Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

HABULUS TRANQUIL

by HABULUS BUILDERS AND DEVELOPERS PRIVATE LIMITED · 400 homes · 4.57 acres · 4 towers · Bengaluru South

Upcoming Under construction, due Dec 2031. 16% built with 13% of the time used. 26% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
16% built

Due 31 Dec 2031. 13% of the time from RERA approval to the deadline has passed.

Built16%
Time used13%
How much is sold?294 left
26% booked

106 of 400 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
88 homes per acre

Similar projects within 3 km: 80 per acre. 68% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Dec 2025
  2. Approved by RERA2 Jan 2026
  3. Today24 Oct 2026

    13% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2032

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-268%
Q1 2026-2715%
Q2 2026-2716%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower-A20%
Tower - B20%
Tower - C20%
Tower - D20%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

106 booked294 leftQ2 2026-27

Still available: 145 × 2 BHK, 149 × 3 BHK.

Booked, by type

2 BHK55 of 200
3 BHK51 of 200

Booked, each quarter

Q4 2025-2653 of 400
Q1 2026-2775 of 400
Q2 2026-27106 of 400

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
673 sq ft
62 m² carpet · sizes 673–737 sq ft (100 at this size)
38 m² land share · 8 m² balcony/terrace · 1 parking space
200 homes · 50% of the project
3 BHK
886 sq ft
82 m² carpet · sizes 884–1,006 sq ft (78 at this size)
53 m² land share · 12 m² balcony/terrace · 1 parking space
200 homes · 50% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower-A13 floors
Tower - B13 floors
Tower - C12 floors
Tower - D12 floors

Tower-A: 104 homes, 47 m tall, 1 basement · Tower - B: 104 homes, 47 m tall, 1 basement · Tower - C: 96 homes, 44 m tall, 1 basement · Tower - D: 96 homes, 44 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project88
Typical within 3 km (33)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project68%
Typical within 3 km (33)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.57 acres

18,490 m²

Ground covered by buildings
32% of the land

5,977 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.39 per home

508 covered, 46 open

Built-up area, all floors
6,73,949 sq ft

62,612 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
HABULUS BUILDERS AND DEVELOPERS PRIVATE LIMITED
Type
Company
Company number
U70109KA2020PTC138905

CIN or LLPIN, from the Registrar of Companies.

PAN
AAFCH4570A
GSTIN
29AAFCH4570A1ZR

The land is owned together with others (a joint development), including M/s. BSR DEVELOPERS – rep. by Mr. RAMOJI GOWDA, M/s. BSR DEVELOPERS – rep. by Mr. RAMOJI GOWDA, Mr. N V NANJAPPA.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹17.2 crBuilding and development ₹211.4 crTotal ₹228.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹6.7 cr₹4.5 cr
Q1 2026-27₹8.4 cr₹1.3 cr
Q2 2026-27₹8.3 cr₹9.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.98 kmReliable
  • Nearest railway station5.77 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)0.61 kmCaveat

Hospitals

  • Nearest hospital2.51 kmCaveat

Schools

  • Schools in pincode 560099 (UDISE+ census)88Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionJigani PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.04 kmReliable
  • Nearest sewage treatment plant3.25 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)14.8 kmCaveat
  • Nearest commercial-airport runway41.57 kmReliable
  • Distance to runway approach-path proxy40.25 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.81499, 77.65795), 2026-10-24. Each figure's source and caveat are in the full report.