Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

INSPIRA TROPICAL GARDEN

by IINSPIRA TROPICAL GARDEN LLP · 181 homes · 1.73 acres · 3 towers · Anekal

Past due, no completion filed Past its deadline of 30 Jun 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 30 Jun 2026, and no completion is filed.

How much is sold?49 left
73% booked

132 of 181 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
105 homes per acre

Similar projects within 3 km: 50 per acre. 34% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started31 Aug 2022
  2. Approved by RERA7 Nov 2022
  3. Deadline30 Jun 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-2687%
Q4 2025-2690%
Q1 2026-2793%
Q2 2026-2795%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A100%
Block B100%
Block C100%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

132 booked49 leftQ2 2026-27

Still available: 32 × 2 BHK, 17 × 3 BHK.

Booked, by type

2 BHK87 of 119
3 BHK45 of 62

Booked, each quarter

Q3 2025-26132 of 181
Q4 2025-26132 of 181
Q1 2026-27132 of 181
Q2 2026-27132 of 181

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
752 sq ft
70 m² carpet · sizes 676–840 sq ft (25 at this size)
44 m² land share · 29 m² balcony/terrace · 1 parking space
119 homes · 66% of the project
3 BHK
1,008 sq ft
94 m² carpet · sizes 998–1,099 sq ft (14 at this size)
59 m² land share · 40 m² balcony/terrace · 1 parking space
62 homes · 34% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

Block A13 floors
Block B13 floors
Block C13 floors

Block A: 63 homes, 42 m tall, 1 basement · Block B: 66 homes, 42 m tall, 1 basement · Block C: 52 homes, 42 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project105
Typical within 3 km (32)50
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project34%
Typical within 3 km (34)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.73 acres

6,989 m²

Ground covered by buildings
66% of the land

4,583 m²

Floor-area ratio
20022.50

Floors built per unit of land: 20022.50 m² of floors for each m² of land.

Parking
1.10 per home

181 covered, 18 open

Built-up area, all floors
3,33,293 sq ft

30,964 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
IINSPIRA TROPICAL GARDEN LLP
Type
Company
Company number
AAA-9192

CIN or LLPIN, from the Registrar of Companies.

PAN
ACDFS7363K
GSTIN
29ACDFS7363K1ZI

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹9.7 crBuilding and development ₹80.0 crTotal ₹89.7 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹1.7 cr₹1.2 cr
Q4 2025-26₹3.0 cr₹2.1 cr
Q1 2026-27₹38.0 lakh₹0.0 lakh
Q2 2026-27₹2.5 lakh₹1.6 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.74 kmReliable
  • Nearest railway station2.48 kmReliable
  • Bus stops within 500 m11Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km18Caveat
  • Nearest lake / water body (≥2 ha)2.99 kmCaveat

Hospitals

  • Nearest hospital0.56 kmCaveat

Schools

  • Schools in pincode 560001 (UDISE+ census)25Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km18.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionCubbon Park PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)33 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km3Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well30.3 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km3Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.46 kmReliable
  • Nearest sewage treatment plant0.16 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)7.23 kmCaveat
  • Nearest commercial-airport runway26.3 kmReliable
  • Distance to runway approach-path proxy22.77 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.97209, 77.59185), 2026-10-24. Each figure's source and caveat are in the full report.