Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

High Life Towers

by MEENAKSHI INFRRA PROJECTS · 198 homes · 2.70 acres · 2 towers · Bengaluru North

Upcoming Under construction, due Aug 2027. 49% built with 80% of the time used. 22% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
49% built

Due 5 Aug 2027. 80% of the time from RERA approval to the deadline has passed.

Built49%
Time used80%
How much is sold?245 left
22% booked

68 of 313 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
73 homes per acre

Similar projects within 3 km: 74 per acre. 86% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started18 May 2022
  2. Approved by RERA20 Sep 2023
  3. Today24 Oct 2026

    80% of the time to the deadline has passed.

  4. If it slips like a typical project6 May 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2643%
Q4 2025-2645%
Q1 2026-2746%
Q2 2026-2749%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 155%
Tower 233%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

68 booked245 leftQ2 2026-27

Still available: 187 × 2 BHK, 52 × 3 BHK, 6 × 2.5 BHK.

Booked, by type

2 BHK28 of 215
3 BHK32 of 84
2.5 BHK8 of 14

Booked, each quarter

Q3 2025-2650 of 313
Q4 2025-2658 of 313
Q1 2026-2762 of 313
Q2 2026-2768 of 313

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
684 sq ft
64 m² carpet · sizes 674–801 sq ft (43 at this size)
30 m² land share · 9 m² balcony/terrace · 1 parking space
215 homes · 69% of the project
3 BHK
930 sq ft
86 m² carpet · sizes 930–1,107 sq ft (14 at this size)
40 m² land share · 10 m² balcony/terrace · 1 parking space
84 homes · 27% of the project
2.5 BHK
793 sq ft
74 m² carpet
34 m² land share · 8 m² balcony/terrace · 1 parking space
14 homes · 4% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 114 floors
Tower 214 floors

Tower 1: 73 homes, 2 basements · Tower 2: 240 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project73
Typical within 3 km (81)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project86%
Typical within 3 km (81)56%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.70 acres

10,926 m²

Ground covered by buildings
14% of the land

1,550 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.24 per home

246 covered, 0 open

Built-up area, all floors
3,91,806 sq ft

36,400 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
MEENAKSHI INFRRA PROJECTS
Type
Partnership Firm
PAN
AAWFM5966B
GSTIN
29AAWFM5966B1ZN

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹60.0 crBuilding and development ₹91.2 crTotal ₹151.2 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.7 cr₹3.7 cr
Q4 2025-26₹4.8 cr₹4.8 cr
Q1 2026-27₹4.1 cr₹4.0 cr
Q2 2026-27₹6.1 cr₹6.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.21 kmReliable
  • Nearest railway station4.42 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km13Caveat
  • Nearest lake / water body (≥2 ha)1.1 kmCaveat

Hospitals

  • Nearest hospital1.05 kmCaveat

Schools

  • Schools in pincode 560045 (UDISE+ census)156Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km15Caveat
  • Median pupil-teacher ratio, schools within 1 km22.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSampigehalli PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)5.43 kmReliable
  • Nearest sewage treatment plant1.63 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)3.12 kmCaveat
  • Nearest commercial-airport runway16.13 kmReliable
  • Distance to runway approach-path proxy13.01 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)2Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)5Caveat

ReliableFrom our location report at the builder-entered pin (13.05929, 77.62329), 2026-10-24. Each figure's source and caveat are in the full report.