GM AMBITIOUS ENCLAVE
by M/s. Allam Infinite India Private Limited · 2,359 homes · 10.35 acres · 6 towers · Anekal
Past due, no completion filed Past its deadline of 30 Jul 2025, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.
At a glance
The deadline was 30 Jul 2025, and no completion is filed.
The builder has not filed bookings on RERA.
Similar projects across the city: 76 per acre. 43% of the land is left open.
Complaints to RERA about this project. 23 more about the builder's other projects.
The RERA page doesn't say.
Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 2 past due with no completion filed.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started4 Apr 2018
- Approved by RERA6 Apr 2018
- First promised31 Oct 2023
The date the builder gave at registration.
- Deadline (extended)30 Jul 2025
Passed with no completion filed.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
A1: 501 homes, 3 basements · A2: 494 homes, 3 basements · A3: 500 homes, 3 basements · B1: 298 homes, 3 basements · B2: 298 homes, 3 basements · C: 268 homes, 3 basements
Amenities
- Electricity
- Community Hall
- Outdoor Sports facility
- Indoor Sports facility
- Swimming Pool
- Gym
- Parks
- Power Backup
- Water and Sanitation
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 10.35 acres
- Ground covered by buildings
- 28% of the land
41,889 m²
11,898 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of M/s. Allam Infinite India Private Limited on the map
Complaints to RERA about its other projects
- GM NORTH ENCLAVE 23 complaints
The company
- Registered as
- M/s. Allam Infinite India Private Limited
- Type
- Company
- Company number
- U70101KA2016PTC095043
- PAN
- AAPCA4021P
CIN or LLPIN, from the Registrar of Companies.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/180406/001467 · Approved
- Building plan approvedKIADB - Karnataka Industrial Areas Development Board
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
- Fraudulent Cancellation of Booking and Misappropriation of Amount Paid 11 Feb 2019 · Disposed Ao
- IIFL bank has given more money as a pre emi 28 Feb 2019 · Disposed Ao
- Refund was promised when cancelling flat 30 Apr 2019 · Disposed Ao
- Refund of Booking Amount of Rs 25000 7 Jun 2019 · Disposed Ao
- Request for cancellation of booked flat and refund is not accepted by the builder 7 Jun 2019 · Disposed Ao
- Request for Return of Payment against the Property 13 Jul 2019 · Disposed Ao
- Refund of money paid on cancellation of Flat Booking 21 Jul 2019 · Disposed Ao
- Booked flat is sold to others 24 Jul 2019 · Disposed Ao
- Refund of the Amount Paid 30 Jul 2019 · Disposed Ao
- Request for Return of Payment against the property 24 Aug 2019 · Disposed Ao
- Booking amount refund 30 Aug 2019 · Disposed Ao
- Refund request -Ref: Complaint NO: CMP/190607/0003253, Promoter failed to respond to honorable RERA Judgement . 1 Dec 2019 · Disposed Ao
- Not Refunding the Flat Booking Amount and Down Payment of Rs. 280000 19 Dec 2019 · Disposed Authority Bench4
- Demanding for payment before completion of construction 23 Feb 2020 · Disposed Authority Bench4
- Refund of Part Sale consideration amount 15 Mar 2020 · Disposed Ao
- To refund Part Sale consideration 15 Mar 2020 · Disposed Ao
- False Commitment on selling the Flat 19 Jan 2021 · Disposed Authority Bench4
- Refund of the booking amount against cancellation 26 Jan 2021 · Disposed Authority Bench4
- Cancellation notice given to builder but no refund for almost 2 years now 13 Jan 2022 · Disposed Authority Bench4
- Noncompliance with the Signed Legal Agreement 23 Feb 2022 · Disposed Authority Bench5
- Refund not processed by builder even after 60 days as per construction agreement clause 5.3 14 Mar 2022 · Disposed Authority Bench5
- Termination of Agreement of sale owing to delay and refusal to refund money by Developer 20 Jul 2022 · Disposed Authority Bench5
- REFUND OF BOOKING AMOUNT 4 Jan 2023 · Disposed Authority Bench5
- Requesting GM to support me with compensation + rent till the time of possession. PLEASE!! 17 Jan 2023 · Disposed Authority Bench5
- Possession date was expired, new date was given after 1 year 2 Mar 2023 · Disposed Authority Bench5
- Booking amount not refunded after cancellation 4 Mar 2023 · Disposed Authority Bench5
- Refund of Booking Amount 16 Mar 2023 · Disposed Authority Bench5
- I have paid more the 5 lakh as interest for loan sanctioned in IIFL 10 Apr 2023 · Disposed Authority Bench5
- Project Incomplete - No indication of completion in the near future - Refund refused 10 Apr 2023 · Disposed Authority Bench5
- Possession date is not yet confirmed, Refund required 28 Apr 2023 · Disposed Authority Bench5
- Refund of Booking amount 1 Jun 2023 · Disposed Authority Bench5
- Delivery Date Expiry & Breach of Agreement 9 Jun 2023 · Disposed Authority Bench5
- Refund of booking Amount 18 Jul 2023 · Disposed Authority Bench5
- Delay in handover of Possession of Residential Flat, failed to Execute Sale Deed 17 Aug 2023 · Disposed Authority Bench5
- Refund of booking amount 1 Sep 2023 · Disposed Authority Bench5
- Delay in delivery of the project 25 Sep 2023 · Disposed Authority Bench5
- Delay in possession of alloted flats 21 Oct 2023 · Disposed Authority Bench5
- Seeking compensation on the loss made due to delay in handover of flat. 21 Oct 2023 · Disposed Authority Bench5
- Refund of Agreement of Sale and Construction Agreement Amount 23 Nov 2023 · Disposed Authority Bench5
- Delivery of the project delayed 14 Dec 2023 · Disposed Authority Bench5
- Due to delay in possession I have to face many financial hardships by paying both Loan EMIs and House rents. So I pray to seek a complete Refund along with the Interest paid over the time till date 1 Jan 2024 · Disposed Authority Bench5
