Upcoming Under construction, due Nov 2026, after an extension. 80% built with 98% of the time used. 58% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
80% built

Due 30 Nov 2026. 98% of the time from RERA approval to the deadline has passed.

Built80%
Time used98%
How much is sold?119 left
58% booked

163 of 282 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
69 homes per acre

Similar projects within 3 km: 50 per acre. 72% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 1 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Dec 2020
  2. Approved by RERA15 Dec 2020
  3. First promised30 Nov 2025

    The date the builder gave at registration.

  4. Today24 Oct 2026

    98% of the time to the deadline has passed.

  5. If it slips like a typical project1 Sep 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2664%
Q4 2025-2668%
Q1 2026-2775%
Q2 2026-2780%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block A100%
Block B100%
Block C100%
Block D100%
Block E100%
Block F100%
Block G95%
Block H95%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

163 booked119 leftQ2 2026-27

Still available: 35 × 1BHK, 1 × 3 BHK, 12 × 2BHK, 71 × 3BHK.

Booked, by type

1BHK10 of 45
2 BHK13 of 13
3 BHK27 of 28
2BHK43 of 55
3BHK70 of 141

Booked, each quarter

Q3 2025-26122 of 282
Q4 2025-26133 of 282
Q1 2026-27146 of 282
Q2 2026-27163 of 282

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
966 sq ft
90 m² carpet · sizes 966–1,052 sq ft (53 at this size)
32 m² land share · 12 m² balcony/terrace · 1 parking space
141 homes · 50% of the project
2BHK
770 sq ft
72 m² carpet
25 m² land share · 9 m² balcony/terrace · 1 parking space
55 homes · 20% of the project
1BHK
417 sq ft
39 m² carpet · sizes 417–689 sq ft (16 at this size)
15 m² land share · 6 m² balcony/terrace
45 homes · 16% of the project
3 BHK
1,016 sq ft
94 m² carpet · sizes 966–1,016 sq ft (18 at this size)
33 m² land share · 12 m² balcony/terrace · 1 parking space
28 homes · 10% of the project
2 BHK
770 sq ft
72 m² carpet
25 m² land share · 9 m² balcony/terrace · 1 parking space
13 homes · 5% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

Block A13 floors
Block B13 floors
Block C13 floors
Block D13 floors
Block E13 floors
Block F13 floors
Block G13 floors
Block H13 floors

Block A: 45 homes, 1 basement · Block B: 40 homes, 1 basement · Block C: 38 homes, 1 basement · Block D: 31 homes, 1 basement · Block E: 28 homes, 1 basement · Block F: 33 homes, 1 basement · Block G: 33 homes, 1 basement · Block H: 34 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project69
Typical within 3 km (22)50
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project72%
Typical within 3 km (22)57%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
4.07 acres

16,489 m²

Ground covered by buildings
28% of the land

4,691 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

Complaints to RERA about its other projects

The company

Registered as
G R CONSTRUCTIONS
Type
Partnership Firm
PAN
AADFG6207A

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹4.2 cr
Construction
₹99.2 cr
Total project cost
₹121.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹8.1 cr₹8.0 cr
Q4 2025-26₹7.8 cr₹7.7 cr
Q1 2026-27₹6.5 cr₹6.6 cr
Q2 2026-27₹6.4 cr₹6.2 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station10.1 kmReliable
  • Nearest railway station7.54 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.7 kmCaveat

Hospitals

  • Nearest hospital1.52 kmCaveat

Schools

  • Schools in pincode 562107 (UDISE+ census)71Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionAttibele PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)16.98 kmReliable
  • Nearest sewage treatment plant1.2 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)20.16 kmCaveat
  • Nearest commercial-airport runway44.07 kmReliable
  • Distance to runway approach-path proxy42.23 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.79385, 77.77775), 2026-10-24. Each figure's source and caveat are in the full report.