Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

GRC SHREEKRISH

by GRC INFRA · 244 homes · 3.57 acres · 2 towers · Anekal

Upcoming Under construction, due Dec 2026. 100% built with 96% of the time used. 53% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
100% built

Due 31 Dec 2026. 96% of the time from RERA approval to the deadline has passed.

Built100%
Time used96%
How much is sold?114 left
53% booked

130 of 244 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
68 homes per acre

Similar projects within 3 km: 70 per acre. 64% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
50% on time

Of its 8 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 6 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started20 Feb 2022
  2. Approved by RERA2 Sep 2022
  3. Today24 Oct 2026

    96% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2687%
Q4 2025-2691%
Q1 2026-2796%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

A97%
B95%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

130 booked114 leftQ2 2026-27

Still available: 41 × 2 BHK, 16 × 2.5 Bhk, 57 × 3 BHK.

Booked, by type

2 BHK38 of 79
2.5 Bhk24 of 40
3 BHK68 of 125

Booked, each quarter

Q3 2025-26125 of 244
Q4 2025-26125 of 244
Q1 2026-27128 of 244
Q2 2026-27130 of 244

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
930 sq ft
86 m² carpet · sizes 828–1,018 sq ft (25 at this size)
57 m² land share · 1 parking space
125 homes · 51% of the project
2 BHK
735 sq ft
68 m² carpet · sizes 674–820 sq ft (15 at this size)
48 m² land share · 1 parking space
79 homes · 32% of the project
2.5 Bhk
836 sq ft
78 m² carpet · sizes 797–896 sq ft (25 at this size)
51 m² land share · 1 parking space
40 homes · 16% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

A4 floors
B4 floors

A: 94 homes, 15 m tall, 1 basement · B: 150 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project68
Typical within 3 km (122)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project64%
Typical within 3 km (122)66%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.57 acres

14,467 m²

Ground covered by buildings
36% of the land

5,238 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
2.20 per home

258 covered, 11 open

Built-up area, all floors
3,61,936 sq ft

33,625 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 8 RERA projects of GRC INFRA on the map

The company

Registered as
GRC INFRA
Type
Partnership Firm
PAN
AAVFG7135R
GSTIN
29AAVFG7135R1Z8
Website
www.grcinfra.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹2.7 crBuilding and development ₹94.4 crTotal ₹97.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹7.0 cr₹7.0 cr
Q4 2025-26₹1.7 cr₹1.7 cr
Q1 2026-27₹3.6 cr₹3.6 cr
Q2 2026-27₹3.5 cr₹3.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.36 kmReliable
  • Nearest railway station3.73 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km5Caveat
  • Nearest lake / water body (≥2 ha)0.24 kmCaveat

Hospitals

  • Nearest hospital1.79 kmCaveat

Schools

  • Schools in pincode 560099 (UDISE+ census)88Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
  • Median pupil-teacher ratio, schools within 1 km34.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km5Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.61 kmReliable
  • Nearest sewage treatment plant1.44 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)7.28 kmCaveat
  • Nearest commercial-airport runway33.7 kmReliable
  • Distance to runway approach-path proxy32.84 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.88500, 77.68016), 2026-10-24. Each figure's source and caveat are in the full report.