- Delay interest and Compensation 20 Jan 2024 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF FLAT IS HANDED OVER AS MONTHLY PAYMENTS 29 Jan 2024 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 31 Jan 2024 · Disposed Authority Bench5
- Seeking interest on delay period from the Builder till possession of Flat is handed over 1 Feb 2024 · Disposed Authority Bench5
- Delay in Possession of the Property 5 Feb 2024 · Disposed Authority Bench5
- seeking interest on delay period from promoter till Possession of flat is Handed over as Monthly Payments 5 Feb 2024 · Disposed Authority Bench5
- Interest on delay period due to Delay in Project Delivery 13 Feb 2024 · Disposed Authority Bench5
- Refund of token amount 16 Feb 2024 · Disposed Authority Bench5
- Project has been delayed & not received any compensation 20 Feb 2024 · Disposed Authority Bench5
- Delay in handovering the flat as per the committed date by the builder 19 Mar 2024 · Disposed Authority Bench5
- Refund of amount Paid towards purchase of flat 21 Mar 2024 · Disposed Authority Bench5
- Interest on delay period 18 Apr 2024 · Disposed Authority Bench5
- Property not completed 24 May 2024 · Disposed Authority Bench5
- Project Delayed 4 Jun 2024 · Disposed Authority Bench5
- Refund of full paid amount for the flat purchase with interest and compensation 6 Jun 2024 · Disposed Authority Bench5
- Booking refund not provided 7 Jun 2024 · Disposed Authority Bench5
- Cheating/Misleading information delivered and deposit amount Rs 75,000/- not refunding 11 Jun 2024 · Disposed Authority Bench5
- Deficiency of service caused by inordinate delay & Rent amount and Mental Agony compensation claim 20 Jun 2024 · Disposed Ao
- Delay in Possession of Flat at GM Ambitious Enclave 3 Jul 2024 · Disposed Authority Bench5
- Delay in Project - Paying EMI's and RENT - No proper commitment 16 Aug 2024 · Disposed Authority Bench5
- Refund and Compensation of Delayed possession 16 Aug 2024 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER/DEVELOPER TILL POSSESSION OF ALLOTTED APARTMENT 21 Aug 2024 · Disposed Authority Bench5
- Construction delayed, no firm handover date. 21 Aug 2024 · Posted For Orders Authority Fullbench
- refund amount and Other as per the Act. 2 Sep 2024 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Sep 2024 · Disposed Authority Bench5
- Project has been delayed 17 Sep 2024 · Disposed Authority Bench5
- interest on delay period 17 Sep 2024 · Disposed Authority Bench5
- Due to delay in possession I have to face many financial hardships by paying both Loan EMIs and House rents. So I pray to seek a complete Refund along with the Interest paid over the time till date 3 Oct 2024 · Disposed Authority Bench5
- Re: Delay in Completion and delivery of possession 5 Oct 2024 · Disposed Authority Bench5
- Refund of Amount paid due to stalled project and rera time limit over 9 Oct 2024 · Disposed Authority Bench5
- Refund of full paid amount for the flat purchase with interest and compensation 16 Oct 2024 · Disposed Authority Bench5
- Delay in Possession, Delay interest, Pre-EMI refund and incorrect demand note raised 19 Oct 2024 · Disposed Authority Bench5
- Complaint Against Builder for Delay in Possession 5 Nov 2024 · Disposed Authority Bench5
- Cancellation of Flat number A3-07-30 due to non completion of project as per RERA norms 6 Nov 2024 · Disposed Authority Bench5
- Project Delivery date lapsed 12 Nov 2024 · Disposed Authority Bench5
- For specific performance of agreement of sale dated 09/07/2019 and Compensation of Rs. 2,51,464/- along with interest at 18% p.a from date of filing till date of payment. 25 Nov 2024 · Disposed Authority Bench5
- Refund & Compensation for my Flat - B-10-12 (GM Ambitious enclave) 28 Nov 2024 · Disposed Authority Bench5
- The Project is stalled and RERA is expired. My prayer is for the interest on 'delay period'. 17 Dec 2024 · Disposed Authority Bench5
- Delayed period interest and possession of schedule property 19 Dec 2024 · Disposed Authority Bench5
- Delayed Period Interest and Possession of Schedule Property 19 Dec 2024 · Disposed Authority Bench5
- Delayed Period Interest and Possession of Schedule Property 19 Dec 2024 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POCESSION OF ALLOTMENT OF FLAT 20 Dec 2024 · Disposed Authority Bench5
- Delay in handing over of possession 21 Dec 2024 · Disposed Authority Bench5
- Delay in handing over of possession 21 Dec 2024 · Disposed Authority Bench5
- Formal Complaint Regarding Interest on Delay Period due to Delay in Possession of Residential Project 'GM Ambitious (RERA NO: PRM/KA/RERA/1251/308/PR/180406/001467) 24 Dec 2024 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 24 Dec 2024 · Disposed Authority Bench5
- REQUEST TO REFUND THE AMOUNT PAID ALONG WITH INTEREST FOR THE DELAYED/STALLED PROJECT. (FLAT NO- A3-08-09) 24 Dec 2024 · Disposed Authority Bench5
- Refund request due to project uncertainty and severe delays 26 Dec 2024 · Disposed Authority Bench5
- Complaint for delayed possession and Compensation 26 Dec 2024 · Disposed Authority Bench5
- To pay delay interest under Section 18 (1) Proviso of RERA Act 26 Dec 2024 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 31 Dec 2024 · Disposed Authority Bench5
- Delayed interest-Relief to seek- direction from the authority-on completion of project-Sale deed to be executed in my favour 31 Dec 2024 · Disposed Authority Bench5
- Seeking for compensation on delay of completion of flat 1 Jan 2025 · Disposed Authority Bench5
- periodDelayed interest - Relief to seek - Direction from the Authority - On completion ofProject - Sale deed to be executed in my favour 1 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in our favour 1 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief seeking - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 1 Jan 2025 · Disposed Authority Bench5
