Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

G R GARDENIA

by G R PROMOTERS · 100 homes · 1.36 acres · 2 towers · Bengaluru South

Delivered on time Completed: the builder filed for completion on 21 May 2020, by the date it promised.

Location report

At a glance

Was it on time?Delivered on time
Completed

The builder filed for completion on 21 May 2020, by the date it promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
73 homes per acre

Similar projects within 3 km: 80 per acre. 65% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 3 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?5 due so far
40% on time

Of its 5 RERA projects in Bengaluru Urban: 2 delivered on time, 1 late (after the date first promised), 2 past due with no completion filed.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started3 Sep 2018
  2. Approved by RERA26 Dec 2018
  3. Completion filed21 May 2020

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
747 sq ft
69 m² carpet · sizes 687–747 sq ft (18 at this size)
53 m² land share · 18 m² balcony/terrace · 1 parking space
70 homes · 70% of the project
3BHK
878 sq ft
82 m² carpet · sizes 878–967 sq ft (10 at this size)
65 m² land share · 22 m² balcony/terrace · 1 parking space
30 homes · 30% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A4 floors
Block B4 floors

Block A: 50 homes, 1 basement · Block B: 50 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project73
Typical within 3 km (29)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project65%
Typical within 3 km (29)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.36 acres

5,514 m²

Ground covered by buildings
35% of the land

1,924 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of G R PROMOTERS on the map

Complaints to RERA about its other projects

The company

Registered as
G R PROMOTERS
Type
Partnership Firm
PAN
AAPFG1693N

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹2.0 cr
Construction
₹18.5 cr
Total project cost
₹20.5 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.85 kmReliable
  • Nearest railway station6.73 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.39 kmCaveat

Hospitals

  • Nearest hospital1.19 kmCaveat

Schools

  • Schools in pincode 560100 (UDISE+ census)75Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
  • Schools with library + playground + ICT lab (1 km)3Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionJigani PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km9Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.71 kmReliable
  • Nearest sewage treatment plant4.56 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)13.18 kmCaveat
  • Nearest commercial-airport runway40.03 kmReliable
  • Distance to runway approach-path proxy38.56 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.82958, 77.65131), 2026-10-24. Each figure's source and caveat are in the full report.