 homes per acre

Similar projects within 3 km: 72 per acre. 42% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started25 Jul 2024
  2. Approved by RERA30 Oct 2024
  3. Today24 Oct 2026

    70% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jun 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2675%
Q4 2025-2685%
Q1 2026-2790%
Q2 2026-2795%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A95%
B95%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

43 booked47 leftQ2 2026-27

Still available: 33 × 2 BHK, 2 × 2.5 BHK, 11 × 3 BHK, 1 × 3.5 BHK.

Booked, by type

2 BHK28 of 61
2.5 BHK8 of 10
3 BHK7 of 18
3.5 BHK0 of 1

Booked, each quarter

Q3 2025-2617 of 90
Q4 2025-2624 of 90
Q1 2026-2741 of 90
Q2 2026-2743 of 90

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
654 sq ft
61 m² carpet · sizes 604–845 sq ft (8 at this size)
26 m² land share · 1 parking space
61 homes · 68% of the project
3 BHK
858 sq ft
80 m² carpet · sizes 821–1,185 sq ft (4 at this size)
34 m² land share · 1 parking space
18 homes · 20% of the project
2.5 BHK
834 sq ft
78 m² carpet · sizes 751–956 sq ft (4 at this size)
29 m² land share · 1 parking space
10 homes · 11% of the project
3.5 BHK
1,115 sq ft
104 m² carpet
38 m² land share · 1 parking space
1 home · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A4 floors
B4 floors

A: 50 homes, 15 m tall, 2 basements · B: 40 homes, 15 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project97
Typical within 3 km (57)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project42%
Typical within 3 km (57)68%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.92 acres

3,743 m²

Ground covered by buildings
57% of the land

2,152 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.13 per home

102 covered, 0 open

Built-up area, all floors
1,67,992 sq ft

15,607 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
JAGADHABI CONSTRUCTIONS LLP
Type
Partnership Firm
PAN
AATFJ7216N
GSTIN
29AATFJ7216N1ZH

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹15.6 crBuilding and development ₹41.4 crTotal ₹57.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹9.0 cr₹9.0 cr
Q4 2025-26₹17.6 cr₹17.6 cr
Q1 2026-27₹29.8 cr₹29.8 cr
Q2 2026-27₹34.9 cr₹33.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.12 kmReliable
  • Nearest railway station2.69 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)2.23 kmCaveat

Hospitals

  • Nearest hospital1.85 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km17.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionWhitefield PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km14Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.71 kmReliable
  • Nearest sewage treatment plant2.9 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)5.13 kmCaveat
  • Nearest commercial-airport runway24.35 kmReliable
  • Distance to runway approach-path proxy22.7 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.97254, 77.76639), 2026-10-24. Each figure's source and caveat are in the full report.