- "Delay Interest" - Relief to Seek - Direction from the Authority - On Completion of project the sale deed to be executed in my favour 1 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour. 3 Jan 2025 · Disposed Authority Bench5
- Seeking interest on delay period from promoter till possession of allotted apartment is completed as monthly payment 4 Jan 2025 · Disposed Authority Bench5
- Interest on Delay Period 4 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 4 Jan 2025 · Disposed Authority Bench5
- "Delay Interest" - relief to seek - direction from the authority - On completion of project the sale deed to be executed in our favor 4 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 4 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 4 Jan 2025 · Disposed Authority Bench5
- "Delay Interest" - relief to seek - direction from the authority - On completion of project the sale deed to be executed in our favor" 6 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completionof Project - Sale deed to be executed in my favour 6 Jan 2025 · Disposed Authority Bench5
- "Delay Interest" - relief to seek - direction from the authority - On completion of project the sale deed to be executed in our favor" 6 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favor 7 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delay & Compensation 7 Jan 2025 · Posted For Orders Authority Bench5
- Delayed Interest - Relief to Seek-Direction from the Authority-On Completion of Project-Sale Deed to be executed in my and my wife favor 7 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Jan 2025 · Disposed Authority Bench5
- Delay Interest and Get Flat the time on Handover 8 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 Jan 2025 · Disposed Authority Bench5
- Relief Sought for Delayed Interest – Direction from the Authority for Execution of Sale Deed in My Favour Upon Project Completion 8 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek Direction from the Authority for timely completion of Project and Sale deed to be executed in my favour 8 Jan 2025 · Disposed Authority Bench5
- Seeking Completion of Project and Interest on Delayed period 8 Jan 2025 · Disposed Authority Bench5
- Relief to seek delayed interest - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 Jan 2025 · Disposed Authority Bench5
- Delayed Interest - relief to seek - direction from the authority - On completion of project the sale deed to be executed in my favor 8 Jan 2025 · Posted For Orders Authority Bench5
- Delay Compensation 8 Jan 2025 · Disposed Authority Bench5
- Need Full refund with interest paid to bank Delay in Handover 9 Jan 2025 · Posted For Orders Authority Bench5
- Relief sought for delayed interest - Direction from authority for execution of sale deed in my favour. 9 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 9 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 9 Jan 2025 · Disposed Authority Bench5
- Seeking interest on delay period from promoter , till the possession of the allotted apartment is completed as monthly basis 10 Jan 2025 · Disposed Authority Bench5
- Delayed Interest - relief to seek - direction from the authority - on completion of project- sale deed to be executed in my favour 10 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour (Varsha A Joshi) 10 Jan 2025 · Disposed Authority Bench5
- DEALYED INTEEST- RELIEF TO SEEK -DIRECTION FROM AUTHORITY-ON COMPLETION OF PROJECT-SALE DEED TO BE EXECUTED IN MY FAVOUR 10 Jan 2025 · Disposed Authority Bench5
- Seeking project completion and interest on delayed period 10 Jan 2025 · Disposed Authority Bench5
- Relief sought for payment of Delayed interest -Direction from the Authority - completion of Project, on completion of Project - Sale deed to be executed in my favour, and hand over as per Agreement 10 Jan 2025 · Disposed Authority Bench5
- Direction from Authority - Completion of Project - Interest on Delay 10 Jan 2025 · Disposed Authority Bench5
- DELAYED PROJECT COMPLETION 15 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 16 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 16 Jan 2025 · Disposed Authority Bench5
- Seeking Project Completion and Delay Interest 16 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 16 Jan 2025 · Posted For Orders Authority Bench5
- Relief Sought for Delayed Interest Direction from the Authority for Execution of Sale Deed in My Favour Upon Project Completion 16 Jan 2025 · Disposed Authority Bench5
- "Delay Interest"- relief to seek- direction from the authority- On completion of project the sale deed to be executed in our favour 17 Jan 2025 · Disposed Authority Bench5
- Relief to seek delayed interest - Direction from the Authority - On completion of Project - Sale deed to be executed in our favour. 17 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in Complainants favour 17 Jan 2025 · Posted For Orders Authority Bench5
- "Delay Interest" -relief to seek-direction from the authority on completion of the project the sales deed to be executed in my (Complainant) favour 17 Jan 2025 · Posted For Orders Authority Bench5
- Delay Interest- Relief to seek- Direction from the Authority- On completion of the project the sale deed to be executed in my (Compliants) favour 17 Jan 2025 · Disposed Authority Bench5
- "Delay Interest" - relief to seek - direction from the authority - On completion of the project the sale deed to be executed in my favor 17 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Jan 2025 · Disposed Authority Bench5
- Compensation for the delay in delivery of the flat; Litigation expenses; completion of the project, obtain occupancy certificate and handover the property 17 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest payment , Relief to seek directions from the RERA authority for completion of project , occupancy certificate , sale deed to be executed in my favour 17 Jan 2025 · Disposed Authority Bench5
