Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

GODREJ WOODS

by GODREJ PROPERTIES LIMITED · 558 homes · 6.90 acres · 10 towers · Yelahanka

Upcoming Under construction, due Nov 2030. 8% built with 19% of the time used. 51% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
8% built

Due 30 Nov 2030. 19% of the time from RERA approval to the deadline has passed.

Built8%
Time used19%
How much is sold?276 left
51% booked

282 of 558 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
81 homes per acre

Similar projects within 3 km: 80 per acre. 78% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project. 64 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?12 due so far
33% on time

Of its 29 RERA projects in Bengaluru Urban: 4 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA12 Nov 2025
  2. Work started25 Nov 2025
  3. Today24 Oct 2026

    19% of the time to the deadline has passed.

  4. If it slips like a typical project1 Sep 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-260%
Q4 2025-262%
Q1 2026-274%
Q2 2026-278%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 12%
Tower 24%
Tower 34%
Tower 41%
Tower 510%
Tower 612%
Tower 712%
Tower 811%
Tower 913%
Tower 1012%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

282 booked276 leftQ2 2026-27

Still available: 2 × 2BHK+2T TYPE 2(A), 2 × 2BHK+2T TYPE 2(B), 97 × 3BHK+3T TYPE 2, 42 × 3BHK+3T TYPE 3, 15 × 2BHK+2T TYPE 1A, 15 × 2BHK+2T TYPE 2B, 12 × 3BHK+3T TYPE 4, 75 × 3BHK+3T TYPE 1, 3 × 2BHK+2T TYPE 2A, 12 × 3BHK+3T TYPE 5, 1 × 2BHK+2T TYPE 4.

Booked, by type

2BHK+2T TYPE 2(A)11 of 13
2BHK+2T TYPE 2(B)11 of 13
3BHK+3T TYPE 241 of 138
3BHK+3T TYPE 312 of 54
2BHK+2T TYPE 1A51 of 66
2BHK+2T TYPE 2B74 of 89
2BHK+2T TYPE 32 of 2
3BHK+3T TYPE 42 of 14
2BHK+2T TYPE 1B14 of 14
3BHK+3T TYPE 137 of 112
2BHK+2T TYPE 2A24 of 27
3BHK+3T TYPE 52 of 14
2BHK+2T TYPE 41 of 2

Booked, each quarter

Q3 2025-26190 of 558
Q4 2025-26253 of 505
Q1 2026-27274 of 558
Q2 2026-27282 of 558

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK+3T TYPE 2
1,026 sq ft
95 m² carpet
46 m² land share · 26 m² balcony/terrace · 1 parking space
138 homes · 25% of the project
3BHK+3T TYPE 1
1,173 sq ft
109 m² carpet
54 m² land share · 31 m² balcony/terrace · 1 parking space
112 homes · 20% of the project
2BHK+2T TYPE 2B
719 sq ft
67 m² carpet
29 m² land share · 10 m² balcony/terrace · 1 parking space
89 homes · 16% of the project
2BHK+2T TYPE 1A
724 sq ft
67 m² carpet
30 m² land share · 11 m² balcony/terrace · 1 parking space
66 homes · 12% of the project
3BHK+3T TYPE 3
1,206 sq ft
112 m² carpet
55 m² land share · 31 m² balcony/terrace · 1 parking space
54 homes · 10% of the project
2BHK+2T TYPE 2A
720 sq ft
67 m² carpet
29 m² land share · 10 m² balcony/terrace · 1 parking space
27 homes · 5% of the project
3BHK+3T TYPE 4
1,203 sq ft
112 m² carpet
57 m² land share · 36 m² balcony/terrace · 1 parking space
14 homes · 3% of the project
2BHK+2T TYPE 1B
741 sq ft
69 m² carpet
31 m² land share · 11 m² balcony/terrace · 1 parking space
14 homes · 3% of the project
3BHK+3T TYPE 5
1,203 sq ft
112 m² carpet
54 m² land share · 28 m² balcony/terrace · 1 parking space
14 homes · 3% of the project
2BHK+2T TYPE 2(A)
720 sq ft
67 m² carpet
29 m² land share · 10 m² balcony/terrace · 1 parking space
13 homes · 2% of the project
2BHK+2T TYPE 2(B)
719 sq ft
67 m² carpet
29 m² land share · 10 m² balcony/terrace · 1 parking space
13 homes · 2% of the project
2BHK+2T TYPE 3
1,079 sq ft
100 m² carpet
50 m² land share · 29 m² balcony/terrace · 1 parking space
2 homes · 0% of the project
2BHK+2T TYPE 4
1,013 sq ft
94 m² carpet
47 m² land share · 29 m² balcony/terrace · 1 parking space
2 homes · 0% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 113 floors
Tower 213 floors
Tower 313 floors
Tower 413 floors
Tower 514 floors
Tower 613 floors
Tower 713 floors
Tower 813 floors
Tower 913 floors
Tower 1013 floors

