RERA project · Residential/Group Housing
HONEY COMB HOMES
by HONEY COMB BUILDERS · 56 homes · 0.74 acres · 1 tower · Bengaluru South
Delivered on time Completed: the builder filed for completion on 6 Dec 2025, by the date it promised.
At a glance
The builder filed for completion on 6 Dec 2025, by the date it promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 80 per acre. 46% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started25 Apr 2023
- Approved by RERA8 Aug 2023
- Completion filed6 Dec 2025
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Honey Comb Homes: 56 homes, 15 m tall
Amenities
- Electricity 15 m²
- CCTV Surveillance 5 m²
- Community Hall 12 m²
- Parks 12 m²
- Power Backup 5 m²
- Water and Sanitation 11 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 0.74 acres
- Ground covered by buildings
- 54% of the land
- Floor-area ratio
- 1.75
- Parking
- 1.11 per home
- Built-up area, all floors
- 74,637 sq ft
3,009 m²
1,618 m²
Floors built per unit of land: 1.75 m² of floors for each m² of land.
62 covered, 0 open
6,934 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of HONEY COMB BUILDERS on the map
The company
- Registered as
- HONEY COMB BUILDERS
- Type
- Partnership Firm
- PAN
- AAOFH7731F
- GSTIN
- 29AAOFH7731FIZI
Its other registrations on RERA Karnataka
- HONEYCOMB SANCHIKE PRM/KA/RERA/1251/310/PR/111125/008241 · approved 11 Nov 2025
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/080823/006128 · Approved
- Building plan approvedBDA - Bangalore Development Authority · Bangalore development Authority /Plan sanction / Technical Assistant-2/ South /01/2023-24 · 11 Apr 2023
- Litigation on the landNone declared
- Litigation on the projectNot stated
- Water sourceBoreWell
Complaints to RERA about this project
None on RERA Karnataka.
Documents
194 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station1.43 kmReliable
- Nearest railway station2.83 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)1.06 kmCaveat
Hospitals
- Nearest hospital1.3 kmCaveat
Schools
- Schools in pincode 560060 (UDISE+ census)105Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionKumbalagudu PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km2Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)14.7 kmReliable
- Nearest sewage treatment plant0.5 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)20.46 kmCaveat
- Nearest commercial-airport runway40.22 kmReliable
- Distance to runway approach-path proxy34.85 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.89395, 77.47399), 2026-10-24. Each figure's source and caveat are in the full report.