- Relief sought for Delayed Interest - Direction from the Authority for Execution of Sale Deed in My name 17 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Jan 2025 · Disposed Authority Bench5
- Relief sought for Delayed Interest - Direction from the Authority for Execution of Sale Deed in My name 18 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 18 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek- Direction from the Authority -On completion of Project - Saledeed to be executed in my favour 20 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 20 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 20 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 20 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 20 Jan 2025 · Posted For Orders Authority Bench5
- Delay in construction and handover 21 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 21 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 21 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 21 Jan 2025 · Disposed Authority Bench5
- Seeking to recover interest on the delay in the possession of the allotted apartment from the promoter. 21 Jan 2025 · Disposed Authority Bench5
- Request for Interest on Delay Period in project completion 22 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 22 Jan 2025 · Posted For Orders Authority Bench5
- Delayed Interest Compensation & completion of Project 23 Jan 2025 · Under Enquiry Authority Bench5
- Interest or Refund with Interest & Penalty for Delay in GM AMBITIOUS Project beyond the Project Deadlines 23 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 23 Jan 2025 · Disposed Authority Bench5
- Seeking early completion of the project,interest on delayed period for delivery of the schedule property.Seeking relief from RERA for completion of the project & issue of occupancy certificate 23 Jan 2025 · Posted For Orders Authority Bench5
- Delayed Interest - Relief to seek -Direction from the Authority - On Completion of project - Sale deed to be executed in my favour 23 Jan 2025 · Disposed Authority Bench5
- Complaint under Section 18(1) of the Real Estate (Regulation and Development) Act, 2016 for Delayed Possession of Flat in GM Ambitious Enclave Project by GM Infinite Dwelling (India) Pvt. Ltd. 23 Jan 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 23 Jan 2025 · Disposed Authority Bench5
- "Delay Interest"-relief to seek - direction from the authority- on completion of project the sale deed to be executed in our favor 28 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 28 Jan 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY 29 Jan 2025 · Posted For Orders Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF THE ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 29 Jan 2025 · Disposed Authority Bench5
- Seeking Interest from the promoter for the delayed period ,till the completed apartment is delivered for possession 29 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority on completion of Project - Sale deed to be executed in my favour 29 Jan 2025 · Posted For Orders Authority Bench5
- Delayed Interest - Relief to seek - Direction From Authiority - On completion of Project - Sale Deed to be executed in my favor 29 Jan 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 29 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 29 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project Sale deed to be executed in my favour 29 Jan 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 29 Jan 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 30 Jan 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 3 Feb 2025 · Disposed Authority Bench5
- Seeking delay interest and to complete the Project, obtain Occupancy Certificate and handover the possession of the Schedule Property at the earliest to the Complainants. 3 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 4 Feb 2025 · Disposed Authority Bench5
- Delayed interest relief to seek, direction from the Authority, On completion of Project and sale deed to be executed in our favour 4 Feb 2025 · Disposed Authority Bench5
- Delay Interest, Execution of Sale Deed in Favour of the Complainant with Possession of Schedule Property, and Direction from the Authority on Relief 5 Feb 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 5 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Feb 2025 · Disposed Authority Bench5
- Seeking interest on delay period from the promotor till possession of allotted apartment is completed as monthly payments 10 Feb 2025 · Disposed Authority Bench5
- "Delay Interest" - relief to seek - Direction from the authority - the sale deed to be executed in complainants favour 10 Feb 2025 · Disposed Authority Bench5
- The Complainants declares that the subject matter of the claim falls within the jurisdiction of the Regulatory Authority. 10 Feb 2025 · Disposed Authority Bench5
- Delayed interest - relief to seek - direction from the authority - on completion of project - Sale deed to be executed in my favor 10 Feb 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project Sale deed to be executed in my favour 10 Feb 2025 · Disposed Authority Bench5
- Delayed Interest - Relief to Seek- Direction from the Authority - On Completion of Project - Sale deed to be executed in my favor 10 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Feb 2025 · Disposed Authority Bench5
- Seeking delay compensation to me as monthly payments till the delivery of possession is completed 12 Feb 2025 · Disposed Authority Bench5
- Delayed interest-Relief to seek-Direction from the Authority-On completion of Project-Sale deed to be executed in my favour 12 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 12 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 13 Feb 2025 · Disposed Authority Bench5
