Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

GODREJ LAKESIDE ORCHARD

by Godrej Properties Limited · 698 homes · 12.07 acres · 8 towers · Bengaluru East

Upcoming Under construction, due Sep 2030. 35% built with 34% of the time used. 90% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
35% built

Due 30 Sep 2030. 34% of the time from RERA approval to the deadline has passed.

Built35%
Time used34%
How much is sold?101 left
90% booked

869 of 970 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
58 homes per acre

Similar projects within 3 km: 70 per acre. 68% of the land is left open.

Any complaints?See the list
2 complaints

Complaints to RERA about this project. 63 more about the builder's other projects.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?12 due so far
33% on time

Of its 29 RERA projects in Bengaluru Urban: 4 delivered on time, 5 late (after the date first promised), 3 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA30 Sep 2024
  2. Work started1 Nov 2024
  3. Today24 Oct 2026

    34% of the time to the deadline has passed.

  4. If it slips like a typical project2 Jul 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2621%
Q4 2025-2624%
Q1 2026-2727%
Q2 2026-2735%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower A47%
Tower B45%
Tower C27%
Tower D26%
Tower E24%
Tower F32%
Tower G31%
Tower H28%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

869 booked101 leftQ2 2026-27

Still available: 3 × 2BHK+3T+STUDY, 3 × 3BHK+4T+MAID, 13 × 3BHK+4T+STUDY, 6 × 2BHK+2T, 1 × 3BHK+2T, 75 × 3BHK+3T.

Booked, by type

1R+1T71 of 71
2BHK+3T+STUDY0 of 3
3BHK+4T+MAID47 of 50
3BHK+4T+STUDY157 of 170
2BHK+2T151 of 157
3BHK+2T139 of 140
3BHK+3T254 of 329
2BHK26 of 26
1RK+1T24 of 24

Booked, each quarter

Q3 2025-26678 of 970
Q4 2025-26678 of 970
Q1 2026-27837 of 970
Q2 2026-27869 of 970

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK+3T
1,153 sq ft
107 m² carpet · sizes 1,074–1,364 sq ft (46 at this size)
44 m² land share · 16 m² balcony/terrace · 1 parking space
329 homes · 34% of the project
3BHK+4T+STUDY
1,343 sq ft
125 m² carpet · sizes 226–1,396 sq ft (46 at this size)
50 m² land share · 16 m² balcony/terrace · 1 parking space
170 homes · 18% of the project
2BHK+2T
736 sq ft
68 m² carpet · sizes 736–1,141 sq ft (25 at this size)
29 m² land share · 11 m² balcony/terrace · 1 parking space
157 homes · 16% of the project
3BHK+2T
964 sq ft
90 m² carpet · sizes 926–976 sq ft (69 at this size)
36 m² land share · 12 m² balcony/terrace · 1 parking space
140 homes · 14% of the project
1R+1T
272 sq ft
25 m² carpet · sizes 226–273 sq ft (24 at this size)
10 m² land share · 5 m² balcony/terrace · 1 parking space
71 homes · 7% of the project
3BHK+4T+MAID
1,432 sq ft
133 m² carpet · sizes 238–1,432 sq ft (24 at this size)
53 m² land share · 19 m² balcony/terrace · 1 parking space
50 homes · 5% of the project
2BHK
763 sq ft
71 m² carpet · sizes 763–1,066 sq ft (25 at this size)
28 m² land share · 12 m² balcony/terrace · 1 parking space
26 homes · 3% of the project
1RK+1T
238 sq ft
22 m² carpet · sizes 236–1,429 sq ft (22 at this size)
8 m² land share · 19 m² balcony/terrace · 1 parking space
24 homes · 2% of the project
2BHK+3T+STUDY
1,116 sq ft
104 m² carpet · sizes 1,102–1,116 sq ft (2 at this size)
41 m² land share · 16 m² balcony/terrace · 1 parking space
3 homes · 0% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower A25 floors
Tower B25 floors
Tower C25 floors
Tower D25 floors
Tower E25 floors
Tower F25 floors
Tower G25 floors
Tower H25 floors

Tower A: 123 homes, 1 basement · Tower B: 99 homes, 1 basement · Tower C: 95 homes, 2 basements · Tower D: 95 homes, 2 basements · Tower E: 188 homes, 2 basements · Tower F: 98 homes, 1 basement · Tower G: 150 homes, 1 basement · Tower H: 122 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project58
Typical within 3 km (95)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project68%
Typical within 3 km (95)68%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
12.07 acres

