Upcoming Under construction, due Aug 2027. 21% built with 69% of the time used. 5% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
21% built

Due 31 Aug 2027. 69% of the time from RERA approval to the deadline has passed.

Built21%
Time used69%
How much is sold?40 left
5% booked

2 of 42 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
54 homes per acre

Similar projects within 3 km: 65 per acre. 87% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2024
  2. Approved by RERA13 Dec 2024
  3. Today24 Oct 2026

    69% of the time to the deadline has passed.

  4. If it slips like a typical project1 Jun 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2616%
Q4 2025-2618%
Q1 2026-2720%
Q2 2026-2721%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

2 booked40 leftQ2 2026-27

Still available: 2 × 1 BHK, 8 × 2 BHK, 30 × 3 BHK.

Booked, by type

1 BHK0 of 2
2 BHK0 of 8
3 BHK2 of 32

Booked, each quarter

Q3 2025-260 of 42
Q4 2025-261 of 42
Q1 2026-272 of 42
Q2 2026-272 of 42

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,428 sq ft
133 m² carpet · sizes 1,428–1,555 sq ft (8 at this size)
84 m² land share · 2 parking spaces
32 homes · 76% of the project
2 BHK
1,083 sq ft
101 m² carpet · sizes 798–1,088 sq ft (2 at this size)
48 m² land share · 1 parking space
8 homes · 19% of the project
1 BHK
1,023 sq ft
95 m² carpet · sizes 1,023–1,045 sq ft (1 at this size)
42 m² land share · 1 parking space
2 homes · 5% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A10 floors

Block A: 42 homes, 40 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project54
Typical within 3 km (43)65
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project87%
Typical within 3 km (43)58%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.78 acres

3,172 m²

Ground covered by buildings
13% of the land

414 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.71 per home

59 covered, 13 open

Built-up area, all floors
1,08,263 sq ft

10,058 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Sentient Devcon LLP
Type
Partnership Firm
PAN
AETFS0162A
GSTIN
29AETFS0162A1Z0
Website
https://sentientdevelopers.com/halcyon

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹45.0 crBuilding and development ₹50.2 crTotal ₹96.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹1.0 cr₹70.0 lakh
Q1 2026-27₹10.0 lakh₹7.0 lakh
Q2 2026-27₹49.5 lakh₹34.6 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.58 kmReliable
  • Nearest railway station6.52 kmReliable
  • Bus stops within 500 m13Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km11Caveat
  • Nearest lake / water body (≥2 ha)0.79 kmCaveat

Hospitals

  • Nearest hospital0.27 kmCaveat

Schools

  • Schools in pincode 560102 (UDISE+ census)38Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km10Caveat
  • Median pupil-teacher ratio, schools within 1 km16.9 :1Caveat
  • Schools with library + playground + ICT lab (1 km)7Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionH.S.R.Layout PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.87 kmReliable
  • Nearest sewage treatment plant0.97 kmCaveat
  • Industrial zones within 1 km4Caveat
  • Nearest airfield runway (any, incl. military)3.09 kmCaveat
  • Nearest commercial-airport runway29.99 kmReliable
  • Distance to runway approach-path proxy28.4 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat

ReliableFrom our location report at the builder-entered pin (12.92165, 77.64747), 2026-10-24. Each figure's source and caveat are in the full report.