by Godrej Properties Limited · 2,168 homes · 11.21 acres · 13 towers · Bengaluru East

Upcoming Under construction, due Jan 2029. 32% built with 52% of the time used. 100% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
32% built

Due 31 Jan 2029. 52% of the time from RERA approval to the deadline has passed.

Built32%
Time used52%
How much is sold?3 left
100% booked

2,165 of 2,168 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
194 homes per acre

Similar projects within 3 km: 72 per acre. 78% of the land is left open.

Any complaints?See the list
5 complaints

Complaints to RERA about this project. 60 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?12 due so far
33% on time

Of its 29 RERA projects in Bengaluru Urban: 4 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started31 Jan 2024
  2. Approved by RERA17 May 2024
  3. Today24 Oct 2026

    52% of the time to the deadline has passed.

  4. If it slips like a typical project2 Nov 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2618%
Q4 2025-2624%
Q1 2026-2726%
Q2 2026-2732%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower D35%
E32%
F31%
G32%
H32%
J34%
K35%
L31%
M28%
N27%
A32%
B32%
C32%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

2,165 booked3 leftQ2 2026-27

Still available: 2 × 2 BHK, 1 × 1BT-EWS.

Booked, by type

2 BHK478 of 480
3 BHK1,436 of 1,436
2.5 BHK9 of 9
4 BHK77 of 77
1BT-EWS159 of 160
1 BHK6 of 6

Booked, each quarter

Q3 2025-262,158 of 2,168
Q4 2025-262,161 of 2,168
Q1 2026-272,161 of 2,168
Q2 2026-272,165 of 2,168

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,213 sq ft
113 m² carpet · sizes 751–1,491 sq ft (453 at this size)
39 m² land share · 15 m² balcony/terrace · 1 parking space
1,436 homes · 66% of the project
2 BHK
749 sq ft
70 m² carpet · sizes 717–1,190 sq ft (288 at this size)
26 m² land share · 11 m² balcony/terrace · 1 parking space
480 homes · 22% of the project
1BT-EWS
125 sq ft
12 m² carpet · sizes 103–125 sq ft (76 at this size)
4 m² land share · 1 parking space
160 homes · 7% of the project
4 BHK
1,661 sq ft
154 m² carpet · sizes 1,042–1,732 sq ft (38 at this size)
57 m² land share · 19 m² balcony/terrace · 1 parking space
77 homes · 4% of the project
2.5 BHK
1,139 sq ft
106 m² carpet · sizes 868–1,428 sq ft (3 at this size)
39 m² land share · 15 m² balcony/terrace · 1 parking space
9 homes · 0% of the project
1 BHK
491 sq ft
46 m² carpet
17 m² land share · 1 parking space
6 homes · 0% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower D39 floors
E39 floors
F39 floors
G39 floors
H39 floors
J39 floors
K39 floors
L39 floors
M39 floors
N39 floors
A38 floors
B38 floors
C38 floors

Tower D: 158 homes, 118 m tall, 3 basements · E: 158 homes, 118 m tall, 3 basements · F: 158 homes, 118 m tall, 3 basements · G: 150 homes, 118 m tall, 3 basements · H: 150 homes, 118 m tall, 3 basements · J: 150 homes, 118 m tall, 3 basements · K: 150 homes, 118 m tall, 3 basements · L: 236 homes, 120 m tall, 3 basements · M: 196 homes, 120 m tall, 3 basements · N: 200 homes, 120 m tall, 3 basements · A: 154 homes, 115 m tall, 2 basements · B: 154 homes, 115 m tall, 2 basements · C: 154 homes, 115 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project194
Typical within 3 km (59)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (59)72%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
11.21 acres

45,352 m²

Ground covered by buildings
22% of the land

10,200 m²

Floor-area ratio
3.25

Floors built per unit of land: 3.25 m² of floors for each m² of land.