- Seeking Interest on Delay period from Promoter till possession of allotted apartment is completed as monthly payments. 17 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Feb 2025 · Disposed Authority Bench5
- Delayed interest- Relief to seek - Direction from Authority- On completion of project- Sale deed to be executed in my favour 17 Feb 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Feb 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 17 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 18 Feb 2025 · Disposed Authority Bench5
- Delayed interest - relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executedin my favour 18 Feb 2025 · Disposed Authority Bench5
- Deficiency of service caused by inordinate delay & Loan EMI amount compensation claim 19 Feb 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 20 Feb 2025 · Disposed Authority Bench5
- Delayed Interest - Compensation - Relief to seek - Direction from the Authority on Completion of Project - Sale Deed to be executed in my Favor 20 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 20 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 27 Feb 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 3 Mar 2025 · Disposed Authority Bench5
- Delay in Delivery and Interest compensation 3 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 3 Mar 2025 · Disposed Authority Bench5
- Seeking interest on delay period from promoter till possession of allotted apartment is completed as monthly payments 3 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 3 Mar 2025 · Disposed Authority Bench5
- Delayed interest - On completion of Project - Sale deed to be executed in my favour 3 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 3 Mar 2025 · Disposed Authority Bench5
- Seeking Completion of Project and Interest on Delayed period 4 Mar 2025 · Disposed Authority Bench5
- Seeking interest for the delay period from the promoter until possession of the allotted apartment is completed, to be paid as monthly instalments. 4 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 5 Mar 2025 · Disposed Authority Bench5
- Delayed interest- Relief to seek- Direction from Authority- On completion of project - sale deed to be executed in complainants favour. 5 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 6 Mar 2025 · Disposed Authority Bench5
- Relief Sought for Delayed interest – Direction from the Authority on completion of project and Sale deed to be executed in our favour. 6 Mar 2025 · Disposed Authority Bench5
- Interest on Delay Period 7 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Mar 2025 · Disposed Authority Bench5
- Delayed Interest-Relief to seek-Direction from the Authority-On completion of Project-Sales deed to be executed in my favour 7 Mar 2025 · Disposed Authority Bench5
- Complaint against M/s. Allam Infinite India Private Limited for Delayed Possession of Property GM Ambitious Enclave as per RERA provisions 8 Mar 2025 · Disposed Authority Bench5
- Delayed interest - relief to seek - direction from authority - on completion of project - sale deed to be executed in my favour 8 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed Interest-Relief to seek-Direction from the Authority-On completion ofProject-Sales deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour. 10 Mar 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESION OF ALLOTED APARTMENT AS MONTHLY PAYMENTS 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest- Relief to seek - Direction from Authority- On completion of project- Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest-Relief to seek-Direction from the Authority-On completion of Project-Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 10 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Requesting Delay Compensation via Monthly Payments until the possession is delivered - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - on completion of project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Allam GM Infinite Real Estate Company has delayed the completion of the project GM Ambitious Enclave by 4 years and is not giving the correct amount of the Refund & the Compensation amount 11 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Mar 2025 · Disposed Authority Bench5
- Seeking Of Interest Of Delay Period From Promoter Till Possession Of Allotted Apartments Is Completed As Monthly Payment 11 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 12 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 13 Mar 2025 · Disposed Authority Bench5
- Delayed Interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 13 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 13 Mar 2025 · Disposed Authority Bench5
- Delayed interest - on completion of the project - sale deed to be executed in my favour. 13 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 14 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Mar 2025 · Disposed Authority Bench5
- Delayed interest-Relief to seek Direction from the Authority-On completion of Project-Sale deed to be executed in my favour 17 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Mar 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favor 17 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 18 Mar 2025 · Disposed Authority Bench5
- Interest on delay period 18 Mar 2025 · Disposed Authority Bench5
- Delayed interest- Relief to seek-Direction from the authority -on completion of project- Sale deed to be executed in my favour 18 Mar 2025 · Disposed Authority Bench5
- Delayed Interest - Relief to seef - Direction from the Authority - On completion of project Sale Deed to be executed in my favor. 19 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 19 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favor 19 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favor 19 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 25 Mar 2025 · Disposed Authority Bench5