Tower 1: 52 homes, 41 m tall, 2 basements · Tower 2: 66 homes, 41 m tall, 2 basements · Tower 3: 66 homes, 41 m tall, 2 basements · Tower 4: 53 homes, 41 m tall, 2 basements · Tower 5: 57 homes, 44 m tall, 2 basements · Tower 6: 53 homes, 41 m tall, 2 basements · Tower 7: 53 homes, 41 m tall, 2 basements · Tower 8: 53 homes, 41 m tall, 2 basements · Tower 9: 53 homes, 41 m tall, 2 basements · Tower 10: 52 homes, 41 m tall, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project81
Typical within 3 km (59)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project78%
Typical within 3 km (60)62%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
6.90 acres

27,923 m²

Ground covered by buildings
22% of the land

6,099 m²

Floor-area ratio
2.98

Floors built per unit of land: 2.98 m² of floors for each m² of land.

Parking
1.34 per home

644 covered, 104 open

Built-up area, all floors
13,04,445 sq ft

1,21,187 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 29 RERA projects of Godrej Properties on the map

Complaints to RERA about its other projects

64 complaints across 13 projects. The most complained about:

Show all 13 projects
  • GODREJ PARK RETREAT 2 complaints
  • Godrej Woodscapes Phase 2 2 complaints
  • GODREJ LAKESIDE ORCHARD 2 complaints
  • Godrej Splendour Phase II 2 complaints
  • Godrej Woodland Phase 2 1 complaint
  • Godrej Park Retreat Phase 2 1 complaint
  • GODREJ BUDIGERE CROSS / GODREJ BENGAL LAMPS 1 complaint
  • GODREJ TIARA 1 complaint

The company

Registered as
GODREJ PROPERTIES LIMITED
Type
Company
Company number
L74120MH1985PLC035308

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACG3995M
GSTIN
29AAACG3995M1ZX

Its other registrations on RERA Karnataka

17 registrations under this company
  • GODREJ FLORENNE PHASE III PRM/KA/RERA/1250/304/PR/121026/009010 · approved 12 Oct 2026
  • GODREJ FLORENNE PHASE II PRM/KA/RERA/1250/304/PR/150926/008943 · approved 15 Sep 2026
  • GODREJ FLORENNE PRM/KA/RERA/1250/304/PR/150926/008942 · approved 15 Sep 2026
  • Boulevard at Godrej Woodscapes PRM/KA/RERA/1251/446/PR/190826/008878 · approved 19 Aug 2026
  • Godrej Regent Park PRM/KA/RERA/1251/308/PR/150726/008810 · approved 15 Jul 2026
  • GODREJ PARKSHIRE PRM/KA/RERA/1250/304/PR/090126/008393 · approved 9 Jan 2026
  • GODREJ TIARA PRM/KA/RERA/1251/309/PR/110625/007817 · approved 11 Jun 2025
  • GODREJ LAKESIDE ORCHARD PRM/KA/RERA/1251/446/PR/300924/007105 · approved 30 Sep 2024
  • Godrej Woodscapes Phase 2 PRM/KA/RERA/1251/446/PR/170524/006888 · approved 17 May 2024
  • Godrej Woodscapes PRM/KA/RERA/1251/446/PR/170524/006882 · approved 17 May 2024
  • Godrej Park Retreat Phase 2 PRM/KA/RERA/1251/446/PR/130723/006056 · approved 13 Jul 2023
  • Godrej Splendour Phase II PRM/KA/RERA/1251/446/PR/120123/005611 · approved 12 Jan 2023
  • Godrej Woodland Phase 2 PRM/KA/RERA/1250/304/PR/020922/005201 · approved 2 Sep 2022
  • Godrej Splendour PRM/KA/RERA/1251/446/PR/160622/005000 · approved 16 Jun 2022
  • GODREJ PARK RETREAT PRM/KA/RERA/1251/446/PR/280222/004736 · approved 28 Feb 2022
  • Godrej Woodland PRM/KA/RERA/1250/304/PR/210208/003856 · approved 8 Feb 2021
  • Godrej Aqua PRM/KA/RERA/1251/309/PR/190102/002277 · approved 2 Jan 2019

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹254.0 crBuilding and development ₹654.5 crTotal ₹908.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹29.1 cr₹0.0 lakh
Q4 2025-26₹54.6 cr₹11.9 cr
Q1 2026-27₹47.5 cr₹20.7 cr
Q2 2026-27₹37.2 cr₹43.6 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station12.9 kmReliable
  • Nearest railway station4.41 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.86 kmCaveat

Hospitals

  • Nearest hospital0.64 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Median pupil-teacher ratio, schools within 1 km20.2 :1Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km7Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)1.52 kmReliable
  • Nearest sewage treatment plant3.2 kmCaveat
  • Industrial zones within 1 km7Caveat
  • Nearest airfield runway (any, incl. military)3.56 kmCaveat
  • Nearest commercial-airport runway10.99 kmReliable
  • Distance to runway approach-path proxy7.77 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (13.10783, 77.63241), 2026-10-24. Each figure's source and caveat are in the full report.