Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

GREEN BOULEVARD

by TWENTY FIRST CASTLE DEVELOPERS LLP · 336 homes · 3.10 acres · 1 tower · Anekal

Upcoming Under construction, due Mar 2027. 92% built with 92% of the time used. 95% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
92% built

Due 15 Mar 2027. 92% of the time from RERA approval to the deadline has passed.

Built92%
Time used92%
How much is sold?17 left
95% booked

319 of 336 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
108 homes per acre

Similar projects within 3 km: 62 per acre. 71% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started15 Mar 2022
  2. Approved by RERA31 Mar 2022
  3. Today24 Oct 2026

    92% of the time to the deadline has passed.

  4. If it slips like a typical project15 Dec 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2666%
Q4 2025-2681%
Q1 2026-2788%
Q2 2026-2792%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

319 booked17 leftQ2 2026-27

Still available: 2 × 2 BHK, 15 × 3 BHK.

Booked, by type

1 BHK32 of 32
2 BHK231 of 233
3 BHK56 of 71

Booked, each quarter

Q3 2025-26291 of 336
Q4 2025-26291 of 336
Q1 2026-27310 of 336
Q2 2026-27319 of 336

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
  • 561 sq ft77 homes52.1 m²
  • 558 sq ft35 homes51.8 m²
  • 565 sq ft35 homes52.5 m²
  • 554 sq ft28 homes51.5 m²
  • and 58 homes in other sizes
Typically 21 m² land share · 28 m² balcony/terrace · 1 parking space
233 homes · 69% of the project
3 BHK
  • 762 sq ft24 homes70.8 m²
  • 727 sq ft21 homes67.5 m²
  • 746 sq ft15 homes69.3 m²
  • 758 sq ft8 homes70.4 m²
  • and 3 homes in other sizes
Typically 29 m² land share · 39 m² balcony/terrace · 1 parking space
71 homes · 21% of the project
1 BHK
  • 250 sq ft31 homes23.2 m²
  • 240 sq ft1 home22.3 m²
Typically 12 m² land share · 21 m² balcony/terrace · 1 parking space
32 homes · 10% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Green Boulevard8 floors

Green Boulevard: 336 homes, 27 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project108
Typical within 3 km (46)62
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project71%
Typical within 3 km (46)57%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.10 acres

12,545 m²

Ground covered by buildings
29% of the land

3,635 m²

Floor-area ratio
2.24

Floors built per unit of land: 2.24 m² of floors for each m² of land.

Parking
1.68 per home

252 covered, 30 open

Built-up area, all floors
3,94,723 sq ft

36,671 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
TWENTY FIRST CASTLE DEVELOPERS LLP
Type
Partnership Firm
PAN
AACFZ0180C
GSTIN
29AACFZ0180C1ZC

The land is owned together with others (a joint development), including 21st CASTLE DEVELOPERS LLP.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹5.5 crBuilding and development ₹78.5 crTotal ₹84.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹10.0 cr₹9.0 cr
Q4 2025-26₹12.1 cr₹10.4 cr
Q1 2026-27₹11.8 cr₹8.3 cr
Q2 2026-27₹8.9 cr₹7.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.74 kmReliable
  • Nearest railway station7.53 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.55 kmCaveat

Hospitals

  • Nearest hospital2.82 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km16.2 :1Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)15.34 kmReliable
  • Nearest sewage treatment plant3.36 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)16.2 kmCaveat
  • Nearest commercial-airport runway39.41 kmReliable
  • Distance to runway approach-path proxy37.56 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.83622, 77.77646), 2026-10-24. Each figure's source and caveat are in the full report.