- Direction from Authority - Completion of Project - Interest on the delay 27 Mar 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 29 Mar 2025 · Disposed Authority Bench5
- Delayed interest- Relief to seek-Direction from the authority -on completion of project- Sale deed to be executed in my favour 2 Apr 2025 · Under Enquiry Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Apr 2025 · Disposed Authority Bench5
- SEEKING REFUND OF DEPOSITED AMOUNT WITH INTEREST AGAINST FLAT CANCELLATION 2 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Apr 2025 · Disposed Authority Bench5
- Seeking intrest on delay period from promoter till possession of allotted apartment is completed as monthly payments 2 Apr 2025 · Disposed Authority Bench5
- Complete the project in all aspects as agreed in the Agreement of Sale and construction agreement and Brochures along with OC and Delay period interest 2 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in our favour 2 Apr 2025 · Disposed Authority Bench5
- seeking interest on delay period from promoter till Possession of flat is Handed over as Monthly Payments 2 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 2 Apr 2025 · Disposed Authority Bench5
- Interest on Delay period 3 Apr 2025 · Disposed Authority Bench5
- Interest on Delay period 3 Apr 2025 · Disposed Authority Bench5
- Cancellation of Flat A2 04 35 4 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 7 Apr 2025 · Disposed Authority Bench5
- Delayed Interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 16 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favor 17 Apr 2025 · Under Enquiry Authority Bench5
- Delayed Interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in our favour 21 Apr 2025 · Disposed Authority Bench5
- seeking interest on delay period from promoter till possession alloted apartment is completed as monthly payments 22 Apr 2025 · Disposed Authority Bench5
- Refund request due to unacceptable delay 23 Apr 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 28 Apr 2025 · Disposed Authority Bench5
- Project is delayed, I need my flat allocation soon and compensation for delay 28 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 29 Apr 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 1 May 2025 · Disposed Authority Bench5
- Seeking completion of project & interest on delayed period 5 May 2025 · Disposed Authority Bench5
- Seeking Interest on Delay Peroiod from promoter till possession of allotted apartment is completed as monthly payments. 5 May 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 6 May 2025 · Posted For Orders Authority Bench5
- Seeking the interest on the delay period from the promotor till the possession of allotted apartment is completed as monthly payment 6 May 2025 · Disposed Authority Bench5
- Complaint regarding delay in completion of project 8 May 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 May 2025 · Disposed Authority Bench5
- COMPLETE REFUND ALONG WITH INTEREST 12 May 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favor 21 May 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 22 May 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 27 May 2025 · Disposed Authority Bench5
- Complainant is seeking interest for the Delay Period u/s 18 (1) of the RERA Act, 2016, on the basis that the Respondent has failed to handover possession of the Apartment in her favour 29 May 2025 · Disposed Authority Bench5
- "Delay Interest" -relief to seek-direction from the authority on completion of the project the sales deed to be executed in my (Complainant) favor 30 May 2025 · Posted For Orders Authority Bench5
- Delivery date expiry 10 Jun 2025 · Disposed Authority Bench5
- Expedited completion of project as per specs to obtain OC and registration along with compensation for the delay 11 Jun 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Jun 2025 · Disposed Authority Bench5
- Delayed possession - Refund 11 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT AND ALSO DIRECTION FROM AUTHORITY AS SALE DEED TO BE EXECUTED IN MY/OUR FAVOR 11 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 12 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 12 Jun 2025 · Disposed Authority Bench5
- INTEREST ON DELAY PERIOD 12 Jun 2025 · Disposed Authority Bench5
- Seeking Completion of Project & interest on Delay period from Promoter till pocession of allotted apartment is completed as monthly payment 12 Jun 2025 · Disposed Authority Bench5
- Delayed Compensation for the breach in flat delivery date as per the sale and construction agreement 13 Jun 2025 · Disposed Authority Bench5
- Delay in construction completion and possession. 17 Jun 2025 · Disposed Authority Bench5
- Delayed Interest - Relief to seek - Direction from Authority - On Completion of Project - Sale deed to be executed in my favour 17 Jun 2025 · Disposed Authority Bench5
- Seeking interest on delay period from promoter till possession of allotted apartment is completed as monthly payment 17 Jun 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 17 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 18 Jun 2025 · Disposed Authority Bench5
- Seeking Completion of Project and Interest on Delayed period 18 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 18 Jun 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 18 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 19 Jun 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT . 19 Jun 2025 · Disposed Authority Bench5
- Seeking Interest on Delay Period from promoter till possession of allotted apartment is completed as monthly payment. 19 Jun 2025 · Disposed Authority Bench5
