RERA project · Residential/Group Housing

HINDUJA EL JARDIN

by Hinduja Projects · 138 homes · 3.23 acres · 13 towers · Yelahanka

Upcoming Under construction, due Mar 2027, after an extension. 92% built with 95% of the time used. 49% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
92% built

Due 30 Mar 2027. 95% of the time from RERA approval to the deadline has passed.

Built92%
Time used95%
How much is sold?71 left
49% booked

67 of 138 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
43 homes per acre

Similar projects within 3 km: 83 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Feb 2019
  2. Approved by RERA22 Feb 2019
  3. First promised30 Jun 2025

    The date the builder gave at registration.

  4. Today24 Oct 2026

    95% of the time to the deadline has passed.

  5. If it slips like a typical project30 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2681%
Q4 2025-2689%
Q1 2026-2791%
Q2 2026-2792%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Iris91%
Jasmine91%
Lotus91%
Daisy91%
Carnation91%
Orchid91%
Sunflower93%
Lavender93%
Lilly93%
Magnolia93%
Daffodil93%
Rose93%
Tulip93%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

67 booked71 leftQ2 2026-27

Still available: 60 × 3BHK, 11 × 4BHK.

Booked, by type

3BHK35 of 95
4BHK32 of 43

Booked, each quarter

Q3 2025-2665 of 138
Q4 2025-2665 of 138
Q1 2026-2765 of 138
Q2 2026-2767 of 138

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
1,112 sq ft
103 m² carpet · sizes 1,105–1,678 sq ft (14 at this size)
97 m² land share · 25 m² balcony/terrace · 1 parking space
95 homes · 69% of the project
4BHK
1,475 sq ft
137 m² carpet · sizes 1,449–1,682 sq ft (8 at this size)
101 m² land share · 26 m² balcony/terrace · 1 parking space
43 homes · 31% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

Iris4 floors
Jasmine4 floors
Lotus4 floors
Daisy4 floors
Carnation4 floors
Orchid4 floors
Sunflower4 floors
Lavender4 floors
Lilly4 floors
Magnolia4 floors
Daffodil4 floors
Rose4 floors
Tulip4 floors

Iris: 12 homes, 1 basement · Jasmine: 12 homes, 1 basement · Lotus: 12 homes, 1 basement · Daisy: 12 homes, 1 basement · Carnation: 12 homes, 1 basement · Orchid: 12 homes, 1 basement · Sunflower: 12 homes, 1 basement · Lavender: 12 homes, 1 basement · Lilly: 12 homes, 1 basement · Magnolia: 12 homes, 1 basement · Daffodil: 9 homes, 1 basement · Rose: 6 homes, 1 basement · Tulip: 3 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project43
Typical within 3 km (15)83
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (16)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.23 acres

13,059 m²

Ground covered by buildings
47% of the land

6,118 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Hinduja Projects
Type
Partnership Firm
PAN
AAHFH1240G

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹11.3 cr
Construction
₹68.0 cr
Total project cost
₹79.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹7.3 cr₹5.1 cr
Q4 2025-26₹3.0 cr₹2.3 cr
Q1 2026-27₹4.0 cr₹2.8 cr
Q2 2026-27₹3.1 cr₹2.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station12.21 kmReliable
  • Nearest railway station7.89 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.94 kmCaveat

Hospitals

  • Nearest hospital2.26 kmCaveat

Schools

  • Schools in pincode 562149 (UDISE+ census)74Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBagalur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.99 kmReliable
  • Nearest sewage treatment plant6.54 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)5.99 kmCaveat
  • Nearest commercial-airport runway9.28 kmReliable
  • Distance to runway approach-path proxy7.98 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (13.10959, 77.66450), 2026-10-24. Each figure's source and caveat are in the full report.