RERA project · Residential/Group Housing

Habitat Iluminar

by HV Ventures Projects Pvt Ltd · 412 homes · 4.87 acres · 10 towers · Bengaluru South

Delivered late Completed: the builder filed for completion on 7 Dec 2022, 706 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 7 Dec 2022, 706 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
84 homes per acre

Similar projects within 3 km: 78 per acre. 73% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 3 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 1 past due with no completion filed.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started28 May 2016
  2. Approved by RERA15 Sep 2017
  3. First promised31 Dec 2020

    The date the builder gave at registration.

  4. Completion filed7 Dec 2022

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

3BHK
936 sq ft
87 m² carpet · sizes 732–947 sq ft (66 at this size)
52 m² land share · 6 m² balcony/terrace · 1 parking space
264 homes · 64% of the project
2BHK
743 sq ft
69 m² carpet · sizes 732–764 sq ft (52 at this size)
41 m² land share · 3 m² balcony/terrace · 1 parking space
104 homes · 25% of the project
other
840 sq ft
78 m² carpet · sizes 840–883 sq ft (11 at this size)
49 m² land share · 6 m² balcony/terrace · 1 parking space
44 homes · 11% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

T0111 floors
T0211 floors
T0311 floors
T0410 floors
T0510 floors
T0610 floors
T0711 floors
T0811 floors
T0911 floors
T1011 floors

T01: 44 homes, 1 basement · T02: 44 homes, 1 basement · T03: 44 homes, 1 basement · T04: 40 homes, 1 basement · T05: 32 homes, 1 basement · T06: 32 homes, 1 basement · T07: 44 homes, 1 basement · T08: 44 homes, 1 basement · T09: 44 homes, 1 basement · T10: 44 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project84
Typical within 3 km (63)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project73%
Typical within 3 km (64)50%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.87 acres

19,728 m²

Ground covered by buildings
27% of the land

5,370 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of HV Ventures Projects Pvt Ltd on the map

Complaints to RERA about its other projects

The company

Registered as
HV Ventures Projects Pvt Ltd
Type
Company
Company number
U45205KA2015PTC079180

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCH5701K

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹12.0 cr
Construction
₹110.0 cr
Total project cost
₹122.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station0.64 kmReliable
  • Nearest railway station1.08 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)0.6 kmCaveat

Hospitals

  • Nearest hospital1.1 kmCaveat

Schools

  • Schools in pincode 560059 (UDISE+ census)12Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km22 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionKengeri PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)11 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km2Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)14.49 kmReliable
  • Nearest sewage treatment plant0.33 kmCaveat
  • Industrial zones within 1 km6Caveat
  • Nearest airfield runway (any, incl. military)17.79 kmCaveat
  • Nearest commercial-airport runway37.01 kmReliable
  • Distance to runway approach-path proxy31.75 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.91590, 77.49360), 2026-10-24. Each figure's source and caveat are in the full report.