- Interest on Delayed period - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in our favour 19 Jun 2025 · Disposed Authority Bench5
- Seeking Completion of Project and Interest on Delayed period.Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 30 Jun 2025 · Disposed Authority Bench5
- Seeking Complete refund with applicable interest rates on delayed period 1 Jul 2025 · Disposed Authority Bench5
- The complainant seeks cancellation of booking of Flat No. B2-11-14 and refund of the amount paid towards sale consideration 2 Jul 2025 · Posted For Orders Authority Bench5
- The complainants seeks cancellation of booking of Flat No. B1-11-14 and refund of the amount paid towards sale consideration 2 Jul 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in our favour 8 Jul 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 8 Jul 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 11 Jul 2025 · Disposed Authority Bench5
- Seeking interest on the delayed period from promoter till possesion of alloted apartment is completed as monthly payment 14 Jul 2025 · Posted For Orders Authority Bench5
- Delayed Interest - Relief to seek - Direction from the Authority - On completion of project - Sale deed to be executed in my favour 14 Jul 2025 · Disposed Authority Bench5
- Delay period interests 14 Jul 2025 · Disposed Authority Bench5
- The Complainant is seeking to enforce her rights under section 18 of the RERA Act, due to non-completion and non-hand over of the apartment to the Complainant 15 Jul 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 16 Jul 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour. 16 Jul 2025 · Disposed Authority Bench5
- Seeking Interest on Delay Period from Promoter till Possession of allotted apartment is completed as monthly payment 17 Jul 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION ALLOTED APPARTMENT IS COMPLETED AS MONTHLY BASIS. 17 Jul 2025 · Disposed Authority Bench5
- Seeking Interest on Delay Period from Promoter till possession of allotted apartment is completed 22 Jul 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 22 Jul 2025 · Disposed Authority Bench5
- Seeking Interest on Delay Period from Promoter till Possession of allotted apartment is completed as monthly payment 22 Jul 2025 · Disposed Authority Bench5
- PROJECT HAS STALLED AND BREACH OF SALE AGRREMENT BY BUILDER 29 Jul 2025 · Disposed Authority Bench5
- Seeking Completion of Project and Interest on Delayed period 29 Jul 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 29 Jul 2025 · Posted For Orders Authority Bench5
- Respondents have not handed over the apartment to the Complainants, and hence the present Complaint is preferred for Interest for Delay Period under section 18 of the RERA Act,2016 29 Jul 2025 · Disposed Authority Bench5
- Breach of Agreement and not handed over premises as promised even after full payments made 1 Aug 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 8 Aug 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 16 Aug 2025 · Posted For Orders Authority Bench5
- Refund with Interest 16 Aug 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 16 Aug 2025 · Disposed Authority Bench5
- Delayed flat handover 20 Aug 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION ALLOTED APPARTMENT IS COMPLETED AS MONTHLY BASIS 29 Aug 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 29 Aug 2025 · Posted For Orders Authority Bench5
- Interest on delay | Non delivery of Apartment within stipulated time period 29 Aug 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 29 Aug 2025 · Under Process Authority Bench5
- Seeking interest on delayed period from promoter till possession of allotted apartment is completed as monthly payment 30 Aug 2025 · Posted For Orders Authority Bench5
- Request for Compensation of delayed possession as per Agreement 1 Sep 2025 · Posted For Orders Authority Bench5
- Delayed interest, relief to seek, direction from the authority on completion of project, sale deed to be executed in my favor. 1 Sep 2025 · Disposed Authority Bench5
- Seeking interest on delayed period from promoter till possession of allotted apartment is completed as monthly payment 1 Sep 2025 · Posted For Orders Authority Bench5
- Delayed possession requiring refund of entire amount with interest 1 Sep 2025 · Posted For Orders Authority Bench5
- interest on delay period 3 Sep 2025 · Disposed Authority Bench5
- Seeking Completion of Project, Providing OC & Interest on Delayed period 8 Sep 2025 · Disposed Authority Bench5
- No refund after cancellation of booking 11 Sep 2025 · Posted For Orders Authority Bench5
- SEEKING INTERSET OF DELAY PERIOD FROM PROMOTER TILL POSSESION OF ALLOTTED APARTMENT IS COMPLETED IS COMPLETED AS MONTHLY PAYMENTS 11 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Disposed Authority Bench5
- Delayed Interest - Relief to seek - Direction from the Authority - On Completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 15 Sep 2025 · Disposed Authority Bench5
- Interest on delay | Non delivery of Apartment within stipulated time period 18 Sep 2025 · Disposed Authority Bench5
- Interest on delay | Non delivery of Apartment within stipulated time period 18 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 20 Sep 2025 · Disposed Authority Bench5
- Seeking Interest on Delay Period from Promoter till possession of Allotted apartment is completed on Monthly basis 24 Sep 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project Sale deed to be executed in Complainant's favour 9 Oct 2025 · Disposed Authority Bench5
- Non-Refund of Amount After Flat Cancellation Despite Repeated Follow-Ups – Violation of RERA Norms 28 Oct 2025 · Disposed Authority Bench5
- Seeking completion of project and interest on delayed period 24 Nov 2025 · Posted For Orders Authority Bench5
