ISR UDAYAM

by ISR CONSTRUCTIONS PVT LTD · 158 homes · 2.37 acres · 2 towers · Bengaluru East

Past due, no completion filed Past its deadline of 31 Aug 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 31 Aug 2026, and no completion is filed.

How much is sold?63 left
60% booked

95 of 158 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
66 homes per acre

Similar projects within 3 km: 69 per acre. 56% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 late (after the date first promised), 1 past due with no completion filed.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started26 Jul 2022
  2. Approved by RERA21 Nov 2022
  3. Deadline31 Aug 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-2669%
Q4 2025-2669%
Q1 2026-2771%
Q2 2026-2773%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Isr Udayam A73%
Isr Udayam B73%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

95 booked63 leftQ2 2026-27

Still available: 35 × 2 BHK, 28 × 3 BHK.

Booked, by type

2 BHK31 of 66
3 BHK64 of 92

Booked, each quarter

Q3 2025-2696 of 158
Q4 2025-2696 of 158
Q1 2026-2790 of 158
Q2 2026-2795 of 158

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
873 sq ft
81 m² carpet · sizes 797–904 sq ft (20 at this size)
67 m² land share · 25 m² balcony/terrace · 1 parking space
92 homes · 58% of the project
2 BHK
664 sq ft
62 m² carpet · sizes 642–724 sq ft (12 at this size)
52 m² land share · 19 m² balcony/terrace · 1 parking space
66 homes · 42% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

Isr Udayam A4 floors
Isr Udayam B4 floors

Isr Udayam A: 72 homes, 15 m tall · Isr Udayam B: 86 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project66
Typical within 3 km (27)69
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project56%
Typical within 3 km (27)70%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.37 acres

9,611 m²

Ground covered by buildings
44% of the land

4,192 m²

Floor-area ratio
16793.00

Floors built per unit of land: 16793.00 m² of floors for each m² of land.

Parking
2.28 per home

187 covered, 0 open

Built-up area, all floors
2,40,950 sq ft

22,385 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of ISR CONSTRUCTIONS PRIVATE LIMITED on the map

The company

Registered as
ISR CONSTRUCTIONS PVT LTD
Type
Company
Company number
U45209AP2013PTC089980

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCI3534P
GSTIN
29AADCI3534P2Z2
Website
HTTP://WWW.ISRPROJECTS.COM

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹25.9 crBuilding and development ₹43.5 crTotal ₹69.4 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹0.0 lakh₹0.0 lakh
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.98 kmReliable
  • Nearest railway station8.96 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.36 kmCaveat

Hospitals

  • Nearest hospital3.66 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.03 kmReliable
  • Nearest sewage treatment plant2.03 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)10.73 kmCaveat
  • Nearest commercial-airport runway12.7 kmReliable
  • Distance to runway approach-path proxy11.59 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.07636, 77.74780), 2026-10-24. Each figure's source and caveat are in the full report.