48,829 m²

Ground covered by buildings
32% of the land

15,508 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.33 per home

850 covered, 78 open

Built-up area, all floors
14,83,029 sq ft

1,37,778 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 29 RERA projects of Godrej Properties on the map

Complaints to RERA about its other projects

63 complaints across 13 projects. The most complained about:

Show all 13 projects
  • GODREJ PARK RETREAT 2 complaints
  • Godrej Woodscapes Phase 2 2 complaints
  • Godrej Splendour Phase II 2 complaints
  • Godrej Woodland Phase 2 1 complaint
  • Godrej Park Retreat Phase 2 1 complaint
  • GODREJ BUDIGERE CROSS / GODREJ BENGAL LAMPS 1 complaint
  • GODREJ TIARA 1 complaint
  • GODREJ WOODS 1 complaint

The company

Registered as
Godrej Properties Limited
Type
Company
Company number
L74120MH1985PLC035308

CIN or LLPIN, from the Registrar of Companies.

PAN
AAACG3995M
GSTIN
29AAACG3995M1ZX
Website
https://www.godrejproperties.com

Its other registrations on RERA Karnataka

17 registrations under this company
  • GODREJ FLORENNE PHASE III PRM/KA/RERA/1250/304/PR/121026/009010 · approved 12 Oct 2026
  • GODREJ FLORENNE PHASE II PRM/KA/RERA/1250/304/PR/150926/008943 · approved 15 Sep 2026
  • GODREJ FLORENNE PRM/KA/RERA/1250/304/PR/150926/008942 · approved 15 Sep 2026
  • Boulevard at Godrej Woodscapes PRM/KA/RERA/1251/446/PR/190826/008878 · approved 19 Aug 2026
  • Godrej Regent Park PRM/KA/RERA/1251/308/PR/150726/008810 · approved 15 Jul 2026
  • GODREJ PARKSHIRE PRM/KA/RERA/1250/304/PR/090126/008393 · approved 9 Jan 2026
  • GODREJ WOODS PRM/KA/RERA/1251/472/PR/121125/008248 · approved 12 Nov 2025
  • GODREJ TIARA PRM/KA/RERA/1251/309/PR/110625/007817 · approved 11 Jun 2025
  • Godrej Woodscapes Phase 2 PRM/KA/RERA/1251/446/PR/170524/006888 · approved 17 May 2024
  • Godrej Woodscapes PRM/KA/RERA/1251/446/PR/170524/006882 · approved 17 May 2024
  • Godrej Park Retreat Phase 2 PRM/KA/RERA/1251/446/PR/130723/006056 · approved 13 Jul 2023
  • Godrej Splendour Phase II PRM/KA/RERA/1251/446/PR/120123/005611 · approved 12 Jan 2023
  • Godrej Woodland Phase 2 PRM/KA/RERA/1250/304/PR/020922/005201 · approved 2 Sep 2022
  • Godrej Splendour PRM/KA/RERA/1251/446/PR/160622/005000 · approved 16 Jun 2022
  • GODREJ PARK RETREAT PRM/KA/RERA/1251/446/PR/280222/004736 · approved 28 Feb 2022
  • Godrej Woodland PRM/KA/RERA/1250/304/PR/210208/003856 · approved 8 Feb 2021
  • Godrej Aqua PRM/KA/RERA/1251/309/PR/190102/002277 · approved 2 Jan 2019

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹109.8 crBuilding and development ₹764.7 crTotal ₹874.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹39.7 cr₹24.2 cr
Q4 2025-26₹178.8 cr₹36.7 cr
Q1 2026-27₹40.1 cr₹26.7 cr
Q2 2026-27₹99.6 cr₹67.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station5.86 kmReliable
  • Nearest railway station1.98 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)0.4 kmCaveat

Hospitals

  • Nearest hospital1.41 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionBellanduru PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)6.23 kmReliable
  • Nearest sewage treatment plant3.3 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)7.24 kmCaveat
  • Nearest commercial-airport runway33.17 kmReliable
  • Distance to runway approach-path proxy32.67 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (12.88946, 77.70580), 2026-10-24. Each figure's source and caveat are in the full report.