Parking
1.14 per home

2,257 covered, 217 open

Built-up area, all floors
34,50,745 sq ft

3,20,585 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 29 RERA projects of Godrej Properties on the map

Complaints to RERA about its other projects

60 complaints across 12 projects. The most complained about:

Show all 12 projects
  • Godrej Woodscapes Phase 2 2 complaints
  • GODREJ LAKESIDE ORCHARD 2 complaints
  • Godrej Splendour Phase II 2 complaints
  • Godrej Woodland Phase 2 1 complaint
  • Godrej Park Retreat Phase 2 1 complaint
  • GODREJ TIARA 1 complaint
  • GODREJ WOODS 1 complaint

The company

Registered as
Godrej Properties Limited
Type
Company
PAN
AAACG3995M
GSTIN
29AAACG3995M1ZX
Website
www.godrejproperties.com

Its other registrations on RERA Karnataka

17 registrations under this company
  • GODREJ FLORENNE PHASE III PRM/KA/RERA/1250/304/PR/121026/009010 · approved 12 Oct 2026
  • GODREJ FLORENNE PHASE II PRM/KA/RERA/1250/304/PR/150926/008943 · approved 15 Sep 2026
  • GODREJ FLORENNE PRM/KA/RERA/1250/304/PR/150926/008942 · approved 15 Sep 2026
  • Boulevard at Godrej Woodscapes PRM/KA/RERA/1251/446/PR/190826/008878 · approved 19 Aug 2026
  • Godrej Regent Park PRM/KA/RERA/1251/308/PR/150726/008810 · approved 15 Jul 2026
  • GODREJ PARKSHIRE PRM/KA/RERA/1250/304/PR/090126/008393 · approved 9 Jan 2026
  • GODREJ WOODS PRM/KA/RERA/1251/472/PR/121125/008248 · approved 12 Nov 2025
  • GODREJ TIARA PRM/KA/RERA/1251/309/PR/110625/007817 · approved 11 Jun 2025
  • GODREJ LAKESIDE ORCHARD PRM/KA/RERA/1251/446/PR/300924/007105 · approved 30 Sep 2024
  • Godrej Woodscapes Phase 2 PRM/KA/RERA/1251/446/PR/170524/006888 · approved 17 May 2024
  • Godrej Park Retreat Phase 2 PRM/KA/RERA/1251/446/PR/130723/006056 · approved 13 Jul 2023
  • Godrej Splendour Phase II PRM/KA/RERA/1251/446/PR/120123/005611 · approved 12 Jan 2023
  • Godrej Woodland Phase 2 PRM/KA/RERA/1250/304/PR/020922/005201 · approved 2 Sep 2022
  • Godrej Splendour PRM/KA/RERA/1251/446/PR/160622/005000 · approved 16 Jun 2022
  • GODREJ PARK RETREAT PRM/KA/RERA/1251/446/PR/280222/004736 · approved 28 Feb 2022
  • Godrej Woodland PRM/KA/RERA/1250/304/PR/210208/003856 · approved 8 Feb 2021
  • Godrej Aqua PRM/KA/RERA/1251/309/PR/190102/002277 · approved 2 Jan 2019

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹390.5 crBuilding and development ₹1967.8 crTotal ₹2358.3 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹110.6 cr₹222.8 cr
Q4 2025-26₹185.7 cr₹167.2 cr
Q1 2026-27₹59.5 cr₹36.5 cr
Q2 2026-27₹144.1 cr₹186.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.84 kmReliable
  • Nearest railway station5.82 kmReliable
  • Bus stops within 500 m3Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.76 kmCaveat

Hospitals

  • Nearest hospital2.11 kmCaveat

Schools

  • Schools in pincode 560049 (UDISE+ census)110Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAvalahally PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well60.8 m below groundCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.41 kmReliable
  • Nearest sewage treatment plant1.22 kmCaveat
  • Industrial zones within 1 km11Caveat
  • Nearest airfield runway (any, incl. military)8.15 kmCaveat
  • Nearest commercial-airport runway15.83 kmReliable
  • Distance to runway approach-path proxy14.61 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (13.04825, 77.75192), 2026-10-24. Each figure's source and caveat are in the full report.