RERA project · Residential/Group Housing
Haven Phase 2
by Lodha Developers Limited · 148 homes · 2.15 acres · 2 towers · Anekal
Upcoming Under construction, due Jun 2030. 11% built with 14% of the time used. 11% of homes booked.
At a glance
Due 30 Jun 2030. 14% of the time from RERA approval to the deadline has passed.
16 of 148 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 70 per acre. 82% of the land is left open.
Complaints to RERA about this project. 1 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
None of its 7 RERA projects in Bengaluru Urban has reached its deadline yet.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started25 Feb 2026
- Approved by RERA26 Mar 2026
- Today24 Oct 2026
14% of the time to the deadline has passed.
- Deadline30 Jun 2030
The date it must be complete by.
- If it slips like a typical project1 Apr 2031
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 1 × 2BHK+STUDY TYPE B, 103 × 3BHK LUXE, 2 × 3BHK+ STUDY TYPE A1, 22 × 3BHK+ STUDY TYPE B, 2 × 4BHK DUPLEX TYP B, 2 × 4BHK DUPLEX TYP C.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower D: 76 homes, 62 m tall · Tower E: 72 homes, 59 m tall
Amenities
- Electricity 119 m²
- CCTV Surveillance 9 m²
- Club House 3,088 m²
- Community Hall 577 m²
- Outdoor Sports facility 2,055 m²
- Indoor Sports facility 129 m²
- Swimming Pool 250 m²
- Gym 358 m²
- Parks 3,708 m²
- Power Backup 154 m²
- Piped Gas 18 m²
- Water and Sanitation 640 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.15 acres
- Ground covered by buildings
- 17% of the land
- Floor-area ratio
- 2.25
- Parking
- 1.00 per home
- Built-up area, all floors
- 2,75,319 sq ft
8,689 m²
1,517 m²
Floors built per unit of land: 2.25 m² of floors for each m² of land.
148 covered, 0 open
25,578 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 7 RERA projects of Lodha on the map
Complaints to RERA about its other projects
- Azur 1 complaint
The company
- Registered as
- Lodha Developers Limited
- Type
- Company
- Company number
- U45200MH1995PLC093041
- PAN
- AAACL1490J
- GSTIN
- 29AAACL1490J1ZC
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
6 registrations under this company
- Fiorana@Beaumont Estate(Phase-1) PRM/KA/RERA/1251/472/PR/200726/008829 · approved 20 Jul 2026
- Elanza PRM/KA/RERA/1251/308/PR/191225/008353 · approved 19 Dec 2025
- Azur Phase 2 PRM/KA/RERA/1251/310/PR/200925/008110 · approved 20 Sep 2025
- Haven PRM/KA/RERA/1251/308/PR/280525/007785 · approved 28 May 2025
- Azur Tower D PRM/KA/RERA/1251/310/PR/280324/006746 · approved 28 Mar 2024
- Azur PRM/KA/RERA/1251/310/PR/220324/006728 · approved 22 Mar 2024
The land is owned together with others (a joint development), including Icon Kabini LLP.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/260326/008551 · Approved
- Building plan approvedBDA - Bangalore Development Authority · BDA/PS/EM/EO-5/TA 2/E/71/2025-26 · 18 Feb 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,Local Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
166 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q4 2025-26 | ₹12.6 lakh | ₹12.6 lakh |
| Q1 2026-27 | ₹3.4 cr | ₹3.4 cr |
| Q2 2026-27 | ₹6.5 cr | ₹6.5 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station4.07 kmReliable
- Nearest railway station3.14 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km11Caveat
- Nearest lake / water body (≥2 ha)0.93 kmCaveat
Hospitals
- Nearest hospital1.5 kmCaveat
Schools
- Schools in pincode 560035 (UDISE+ census)45Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
- Schools with library + playground + ICT lab (1 km)2Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionBellanduru PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km2Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)4.58 kmReliable
- Nearest sewage treatment plant2.41 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)7.46 kmCaveat
- Nearest commercial-airport runway33.77 kmReliable
- Distance to runway approach-path proxy33.04 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.88416, 77.68923), 2026-10-24. Each figure's source and caveat are in the full report.