RERA project · Residential/Group Housing
Godrej Vanantara
by GODREJ IRISMARK PRIVATE LIMITED · 2,008 homes · 36.13 acres · 16 towers · Bengaluru South
Upcoming Under construction, due May 2031. 1% built with 9% of the time used. 98% of homes booked.
At a glance
Due 31 May 2031. 9% of the time from RERA approval to the deadline has passed.
1,964 of 2,008 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 71 per acre. 93% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 29 RERA projects in Bengaluru Urban: 4 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 17 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA13 May 2026
- Work started15 May 2026
- Today24 Oct 2026
9% of the time to the deadline has passed.
- Deadline31 May 2031
The date it must be complete by.
- If it slips like a typical project1 Mar 2032
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 1 × 2BHK-2Toilet, 29 × 3BHK-3Toilet, 10 × 3BHK-2Toilet, 4 × 4BHK-4Toilet+Servant Room-Servant Toilet.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower A: 122 homes, 95 m tall, 3 basements · Tower B: 122 homes, 95 m tall, 3 basements · Tower C: 122 homes, 95 m tall, 3 basements · Tower D: 122 homes, 95 m tall, 3 basements · Tower E: 122 homes, 95 m tall, 3 basements · Tower F: 122 homes, 95 m tall, 3 basements · Tower G: 122 homes, 95 m tall, 3 basements · Tower H: 122 homes, 95 m tall, 3 basements · Tower J: 122 homes, 95 m tall, 3 basements · Tower K: 130 homes, 101 m tall, 3 basements · Tower L: 130 homes, 101 m tall, 3 basements · Tower M: 130 homes, 101 m tall, 3 basements · Tower N: 130 homes, 101 m tall, 3 basements · Tower P: 130 homes, 101 m tall, 3 basements · Tower Q: 130 homes, 101 m tall, 3 basements · Tower R: 130 homes, 101 m tall, 3 basements
Amenities
- Electricity
- CCTV Surveillance
- Club House 9,532 m²
- Community Hall 244 m²
- Outdoor Sports facility 5,255 m²
- Indoor Sports facility 697 m²
- Swimming Pool 350 m²
- Gym 438 m²
- Parks 14,620 m²
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 36.13 acres
- Ground covered by buildings
- 7% of the land
- Floor-area ratio
- 2.00
- Parking
- 1.17 per home
- Built-up area, all floors
- 35,20,161 sq ft
1,46,229 m²
9,989 m²
Floors built per unit of land: 2.00 m² of floors for each m² of land.
2,153 covered, 201 open
3,27,034 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 29 RERA projects of Godrej Properties on the map
The company
- Registered as
- GODREJ IRISMARK PRIVATE LIMITED
- Type
- Company
- Company number
- U68100MH2026PTC468577
- PAN
- AAMCG8139M
- GSTIN
- 29AAMCG8139M1ZR
CIN or LLPIN, from the Registrar of Companies.
The land is owned together with others (a joint development), including Godrej Irismark Pvt Ltd ( Formarly known as Godrej Irismark LLP).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/310/PR/130526/008653 · Approved
- Building plan approvedBDA - Bangalore Development Authority · BDA/NA.MA/A.S/A.A-3/T.A-2/S/04/2026-27 · 2 May 2026
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceOthers
Complaints to RERA about this project
None on RERA Karnataka.
Documents
224 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q1 2026-27 | ₹300.4 cr | ₹0.0 lakh |
| Q2 2026-27 | ₹293.6 cr | ₹54.8 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station6.55 kmReliable
- Nearest railway station12.12 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)0.88 kmCaveat
Hospitals
- Nearest hospital2.12 kmCaveat
Schools
- Schools in pincode 560083 (UDISE+ census)111Caveat
- Median pupil-teacher ratio, schools within 1 km22.3 :1Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionHulimavu PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km3Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)1.93 kmReliable
- Nearest sewage treatment plant1.97 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)13.49 kmCaveat
- Nearest commercial-airport runway40.03 kmReliable
- Distance to runway approach-path proxy37.48 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.83796, 77.60220), 2026-10-24. Each figure's source and caveat are in the full report.