Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

HRS Sai Guru Bliss Avenue

by HRS Sai Guru Developers LLP · 45 homes · 0.52 acres · 1 tower · Yelahanka

Upcoming Under construction, due Feb 2027. 100% built with 87% of the time used. 29% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
100% built

Due 14 Feb 2027. 87% of the time from RERA approval to the deadline has passed.

Built100%
Time used87%
How much is sold?32 left
29% booked

13 of 45 homes, as the builder reported for Q1 2026-27.

How crowded is it?More crowded
87 homes per acre

Similar projects within 3 km: 78 per acre. 47% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started14 Aug 2024
  2. Approved by RERA28 Oct 2024
  3. Today24 Oct 2026

    87% of the time to the deadline has passed.

  4. If it slips like a typical project16 Nov 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2675%
Q4 2025-2685%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

13 booked32 leftQ1 2026-27

Still available: 8 × 2 BHK, 24 × 3 BHK.

Booked, by type

2 BHK2 of 10
3 BHK11 of 35

Booked, each quarter

Q3 2025-266 of 45
Q4 2025-267 of 45
Q1 2026-2713 of 45

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,068 sq ft
99 m² carpet · sizes 1,068–1,445 sq ft (5 at this size)
545 m² land share · 36 m² balcony/terrace · 1 parking space
35 homes · 78% of the project
2 BHK
828 sq ft
77 m² carpet · sizes 828–887 sq ft (5 at this size)
373 m² land share · 24 m² balcony/terrace · 1 parking space
10 homes · 22% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

A5 floors

A: 45 homes, 18 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project87
Typical within 3 km (27)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project47%
Typical within 3 km (27)51%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.52 acres

2,099 m²

Ground covered by buildings
53% of the land

1,111 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.11 per home

50 covered, 0 open

Built-up area, all floors
73,657 sq ft

6,843 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
HRS Sai Guru Developers LLP
Type
Partnership Firm
PAN
AAQFH0157B
GSTIN
29AAQFH0157B1ZH

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹7.7 crBuilding and development ₹19.2 crTotal ₹27.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹78.8 lakh₹68.0 lakh
Q4 2025-26₹57.8 lakh₹39.0 lakh
Q1 2026-27₹3.2 cr₹2.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.22 kmReliable
  • Nearest railway station2.93 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km2Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.57 kmCaveat

Hospitals

  • Nearest hospital0.58 kmCaveat

Schools

  • Schools in pincode 560097 (UDISE+ census)74Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km20.9 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVidhyaranyapura PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km23Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.16 kmReliable
  • Nearest sewage treatment plant0.67 kmCaveat
  • Industrial zones within 1 km5Caveat
  • Nearest airfield runway (any, incl. military)3.59 kmCaveat
  • Nearest commercial-airport runway19.06 kmReliable
  • Distance to runway approach-path proxy13.1 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.07001, 77.56347), 2026-10-24. Each figure's source and caveat are in the full report.