by G K DEVELOPERS · 92 homes · 0.99 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Dec 2026. 99% built with 94% of the time used. 52% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
99% built

Due 31 Dec 2026. 94% of the time from RERA approval to the deadline has passed.

Built99%
Time used94%
How much is sold?44 left
52% booked

48 of 92 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
93 homes per acre

Similar projects within 3 km: 72 per acre. 51% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Litigation
Declared

The builder declares litigation on the land or the project.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Sep 2023
  2. Approved by RERA6 Sep 2023
  3. Today24 Oct 2026

    94% of the time to the deadline has passed.

  4. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2680%
Q4 2025-2699%
Q1 2026-2799%
Q2 2026-2799%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

48 booked44 leftQ2 2026-27

Still available: 29 × 2BHK + 2T, 15 × 3BHK + 3T.

Booked, by type

2BHK + 2T27 of 56
3BHK + 2T4 of 4
3BHK + 3T17 of 32

Booked, each quarter

Q3 2025-2633 of 92
Q4 2025-2638 of 92
Q1 2026-2742 of 92
Q2 2026-2748 of 92

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2BHK + 2T
904 sq ft
84 m² carpet · sizes 741–912 sq ft (12 at this size)
40 m² land share · 5 m² balcony/terrace · 1 parking space
56 homes · 61% of the project
3BHK + 3T
913 sq ft
85 m² carpet · sizes 913–1,127 sq ft (4 at this size)
46 m² land share · 8 m² balcony/terrace · 1 parking space
32 homes · 35% of the project
3BHK + 2T
919 sq ft
85 m² carpet
45 m² land share · 10 m² balcony/terrace · 1 parking space
4 homes · 4% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Gk Gateway3 floors

Gk Gateway: 92 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project93
Typical within 3 km (85)72
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project51%
Typical within 3 km (85)69%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.99 acres

3,996 m²

Ground covered by buildings
49% of the land

1,969 m²

Floor-area ratio
2.24

Floors built per unit of land: 2.24 m² of floors for each m² of land.

Parking
1.11 per home

102 covered, 0 open

Built-up area, all floors
1,23,096 sq ft

11,436 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
G K DEVELOPERS
Type
Partnership Firm
PAN
AAQFG1564P
GSTIN
29AAQFG1564P1ZK

The land is owned together with others (a joint development), including GK Developers.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹14.7 crBuilding and development ₹27.4 crTotal ₹42.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.7 cr₹3.7 cr
Q4 2025-26₹12.0 lakh₹3.8 cr
Q1 2026-27₹4.9 cr₹2.2 cr
Q2 2026-27₹3.4 cr₹3.9 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.22 kmReliable
  • Nearest railway station3.23 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km6Caveat
  • Parks within 1 km9Caveat
  • Nearest lake / water body (≥2 ha)0.37 kmCaveat

Hospitals

  • Nearest hospital1.09 kmCaveat

Schools

  • Schools in pincode 560066 (UDISE+ census)44Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km3Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionWhitefield PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km3Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)yesCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km6Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.66 kmReliable
  • Nearest sewage treatment plant0.55 kmCaveat
  • Industrial zones within 1 km1Caveat
  • Nearest airfield runway (any, incl. military)6.59 kmCaveat
  • Nearest commercial-airport runway23.54 kmReliable
  • Distance to runway approach-path proxy22.62 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.97674, 77.73936), 2026-10-24. Each figure's source and caveat are in the full report.