RERA project · Residential/Group Housing

GRC SAPPHIRE SPRING - PHASE -3

by GRC Infra Pvt. Ltd. · 52 homes · 0.87 acres · 1 tower · Bengaluru South

Upcoming Under construction, due Jul 2030. 1% built with 31% of the time used. 0% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
1% built

Due 31 Jul 2030. 31% of the time from RERA approval to the deadline has passed.

Built1%
Time used31%
How much is sold?52 left
0% booked

0 of 52 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
60 homes per acre

Similar projects within 3 km: 75 per acre. 64% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?2 due so far
50% on time

Of its 8 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised), 6 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA3 Feb 2025
  2. Work started10 Jun 2026
  3. Today24 Oct 2026

    31% of the time to the deadline has passed.

  4. If it slips like a typical project2 May 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-261%
Q4 2025-261%
Q1 2026-271%
Q2 2026-271%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

0 booked52 leftQ2 2026-27

Still available: 4 × Facility centre, 48 × Studio.

Booked, by type

Facility centre0 of 4
Studio0 of 48

Booked, each quarter

Q3 2025-260 of 52
Q4 2025-260 of 52
Q1 2026-270 of 52
Q2 2026-270 of 52

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

Studio
258 sq ft
24 m² carpet · sizes 248–291 sq ft (46 at this size)
28 m² land share · 3 m² balcony/terrace · 1 parking space
48 homes · 92% of the project
Facility centre
2,982 sq ft
277 m² carpet · sizes 2,982–4,941 sq ft (1 at this size)
492 m² land share · 13 parking spaces
4 homes · 8% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Facilities centre7 floors

Facilities centre: 52 homes, 26 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project60
Typical within 3 km (61)75
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project64%
Typical within 3 km (62)52%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.87 acres

3,507 m²

Ground covered by buildings
36% of the land

1,268 m²

Floor-area ratio
1.50

Floors built per unit of land: 1.50 m² of floors for each m² of land.

Parking
2.12 per home

100 covered, 10 open

Built-up area, all floors
38,007 sq ft

3,531 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 8 RERA projects of GRC INFRA on the map

Complaints to RERA about its other projects

The company

Registered as
GRC Infra Pvt. Ltd.
Type
Company
Company number
U45201KA2009PTC051798

CIN or LLPIN, from the Registrar of Companies.

PAN
AADCG6210G
GSTIN
29AADCG6210G1ZT
Website
WWW.GRCINFRA.COM

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹16.5 crBuilding and development ₹23.5 crTotal ₹40.0 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹0.0 lakh₹0.0 lakh
Q1 2026-27₹0.0 lakh₹0.0 lakh
Q2 2026-27₹0.0 lakh₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.12 kmReliable
  • Nearest railway station12.45 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.25 kmCaveat

Hospitals

  • Nearest hospital0.64 kmCaveat

Schools

  • Schools in pincode 560083 (UDISE+ census)111Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km12Caveat
  • Median pupil-teacher ratio, schools within 1 km21.9 :1Caveat
  • Schools with library + playground + ICT lab (1 km)10Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionHulimavu PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)26 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well10.8 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.12 kmReliable
  • Nearest sewage treatment plant1.79 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)12.46 kmCaveat
  • Nearest commercial-airport runway38.64 kmReliable
  • Distance to runway approach-path proxy35.83 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.85338, 77.59292), 2026-10-24. Each figure's source and caveat are in the full report.