by Ranke Infra LLP · 57 homes · 2.91 acres · 8 towers · Anekal

Upcoming Under construction, due Jan 2029. 43% built with 38% of the time used. 7% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
43% built

Due 31 Jan 2029. 38% of the time from RERA approval to the deadline has passed.

Built43%
Time used38%
How much is sold?54 left
7% booked

4 of 58 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
20 homes per acre

Similar projects within 3 km: 71 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started23 Apr 2025
  2. Approved by RERA2 Jun 2025
  3. Today24 Oct 2026

    38% of the time to the deadline has passed.

  4. If it slips like a typical project2 Nov 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2628%
Q4 2025-2633%
Q1 2026-2738%
Q2 2026-2743%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block 140%
Block 230%
Block 330%
Block 425%
Block 525%
Block 625%
Block 725%
Block 825%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

4 booked54 leftQ2 2026-27

Still available: 54 × 4 BHK + Fam + MP.

Booked, by type

COMMERCIAL1 of 1
4 BHK + Fam + MP3 of 57

Booked, each quarter

Q3 2025-268 of 58
Q4 2025-262 of 58
Q1 2026-2710 of 58
Q2 2026-274 of 58

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BHK + Fam + MP
3,050 sq ft
283 m² carpet · sizes 3,043–3,316 sq ft (17 at this size)
197 m² land share · 40 m² balcony/terrace · 2 parking spaces
57 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block 14 floors
Block 23 floors
Block 33 floors
Block 43 floors
Block 53 floors
Block 63 floors
Block 73 floors
Block 83 floors

Block 1: 1 home, 15 m tall · Block 2: 7 homes, 15 m tall · Block 3: 8 homes, 15 m tall · Block 4: 8 homes, 15 m tall · Block 5: 8 homes, 15 m tall · Block 6: 9 homes, 15 m tall · Block 7: 9 homes, 15 m tall · Block 8: 8 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project20
Typical within 3 km (110)71
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (110)64%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.91 acres

11,760 m²

Ground covered by buildings
50% of the land

5,865 m²

Floor-area ratio
1.75

Floors built per unit of land: 1.75 m² of floors for each m² of land.

Parking
2.19 per home

115 covered, 10 open

Built-up area, all floors
2,07,872 sq ft

19,312 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Ranke Infra LLP
Type
Partnership Firm
Company number
ACE-1633

CIN or LLPIN, from the Registrar of Companies.

PAN
ABIFR2001F
GSTIN
29ABIFR2001F1ZI

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹13.8 crBuilding and development ₹95.1 crTotal ₹108.9 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹0.0 lakh₹0.0 lakh
Q4 2025-26₹63.0 lakh₹63.0 lakh
Q1 2026-27₹13.5 lakh₹13.5 lakh
Q2 2026-27₹2.1 cr₹2.1 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.18 kmReliable
  • Nearest railway station3.92 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km4Caveat
  • Nearest lake / water body (≥2 ha)0.28 kmCaveat

Hospitals

  • Nearest hospital1.78 kmCaveat

Schools

  • Schools in pincode 560099 (UDISE+ census)88Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
  • Median pupil-teacher ratio, schools within 1 km34.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)5Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km5Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)3.41 kmReliable
  • Nearest sewage treatment plant1.22 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)7.29 kmCaveat
  • Nearest commercial-airport runway33.74 kmReliable
  • Distance to runway approach-path proxy32.84 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.88469, 77.67812), 2026-10-24. Each figure's source and caveat are in the full report.