RERA project · Residential/Group Housing
GR SITARA
by GR CONSTRUCTIONS · 250 homes · 3.02 acres · 11 towers · Anekal
Upcoming Under construction, due Dec 2026. 100% built with 96% of the time used. 100% of homes booked.
At a glance
Due 31 Dec 2026. 96% of the time from RERA approval to the deadline has passed.
250 of 250 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 72 per acre. 54% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 2 late (after the date first promised), 1 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started20 Jan 2022
- Approved by RERA11 Apr 2022
- Today24 Oct 2026
96% of the time to the deadline has passed.
- Deadline31 Dec 2026
The date it must be complete by.
- If it slips like a typical project2 Oct 2027
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Block A: 40 homes, 15 m tall, 2 basements · Block B: 30 homes, 15 m tall, 2 basements · Block C: 20 homes, 15 m tall, 1 basement · BLock D: 20 homes, 15 m tall, 1 basement · Block E: 20 homes, 15 m tall, 1 basement · Block F: 20 homes, 15 m tall, 1 basement · Block G: 20 homes, 15 m tall, 2 basements · Block H: 20 homes, 15 m tall, 2 basements · Block I: 20 homes, 15 m tall, 2 basements · Block J: 20 homes, 15 m tall, 2 basements · Block K: 20 homes, 15 m tall, 2 basements
Amenities
- Electricity
- CCTV Surveillance
- Club House
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 3.02 acres
- Ground covered by buildings
- 46% of the land
- Floor-area ratio
- 2.24
- Parking
- 1.14 per home
- Built-up area, all floors
- 2,75,319 sq ft
12,241 m²
5,596 m²
Floors built per unit of land: 2.24 m² of floors for each m² of land.
285 covered, 0 open
25,578 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of GR CONSTRUCTIONS on the map
The company
- Registered as
- GR CONSTRUCTIONS
- Type
- Partnership Firm
- PAN
- AADFG6207A
- GSTIN
- 29AADFG6207A1ZU
- Website
- www.grconstructions.co.in
Its other registrations on RERA Karnataka
- G.R. SAMSKRUTHI PRM/KA/RERA/1251/308/PR/201215/003745 · approved 15 Dec 2020
- ONE&ONLY (Phase II of GR Santhrupthi) PRM/KA/RERA/1251/308/PR/190829/002827 · approved 29 Aug 2019
- ONE&ONLY (Phase 1 of GR Santhrupthi) PRM/KA/RERA/1251/308/PR/180319/002414 · approved 19 Mar 2018
The land is owned together with others (a joint development), including G R Constructions.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/110422/004824 · Approved
- Building plan approvedBDA - Bangalore Development Authority · BDA/LP/AS/AA-1/TS-4/PURVA/15/21-22 · 11 Oct 2021
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBoreWell,Local Authority
Complaints to RERA about this project
- fraud and inaccurate parking allotment after taking money 19 Aug 2024 · Disposed Authority Fullbench
Documents
157 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹5.4 cr | ₹4.8 cr |
| Q4 2025-26 | ₹5.4 cr | ₹4.8 cr |
| Q1 2026-27 | ₹5.4 cr | ₹4.8 cr |
| Q2 2026-27 | ₹5.4 cr | ₹4.8 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station2.72 kmReliable
- Nearest railway station4.36 kmReliable
- Bus stops within 500 m1Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km1Caveat
- Nearest lake / water body (≥2 ha)0.75 kmCaveat
Hospitals
- Nearest hospital2.18 kmCaveat
Schools
- Schools in pincode 560099 (UDISE+ census)88Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km9Caveat
- Median pupil-teacher ratio, schools within 1 km30.8 :1Caveat
- Schools with library + playground + ICT lab (1 km)6Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionparappana AgraharaReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km5Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)3.39 kmReliable
- Nearest sewage treatment plant1 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)7.7 kmCaveat
- Nearest commercial-airport runway34.17 kmReliable
- Distance to runway approach-path proxy33.24 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (12.88087, 77.67607), 2026-10-24. Each figure's source and caveat are in the full report.