by HSK DEVELOPERS (PROP PARVATHAMMA KRISHNAIAH) · 160 homes · 1.82 acres · 1 tower · Bengaluru South

Upcoming Under construction, due Mar 2027, after an extension. 94% built with 91% of the time used. 32% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
94% built

Due 1 Mar 2027. 91% of the time from RERA approval to the deadline has passed.

Built94%
Time used91%
How much is sold?109 left
32% booked

51 of 160 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
88 homes per acre

Similar projects within 3 km: 80 per acre. 54% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Mar 2023
  2. Approved by RERA6 Jun 2023
  3. First promised1 Mar 2026

    The date the builder gave at registration.

  4. Today24 Oct 2026

    91% of the time to the deadline has passed.

  5. If it slips like a typical project1 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2663%
Q4 2025-2675%
Q1 2026-2785%
Q2 2026-2794%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

51 booked109 leftQ2 2026-27

Still available: 49 × 2 BHK, 39 × 2 BHK+S, 21 × 3 BHK+2T.

Booked, by type

2 BHK14 of 63
2 BHK+S26 of 65
3 BHK+2T11 of 32

Booked, each quarter

Q3 2025-2646 of 160
Q4 2025-2648 of 160
Q1 2026-2749 of 160
Q2 2026-2751 of 160

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK+S
  • 698 sq ft32 homes64.8 m²
  • 709 sq ft32 homes65.9 m²
  • 629 sq ft1 home58.4 m²
Typically 45 m² land share · 5 m² balcony/terrace · 1 parking space
65 homes · 41% of the project
2 BHK
  • 592 sq ft8 homes55.0 m²
  • 719 sq ft8 homes66.8 m²
  • 743 sq ft8 homes69.0 m²
  • 588 sq ft4 homes54.6 m²
  • and 35 homes in other sizes
Typically 39 m² land share · 2 m² balcony/terrace · 1 parking space
63 homes · 39% of the project
3 BHK+2T
  • 888 sq ft12 homes82.5 m²
  • 876 sq ft11 homes81.4 m²
  • 891 sq ft4 homes82.8 m²
  • 903 sq ft4 homes83.9 m²
  • and 1 home in other sizes
Typically 56 m² land share · 5 m² balcony/terrace · 1 parking space
32 homes · 20% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Hsk Urban Living3 floors

Hsk Urban Living: 160 homes, 13 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project88
Typical within 3 km (37)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project54%
Typical within 3 km (38)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.82 acres

7,385 m²

Ground covered by buildings
46% of the land

3,366 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
1.10 per home

151 covered, 25 open

Built-up area, all floors
1,79,014 sq ft

16,631 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
HSK DEVELOPERS (PROP PARVATHAMMA KRISHNAIAH)
Type
Proprietorship Firm

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹5.5 crBuilding and development ₹41.8 crTotal ₹47.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹6.5 cr₹3.8 cr
Q4 2025-26₹2.4 cr₹3.0 cr
Q1 2026-27₹3.6 cr₹2.5 cr
Q2 2026-27₹2.6 cr₹1.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.25 kmReliable
  • Nearest railway station3.5 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.5 kmCaveat

Hospitals

  • Nearest hospital0.64 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km8Caveat
  • Median pupil-teacher ratio, schools within 1 km18.2 :1Caveat
  • Schools with library + playground + ICT lab (1 km)7Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAttibele PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.17 kmReliable
  • Nearest sewage treatment plant2.45 kmCaveat
  • Industrial zones within 1 km4Caveat
  • Nearest airfield runway (any, incl. military)13.39 kmCaveat
  • Nearest commercial-airport runway39.79 kmReliable
  • Distance to runway approach-path proxy38.94 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.82979, 77.68358), 2026-10-24. Each figure's source and caveat are in the full report.