RERA project · Mixed Development
GARUDA CREEK VIEW
by GARUDACHALA ESTATES PVT. LTD. · 258 homes · 2.06 acres · 2 towers · Bengaluru East
Past due, no completion filed Past its deadline of 31 Dec 2025, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.
At a glance
The deadline was 31 Dec 2025, and no completion is filed.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 62 per acre. 52% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 2 past due with no completion filed.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started15 Apr 2022
- Approved by RERA2 Aug 2022
- Deadline31 Dec 2025
Passed with no completion filed.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Garuda Creek View 1: 208 homes, 40 m tall, 2 basements · Garuda Creek View 2: 50 homes, 29 m tall, 2 basements
Amenities
- Electricity 60 m²
- CCTV Surveillance 10 m²
- Club House 628 m²
- Community Hall 140 m²
- Outdoor Sports facility 30 m²
- Indoor Sports facility 140 m²
- Swimming Pool 315 m²
- Gym 62 m²
- Parks 30 m²
- Power Backup 25 m²
- Water and Sanitation 30 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.06 acres
- Ground covered by buildings
- 49% of the land
- Floor-area ratio
- 27035.90
- Parking
- 2.22 per home
- Built-up area, all floors
- 5,04,622 sq ft
8,332 m²
4,042 m²
Floors built per unit of land: 27035.90 m² of floors for each m² of land.
274 covered, 24 open
46,881 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active mixed development projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of Garudachala Estates Pvt Ltd on the map
The company
- Registered as
- GARUDACHALA ESTATES PVT. LTD.
- Type
- Company
- Company number
- U70100KA2011PTC061681
- PAN
- AAECG6955B
- GSTIN
- 29AAECG6955B3ZG
- Website
- [email protected]
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
- Garuda Vista PRM/KA/RERA/1251/446/PR/181022/002086 · approved 22 Oct 2018
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/020822/005117 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · PRJ/7728/21-22 · 8 Apr 2022
- Litigation on the landNone declared
- Litigation on the projectNot stated
- Water sourceBoreWell,BWSSB
Complaints to RERA about this project
- Urgent Appeal for Investigation and Justice Regarding Fraudulent Activity in Project Garuda Creek View 11 Feb 2025 · Disposed Authority Bench4
- Builder in not following the Payment Schedule as per the Sales Agreement 10 Jun 2025 · Disposed Authority Bench4
- Project Not delivered past RERA deadline, and unclear communication 12 Mar 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 3 Jun 2026 · Under Enquiry Authority Bench4
- Non-delivery of Flat 209, Block A past registered date 31.12.2025; project stalled/abandoned; undisclosed Bajaj mortgage now under SARFAESI. 3 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 5 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 6 Jun 2026 · Under Enquiry Authority Bench4
- Seeking compensation and refund due to project delay 9 Jun 2026 · Under Enquiry Authority Bench4
- Complaint for delay in Completion and Possession of Apartment, Violation of Provisions of the RERA Act, 2016 10 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project, stoppage of construction, and request for KRERA spot inspection 15 Jun 2026 · Under Enquiry Authority Bench4
- Delay in handing over possession of apartment in Garuda Creek View beyond the RERA-registered completion date of 31-12-2025 15 Jun 2026 · Under Enquiry Authority Bench4
- Complaint Regarding Delay in Possession Beyond Committed Timeline, Lack of Communication, Unreachable Project Management, and Request for Delay Compensation – Garuda Creek View 15 Jun 2026 · Under Enquiry Authority Bench4
- Breach of Agreement, Fraud, Refund & Compensation 16 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, unauthorised and stalled construction 16 Jun 2026 · Under Enquiry Authority Bench4
- Compliant regarding delay in handover of the Garuda Creek View project. Construction of the project is stopped, request for KRERA to spot inspection and help us in handover of possession 23 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 23 Jun 2026 · Under Enquiry Authority Bench4
- Delayed possession of Flat 802 (Block-A) beyond 31-12-2025, stalled construction, non-responsiveness, and illegal construction exceeding the BBMP-sanctioned 12-floor limit 23 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage ofconstruction, Request for KRERA SPOT inspection, and expeditious handover ofpossession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage ofconstruction, Request for KRERA SPOT inspection, and expeditious handover ofpossession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 24 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion of GCV Project, stoppage of construction, Request for KRERA SPOT inspection, pay interest for delayed possession and expeditious handover of possession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage ofconstruction, Request for KRERA SPOT inspection, and expeditious handover ofpossession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage ofconstruction, Request for KRERA SPOT inspection, and expeditious handover of possession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, completely stopping of any construction, Request for KRERA spot inspection and handover of the flat this year 24 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project,stoppage of construction, and request for KRERA spot inspection 24 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession along with delay compensation 24 Jun 2026 · Under Enquiry Authority Bench4
- Complain regarding delay in completion of Garuda creek view project, stoppage of construction , Request for KRERA spot inspection and expeditious handover of possession. 24 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion of project , stoppage of construction. 25 Jun 2026 · Under Enquiry Authority Bench4
