Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

IRIS Courtyard

by M/s. IRIS LIFESCAPES · 40 homes · 0.53 acres · 1 tower · Bengaluru North

Delivered on time Completed: the builder filed for completion on 30 Jun 2026, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 30 Jun 2026, by the date it promised.

How much is sold?30 left
25% booked

10 of 40 homes, as the builder reported for Q4 2025-26.

How crowded is it?About the same
75 homes per acre

Similar projects within 3 km: 72 per acre. 45% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Dec 2023
  2. Approved by RERA21 May 2024
  3. Completion filed30 Jun 2026

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

How much is built, each quarter

Q3 2025-2690%
Q4 2025-2695%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

10 booked30 leftQ4 2025-26

Still available: 7 × 2 BHK, 23 × 3 BHK.

Booked, by type

2 BHK1 of 8
3 BHK9 of 32

Booked, each quarter

Q3 2025-2610 of 40
Q4 2025-2610 of 40

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
981 sq ft
91 m² carpet · sizes 981–1,186 sq ft (8 at this size)
54 m² land share · 26 m² balcony/terrace · 1 parking space
32 homes · 80% of the project
2 BHK
797 sq ft
74 m² carpet · sizes 797–889 sq ft (4 at this size)
47 m² land share · 22 m² balcony/terrace · 1 parking space
8 homes · 20% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Single Tower3 floors

Single Tower: 40 homes, 14 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project75
Typical within 3 km (62)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project45%
Typical within 3 km (63)54%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.53 acres

2,158 m²

Ground covered by buildings
55% of the land

1,183 m²

Floor-area ratio
2.17

Floors built per unit of land: 2.17 m² of floors for each m² of land.

Parking
1.10 per home

44 covered, 0 open

Built-up area, all floors
64,390 sq ft

5,982 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
M/s. IRIS LIFESCAPES
Type
Partnership Firm
PAN
AAFFI8287A
GSTIN
29AAFFI8287A1Z6

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹14.3 crBuilding and development ₹13.3 crTotal ₹27.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹45.0 lakh₹0.0 lakh
Q4 2025-26₹72.4 lakh₹72.0 lakh
Q1 2026-27₹18.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.13 kmReliable
  • Nearest railway station10.42 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km6Caveat
  • Parks within 1 km12Caveat
  • Nearest lake / water body (≥2 ha)1.13 kmCaveat

Hospitals

  • Nearest hospital0.52 kmCaveat

Schools

  • Schools in pincode 560076 (UDISE+ census)85Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
  • Median pupil-teacher ratio, schools within 1 km32.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)6Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionPuttenahalli PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.59 kmReliable
  • Nearest sewage treatment plant0.26 kmCaveat
  • Industrial zones within 1 km7Caveat
  • Nearest airfield runway (any, incl. military)10.63 kmCaveat
  • Nearest commercial-airport runway36.34 kmReliable
  • Distance to runway approach-path proxy33.38 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.87583, 77.59032), 2026-10-24. Each figure's source and caveat are in the full report.