- Delay in handover and possession of the property 1 Dec 2025 · Under Enquiry Authority Bench5
- REFUND OF PRINCIPAL & INTEREST AMOUNT TO EXIT FROM THE PROJECT(CANCELLATION OF UNIT A1-11-18 IN GM AMBITIOUS ENCLAVE) IN LIEU OF DELAY IN COMPLETION & HANDOVER OF PROPERTY BY GM INFINITE 11 Dec 2025 · Posted For Orders Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 19 Dec 2025 · Disposed Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 20 Dec 2025 · Under Enquiry Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 22 Dec 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 22 Dec 2025 · Disposed Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 22 Dec 2025 · Under Enquiry Authority Bench5
- Complaint against Builder for Inordinate Delay in Possession of Flat Purchased in 2018 – Violation of RERA Provisions 30 Dec 2025 · Posted For Orders Authority Bench5
- "Delay Interest" - Relief to seek - direction from the authority - on completion of project and the sale deed to be executed in our favor 3 Jan 2026 · Disposed Authority Bench5
- Interest on delay period due to Delay in Project Delivery 5 Jan 2026 · Under Enquiry Authority Bench5
- Refund from Builder is not done, even after due to date. (Project Stalled/Delayed) 8 Jan 2026 · Under Enquiry Authority Bench5
- Complaint under Section 31 of the RERA Act for interest on delayed possession of Flat No. A2-10-08 in the project 'GM Ambitious Enclave' 12 Jan 2026 · Under Enquiry Authority Bench5
- Seeking intrest on delay period from promoter till possession of alloted apartment is completed as monthly payment. 16 Jan 2026 · Under Enquiry Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completionof Project - Sale deed to be executed in my favour 22 Jan 2026 · Under Enquiry Authority Bench5
- Refund along with interest and compensation 29 Jan 2026 · Under Enquiry Authority Bench5
- Interest on delay period due to delay in handover of possession. 31 Jan 2026 · Under Enquiry Authority Bench5
- Reund and interest not paid 4 Feb 2026 · Disposed Authority Bench5
- Seeking Interest on Delay in project completion & Handover 5 Mar 2026 · Under Enquiry Authority Bench5
- Seeking Interest on Delay in project completion and Handover 23 Mar 2026 · Under Enquiry Authority Bench5
- Delay in possession 27 Mar 2026 · Under Enquiry Authority Bench5
- Complaint under Section 31 of the Real Estate (Regulatory and Development) Act, 2016 31 Mar 2026 · Disposed Authority Bench5
- DELAY IN HANDING OVER OF FLAT 1 Apr 2026 · Under Enquiry Authority Bench5
- Delivery Not done 8 Apr 2026 · Under Enquiry Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 17 Apr 2026 · Under Enquiry Authority Bench5
- Delay in possession and request for refund with interest for flat booked in GM Ambitious Enclave 21 Apr 2026 · Under Enquiry Authority Bench5
- Request for refund due to delay in possession and non-fulfilment of agreement terms 4 May 2026 · Under Enquiry Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 5 May 2026 · Under Enquiry Authority Bench5
- Request for Cancellation of Agreement and Refund with Interest Due to Delay in Possession of Flat A2-07-15, GM Ambitious Enclave, and Financial Hardship from Continued EMI Payments 11 May 2026 · Under Enquiry Authority Bench5
- Flat status unknown 15 May 2026 · Under Enquiry Authority Bench5
- Delay in delivery of Apartment 25 May 2026 · Under Enquiry Authority Bench5
- Refund on the property as requested during cancellation due to construction delay 26 May 2026 · Under Enquiry Authority Bench5
- Delay Period Interest 26 May 2026 · Under Enquiry Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENT 26 May 2026 · Under Enquiry Authority Bench5
- Compensation for the delayed possession 1 Jun 2026 · Under Enquiry Authority Bench5
- Handover of possession, registration of sale deed and interest on delay period. 5 Jun 2026 · Under Enquiry Authority Bench5
- BREACH OF AGREEMENT AND DELAY IN COMPLETTION OF PROJECT 12 Jun 2026 · Under Enquiry Authority Bench5
- Refund and Compensation under section 31 read with section 18 of the RERA, 2016 16 Jun 2026 · Under Enquiry Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 27 Jul 2026 · Under Enquiry Authority Bench5
- Non Adherence of Project Handover Time lines and Refund after Cancellation 29 Jul 2026 · Under Enquiry Authority Bench5
- Seeking Refund of the Amount paid along with interest 4 Aug 2026 · Under Enquiry Authority Bench5
- Seeking complete Refund including the Interest for the overall delay 17 Aug 2026 · Under Enquiry Authority Bench5
- Interest on delay period 19 Aug 2026 · Under Enquiry Authority Bench5
- Delayed interest - Relief to seek - Direction from the Authority - On completion of Project - Sale deed to be executed in my favour 25 Aug 2026 · Under Enquiry Authority Bench5
- Claim for interest/compensation on delayed possession under Section 18 of RERA Act, 2016 25 Aug 2026 · Under Enquiry Authority Bench5
- Apartment delivery date expiried 31 Aug 2026 · Under Enquiry Authority Bench5
- Hand over possession or Refund entire amount paid along with the interest as prescribed under RERA, Compensation and penality 11 Sep 2026 · Under Process Authority Bench5
- SEEKING INTEREST ON DELAY PERIOD FROM PROMOTER TILL POSSESSION OF ALLOTTED APARTMENT IS COMPLETED AS MONTHLY PAYMENTS 15 Sep 2026 · Under Process Authority Bench5
- Project is not completed and stalled for 8 years 2 Oct 2026 · Scrutiny Completed
- Cancellation of Flat Purchased Refund not received 16 Oct 2026 · Scrutiny Completed
- Return of amount paid with intrest 23 Oct 2026 · Scrutiny Completed
Documents
59 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹113.4 cr
- Construction
- ₹698.9 cr
- Total project cost
- ₹812.3 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
This project lists no location on RERA, so there is no location report for it.