RERA project · Residential/Group Housing

HM Scottsville

by HM Infratech Private Limited · 154 homes · 1.29 acres · 2 towers · Bengaluru East

Upcoming Under construction, due Jun 2027, after an extension. 82% built with 73% of the time used. 34% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
82% built

Due 30 Jun 2027. 73% of the time from RERA approval to the deadline has passed.

Built82%
Time used73%
How much is sold?101 left
34% booked

53 of 154 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
119 homes per acre

Similar projects within 3 km: 68 per acre. 72% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 12 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?Too early to tell
No deliveries yet

None of its 2 RERA projects in Bengaluru Urban has reached its deadline yet.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started5 Jan 2022
  2. Approved by RERA18 Dec 2024
  3. First promised30 Jun 2026

    The date the builder gave at registration.

  4. Today24 Oct 2026

    73% of the time to the deadline has passed.

  5. If it slips like a typical project31 Mar 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2670%
Q4 2025-2673%
Q1 2026-2775%
Q2 2026-2782%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A90%
Tower B82%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

53 booked101 leftQ2 2026-27

Still available: 35 × 2 BHK, 24 × 2.5 BHK, 42 × 3 BHK.

Booked, by type

2 BHK13 of 48
2.5 BHK4 of 28
3 BHK36 of 78

Booked, each quarter

Q3 2025-2634 of 154
Q4 2025-2636 of 154
Q1 2026-2748 of 154
Q2 2026-2753 of 154

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 970 sq ft11 homes90.1 m²
  • 1,076 sq ft11 homes100.0 m²
  • 1,140 sq ft11 homes105.9 m²
  • 1,039 sq ft10 homes96.5 m²
  • and 35 homes in other sizes
Typically 37 m² land share · 14 m² balcony/terrace · 1 parking space
78 homes · 51% of the project
2 BHK
  • 840 sq ft13 homes78.0 m²
  • 802 sq ft11 homes74.5 m²
  • 924 sq ft11 homes85.8 m²
  • 866 sq ft10 homes80.5 m²
  • and 3 homes in other sizes
Typically 31 m² land share · 14 m² balcony/terrace · 1 parking space
48 homes · 31% of the project
2.5 BHK
  • 849 sq ft7 homes78.9 m²
  • 888 sq ft7 homes82.5 m²
  • 928 sq ft7 homes86.2 m²
  • 944 sq ft7 homes87.7 m²
Typically 31 m² land share · 9 m² balcony/terrace · 1 parking space
28 homes · 18% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A19 floors
Tower B19 floors

Tower A: 76 homes, 62 m tall, 2 basements · Tower B: 78 homes, 62 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project119
Typical within 3 km (105)68
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project72%
Typical within 3 km (105)63%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.29 acres

5,239 m²

Ground covered by buildings
28% of the land

1,459 m²

Floor-area ratio
20,008.00

Floors built per unit of land: 20,008.00 m² of floors for each m² of land.

Parking
2.30 per home

123 covered, 54 open

Built-up area, all floors
3,06,481 sq ft

28,473 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of HM Infratech Private Limited on the map

Complaints to RERA about its other projects

The company

Registered as
HM Infratech Private Limited
Type
Company
PAN
AACCH0523J
GSTIN
29AACCH0523J1ZQ
Website
www.hmconstructions.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹8.5 crBuilding and development ₹87.3 crTotal ₹97.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹14.8 cr₹10.7 cr
Q4 2025-26₹38.3 cr₹24.1 cr
Q1 2026-27₹13.5 cr₹12.6 cr
Q2 2026-27₹5.6 cr₹8.8 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.07 kmReliable
  • Nearest railway station2.43 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km4Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)1.14 kmCaveat

Hospitals

  • Nearest hospital0.63 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km27.4 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.96 kmReliable
  • Nearest sewage treatment plant0.35 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)4.94 kmCaveat
  • Nearest commercial-airport runway31.3 kmReliable
  • Distance to runway approach-path proxy30.51 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.90659, 77.68345), 2026-10-24. Each figure's source and caveat are in the full report.