RERA project · Commercial
Garden of Eden by UKN
by UKN Properties Pvt Ltd · 15 homes · 1.39 acres · 3 towers · Bengaluru East
Delivered on time Completed: the builder filed for completion on 12 Oct 2021, by the date it promised.
At a glance
The builder filed for completion on 12 Oct 2021, by the date it promised.
The builder has not filed bookings on RERA.
Similar projects within 3 km: 14 per acre. 34% of the land is left open.
Complaints to RERA about this project. 1 more about the builder's other projects.
The RERA page doesn't say.
Of its 2 RERA projects in Bengaluru Urban: 1 delivered on time, 1 late (after the date first promised).
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started1 Feb 2018
- Approved by RERA17 Feb 2018
- Completion filed12 Oct 2021
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
- First promised1 Feb 2022
The date the builder gave at registration.
No quarterly construction update is filed on this project's RERA page.
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
A: 5 homes, 2 basements · B: 5 homes, 2 basements · C: 5 homes, 2 basements
Amenities
- Electricity
- Swimming Pool
- Power Backup
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 1.39 acres
- Ground covered by buildings
- 33% of the land
5,608 m²
1,833 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active commercial projects with a land area on RERA; the comparison is ours.
Who is building it?
All 2 RERA projects of UKN Properties Pvt Ltd on the map
Complaints to RERA about its other projects
- BELVEDERE by UKN AIRPORT DISTRICT -PHASE 1 1 complaint
The company
- Registered as
- UKN Properties Pvt Ltd
- Type
- Company
- PAN
- AAACU3584A
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/180217/002407 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike
- Litigation on the landNot stated
- Litigation on the projectNot stated
Complaints to RERA about this project
None on RERA Karnataka.
Documents
74 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
- Land
- ₹13.2 cr
- Construction
- ₹30.0 cr
- Total project cost
- ₹43.2 cr
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station0.75 kmReliable
- Nearest railway station2.08 kmReliable
- Bus stops within 500 m10Caveat
Parks, shops, daily needs
- Supermarkets within 1 km4Caveat
- Parks within 1 km13Caveat
- Nearest lake / water body (≥2 ha)0.74 kmCaveat
Hospitals
- Nearest hospital0.47 kmCaveat
Schools
- Schools in pincode 560066 (UDISE+ census)44Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km7Caveat
- Median pupil-teacher ratio, schools within 1 km21 :1Caveat
- Schools with library + playground + ICT lab (1 km)3Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionWhitefield PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)yesCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km10Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)11.45 kmReliable
- Nearest sewage treatment plant1.55 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)6.34 kmCaveat
- Nearest commercial-airport runway23.25 kmReliable
- Distance to runway approach-path proxy22.05 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.98039, 77.75131), 2026-10-24. Each figure's source and caveat are in the full report.