RERA project · Residential/Group Housing
Hoysala Vemana
by Hoysala Lifespace LLP · 82 homes · 0.98 acres · 1 tower · Yelahanka
Upcoming Under construction, due Jun 2031. 4% built with 3% of the time used. 0% of homes booked.
At a glance
Due 30 Jun 2031. 3% of the time from RERA approval to the deadline has passed.
0 of 82 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 63 per acre. 54% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started30 Jun 2026
- Approved by RERA1 Sep 2026
- Today24 Oct 2026
3% of the time to the deadline has passed.
- Deadline30 Jun 2031
The date it must be complete by.
- If it slips like a typical project31 Mar 2032
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 34 × 2 BHK, 48 × 3 BHK.
Booked, by type
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Hoysala Vemana: 82 homes, 15 m tall, 1 basement
Amenities
- Electricity 66 m²
- CCTV Surveillance 3 m²
- Community Hall 83 m²
- Outdoor Sports facility 74 m²
- Indoor Sports facility 33 m²
- Swimming Pool 91 m²
- Gym 31 m²
- Parks 330 m²
- Power Backup 15 m²
- Water and Sanitation 60 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 0.98 acres
- Ground covered by buildings
- 46% of the land
- Floor-area ratio
- 2.00
- Parking
- 1.16 per home
- Built-up area, all floors
- 1,22,881 sq ft
3,966 m²
1,809 m²
Floors built per unit of land: 2.00 m² of floors for each m² of land.
90 covered, 5 open
11,416 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
The company
- Registered as
- Hoysala Lifespace LLP
- Type
- Partnership Firm
- Company number
- ACG-9882
- PAN
- AARFH0507Q
- GSTIN
- 29AARFH0507Q1ZR
CIN or LLPIN, from the Registrar of Companies.
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/472/PR/010926/008898 · Approved
- Building plan approvedDoddaballapur Planning Authority · DPA/TP/CC/140/2025-26 · 30 Jan 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,Local Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
109 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q2 2026-27 | ₹0.0 lakh | ₹0.0 lakh |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station14.95 kmReliable
- Nearest railway station1.31 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km2Caveat
- Nearest lake / water body (≥2 ha)1.41 kmCaveat
Hospitals
- Nearest hospital1.13 kmCaveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionRajanukunte PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km15Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)5.9 kmReliable
- Nearest sewage treatment plant6.08 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)5.92 kmCaveat
- Nearest commercial-airport runway14.86 kmReliable
- Distance to runway approach-path proxy6.78 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (13.17256, 77.55370), 2026-10-24. Each figure's source and caveat are in the full report.