- Project not completed as per the agreement and delay 25 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 25 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project beyond RERA registered completion date of 31-12-2025 25 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 25 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Crek View Project, stoppage of construction, Request for KRERA spot inspection and interest on delay period 29 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 29 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection and expeditious handoff of possession. 29 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in Completion of project 29 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 29 Jun 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project, stoppage of construction and request for KRERA spot inspection 29 Jun 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 29 Jun 2026 · Under Enquiry Authority Bench4
- Complaint Regarding Delay in Garuda Creek View Project, Construction Stoppage, KRERA Spot Inspection & Delayed Possession Relief 2 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project, stoppage of construction, and request for KRERA spot inspection 3 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project,stoppage of construction, and request for KRERA spot inspection 4 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project, stoppage of construction, and request for KRERA spot inspection 6 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, NoConstruction Progress, Seeking DelayInterest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 7 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion of GCV Project stoppage of construction Request for KRERA SPOT inspection pay interest for delayed possession and expeditious handover of possession 8 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 8 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 15 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection and expeditious handover of possession. 15 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 15 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project,stoppage of construction, and request for KRERA spot inspection 16 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 16 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 16 Jul 2026 · Under Enquiry Authority Bench4
- Delayed possession of Flat 907 beyond 31-12-2025, stalled construction, non-responsiveness, and illegal construction exceeding the BBMP-sanctioned 12-floor limit 17 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 18 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 20 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in Completion of Garuda Creek View project. Stoppage of construction, request for KRERA spot inspection and expeditious handover of Possession 23 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion Beyond RERA Committed Date and Non-Response to Buyer Communications 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expedite handover of possession. 23 Jul 2026 · Under Enquiry Authority Bench4
- ILLEGEAL CONSTRUCTION AND ABANDONED 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage ofconstruction, Request for KRERA SPOT inspection, and expeditious handover of possession 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in possession beyond committed timeline, lack of communication, unreachable project management, stalled construction, and request for delay compensation 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding dealy in completion of Garuda Creek View Project, stoppage of current construction, request for KRERA spot inspection, and expeditious handover of posession 23 Jul 2026 · Under Enquiry Authority Bench4
- Direct the Respondent to complete the project and hand over possession within a time-bound schedule. Direct the Respondent to provide compensation/delay interest under Section 18 of the RERA Act Reque 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creekview Project,construction halted, request for expeditious handover of possession and delayed compensation 23 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 24 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creekview project, stoppage of construction, request for KRERA spot inspection and expedite handover of pocession 24 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 24 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA spot inspection, and expeditious handover of possession 24 Jul 2026 · Under Enquiry Authority Bench4
- Delay in handing over possession of Flat No. 1208 in Garuda Creek View despite expiry of agreed possession period. 24 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project, stoppage of construction and request for KRERA spot inspection 24 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 24 Jul 2026 · Under Enquiry Authority Bench4
- Compliant regarding delay in compensation of Garuda creek view Project, Stoppage of Construction, Request for KRERA SPOT Inspection and Expeditious handover of Posesssion 24 Jul 2026 · Under Enquiry Authority Bench4
- Compliant regarding delay in handover of the Garuda Creek View project. Construction of the project is stopped, request for KRERA to spot inspection and help us in handover of possession 24 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage ofconstruction, Request for KRERA SPOT inspection, and expeditious handover ofpossession 24 Jul 2026 · Under Enquiry Authority Bench4
