RERA project · Residential/Group Housing
GINA ARTIZE
by GINA ENGINEERING COMPANY PRIVATE LIMITED · 134 homes · 1.67 acres · 1 tower · Anekal
Delivered late Completed: the builder filed for completion on 27 Dec 2025, 27 days after the date it first promised.
At a glance
The builder filed for completion on 27 Dec 2025, 27 days after the date it first promised.
75 of 134 homes, as the builder reported for Q3 2025-26.
Similar projects within 3 km: 83 per acre. 69% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started15 May 2023
- Approved by RERA13 Jul 2023
- Completion filed27 Dec 2025
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 51 × 2 BHK, 8 × 3 BHK.
Booked, by type
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Gina Artize: 134 homes, 25 m tall, 1 basement
Amenities
- Electricity 80 m²
- CCTV Surveillance 11 m²
- Club House 353 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.67 acres
- Ground covered by buildings
- 31% of the land
- Floor-area ratio
- 1.98
- Parking
- 1.00 per home
- Built-up area, all floors
- 2,14,169 sq ft
6,740 m²
2,114 m²
Floors built per unit of land: 1.98 m² of floors for each m² of land.
134 covered, 0 open
19,897 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.
The company
- Registered as
- GINA ENGINEERING COMPANY PRIVATE LIMITED
- Type
- Company
- PAN
- AAACG5177D
- GSTIN
- 29AAACG5177D1ZM
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/130723/006062 · Approved
- Building plan approvedBMRDA - Bangalore Metropolitan Region Development Authority · 338/2014-15 · 6 Apr 2023
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q3 2025-26 update
- Water sourceBoreWell
Complaints to RERA about this project
None on RERA Karnataka.
Documents
137 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹4.8 cr | ₹3.4 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station6.59 kmReliable
- Nearest railway station8.24 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)1.53 kmCaveat
Hospitals
- Nearest hospital0.96 kmCaveat
Schools
- Schools in pincode 560105 (UDISE+ census)82Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
- Median pupil-teacher ratio, schools within 1 km27.9 :1Caveat
- Schools with library + playground + ICT lab (1 km)2Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionJigani PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km1Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)6.46 kmReliable
- Nearest sewage treatment plant3.93 kmCaveat
- Industrial zones within 1 km38Caveat
- Nearest airfield runway (any, incl. military)18.79 kmCaveat
- Nearest commercial-airport runway45.66 kmReliable
- Distance to runway approach-path proxy44.06 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat
ReliableFrom our location report at the builder-entered pin (12.77910, 77.64360), 2026-10-24. Each figure's source and caveat are in the full report.