Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

GREEN STOREYS

by MODERN SPACES · 135 homes · 2.44 acres · 2 towers · Anekal

Upcoming Under construction, due Dec 2026. 58% built with 90% of the time used. 40% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
58% built

Due 31 Dec 2026. 90% of the time from RERA approval to the deadline has passed.

Built58%
Time used90%
How much is sold?81 left
40% booked

54 of 135 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
55 homes per acre

Similar projects within 3 km: 70 per acre. 82% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?3 due so far
67% on time

Of its 5 RERA projects in Bengaluru Urban: 2 delivered on time, 1 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Oct 2018
  2. Approved by RERA17 Jan 2025
  3. Today24 Oct 2026

    90% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2639%
Q4 2025-2645%
Q1 2026-2755%
Q2 2026-2758%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower -A58%
Tower -B58%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

54 booked81 leftQ2 2026-27

Still available: 15 × 2 BHK, 66 × 3 BHK.

Booked, by type

2 BHK18 of 33
3 BHK36 of 102

Booked, each quarter

Q3 2025-2637 of 135
Q4 2025-2638 of 135
Q1 2026-2743 of 135
Q2 2026-2754 of 135

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
  • 1,099 sq ft48 homes102.1 m²
  • 1,143 sq ft38 homes106.2 m²
  • 1,086 sq ft14 homes100.9 m²
  • 869 sq ft1 home80.7 m²
  • and 1 home in other sizes
Typically 78 m² land share · 22 m² balcony/terrace · 1 parking space
102 homes · 76% of the project
2 BHK
  • 869 sq ft17 homes80.7 m²
  • 883 sq ft12 homes82.0 m²
  • 928 sq ft4 homes86.2 m²
Typically 58 m² land share · 13 m² balcony/terrace · 1 parking space
33 homes · 24% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower -A8 floors
Tower -B9 floors

Tower -A: 62 homes, 28 m tall, 1 basement · Tower -B: 73 homes, 30 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project55
Typical within 3 km (72)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project82%
Typical within 3 km (74)59%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.44 acres

9,864 m²

Ground covered by buildings
18% of the land

1,767 m²

Floor-area ratio
2.00

Floors built per unit of land: 2.00 m² of floors for each m² of land.

Parking
1.18 per home

159 covered, 0 open

Built-up area, all floors
3,24,112 sq ft

30,111 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of Modern Spaces on the map

The company

Registered as
MODERN SPACES
Type
Partnership Firm
PAN
ABRFM2213K
GSTIN
29ABRFM2213K1ZX
Website
www.modernspaaces.com

Its other registrations on RERA Karnataka

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹42.0 crBuilding and development ₹99.5 crTotal ₹141.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹3.9 cr₹2.7 cr
Q4 2025-26₹6.4 cr₹4.5 cr
Q1 2026-27₹3.5 cr₹2.5 cr
Q2 2026-27₹7.1 cr₹4.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.21 kmReliable
  • Nearest railway station7.66 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.19 kmCaveat

Hospitals

  • Nearest hospital0.82 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.63 kmReliable
  • Nearest sewage treatment plant5.22 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)12.77 kmCaveat
  • Nearest commercial-airport runway36.22 kmReliable
  • Distance to runway approach-path proxy34.74 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.86338, 77.76043), 2026-10-24. Each figure's source and caveat are in the full report.