- Complaint Against M/s Garudachala Estates Private Limited for Delay in Possession — Project "Garuda Creek View" (KRERA Reg. No. PRM/KA/RERA/1251/446/PR/020822/005117), Apartment No. 514 24 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion and possession of Garuda Creek View Project,stoppage of construction, and request for KRERA spot inspection 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complain regarding Delay in Completion of Garuda Creekview Project, Stoppage of Construction, Expect Completion of project at earliest in a livable condition with all amenities promised. 27 Jul 2026 · Under Enquiry Authority Bench4
- Delay in completion of project, Stoppage of Construction, Request for KRERA Spot insptection, Request for compensation for delay 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of the Garuda Creek View Project, request for KRERA spot inspection, handover of possession, and delay compensation 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 27 Jul 2026 · Under Enquiry Authority Bench4
- Complaints regarding Delay in completion, work has been stalled, requesting KREAR spot inspection and handover to be done sooner 27 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest - Compensation & Possession. 28 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Delivery of the Apartment 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Work has been stalled, Project completion date is over and builder not providing any update, KARERA inspection is requested, Request for handover of flat at the earliest 28 Jul 2026 · Under Enquiry Authority Bench4
- omplaint regarding inordinate delay in completion of the Garuda Creek View project. Request for the Hon’ble Karnataka RERA (KRERA) to conduct a spot inspection of the project site and issue directions 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda creek view project ,work has stopped , want the handover sooner 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession. 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for expeditious handover of possession, compensation for delay 28 Jul 2026 · Under Enquiry Authority Bench4
- Possession Delay No Clarification and Compensation 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Project not delivered past RERA deadline and unclear communication on site updates from the builder 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Delay in Flat delivery from Builder 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 28 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View project, stoppage of contruction, request for KRERA spot inspection, and expedite handover of possession 29 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding non-delivery of apartment and stalled construction at Garuda Creek View project 29 Jul 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 3 Aug 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View project, stoppage of construction, and expeditious handover of possession 3 Aug 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 3 Aug 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 3 Aug 2026 · Under Enquiry Authority Bench4
- Complaint Regarding Delay in Completion of the Garuda Creek View Project, Stoppage of Construction, Request for a KRERA Spot Inspection, and Expedited Handover of Possession 4 Aug 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 4 Aug 2026 · Under Enquiry Authority Bench4
- Complaint Against M/S.GARUDACHALA ESTATES PVT. LTD. for delay in possession - Project " Garuda Creek View" (KRERA Reg No PRM/KA/RERA/1251/446/PR/020822/005117) Apartment No: 1109 4 Aug 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 4 Aug 2026 · Under Enquiry Authority Bench4
- Delay in Project Completion, No Construction Progress, Seeking Delay Interest & Possession. 4 Aug 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 7 Aug 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, request for KRERA spot inspection, and expeditious handover of possession 11 Aug 2026 · Under Enquiry Authority Bench4
- Complaint regarding delay in completion of Garuda Creek View Project, stoppage of construction, Request for KRERA SPOT inspection, and expeditious handover of possession 18 Aug 2026 · Under Enquiry Authority Bench4
- Complaint for delayed possession, interest under Section 18 and violation of RERA provisions 18 Aug 2026 · Under Enquiry Authority Bench4
- Complaint for delayed possession, interest under Section 18 and violation of RERA provisions 24 Aug 2026 · Under Enquiry Authority Bench4
- Delay in completion of Garuda Creekview Project, Stoppage of construction, sooner possession of flat. Also no monthly compensation for delay as mentioned in agreement. 7 Sep 2026 · Under Enquiry Authority Bench4
- Complaint for delayed possession, interest under Section 18 and violation of RERA provisions 15 Sep 2026 · Under Enquiry Authority Bench4
Documents
134 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station4.48 kmReliable
- Nearest railway station5.43 kmReliable
- Bus stops within 500 m2Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km1Caveat
- Nearest lake / water body (≥2 ha)0.41 kmCaveat
Hospitals
- Nearest hospital1.41 kmCaveat
Schools
- Schools in pincode 560049 (UDISE+ census)110Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionAvalahally PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)noCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km1Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)5.9 kmReliable
- Nearest sewage treatment plant0.88 kmCaveat
- Industrial zones within 1 km9Caveat
- Nearest airfield runway (any, incl. military)9.56 kmCaveat
- Nearest commercial-airport runway17.75 kmReliable
- Distance to runway approach-path proxy17.14 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (13.02880, 77.72382), 2026-10-24. Each figure's source and caveat are in the full report.