Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

fourwalls avenue

by Fourwalls Avenue · 203 homes · 0.94 acres · 1 tower · Anekal

Upcoming Under construction, due Dec 2026, after an extension. 100% built with 96% of the time used. 49% of homes booked.

Location report

At a glance

Is it on schedule?Deadline extended
100% built

Due 31 Dec 2026. 96% of the time from RERA approval to the deadline has passed.

Built100%
Time used96%
How much is sold?103 left
49% booked

100 of 203 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
215 homes per acre

Similar projects within 3 km: 74 per acre. 69% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started2 Nov 2021
  2. Approved by RERA14 Feb 2022
  3. First promised31 Dec 2025

    The date the builder gave at registration.

  4. Today24 Oct 2026

    96% of the time to the deadline has passed.

  5. If it slips like a typical project2 Oct 2027

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-26100%
Q4 2025-26100%
Q1 2026-27100%
Q2 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

100 booked103 leftQ2 2026-27

Still available: 20 × 1 BHK, 58 × 2 BHK, 25 × 3 BHK.

Booked, by type

1 BHK18 of 38
2 BHK42 of 100
3 BHK40 of 65

Booked, each quarter

Q3 2025-26105 of 203
Q4 2025-26105 of 203
Q1 2026-27100 of 203
Q2 2026-27100 of 203

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

2 BHK
529 sq ft
49 m² carpet · sizes 518–642 sq ft (13 at this size)
28 m² land share · 16 m² balcony/terrace · 1 parking space
100 homes · 49% of the project
3 BHK
706 sq ft
66 m² carpet · sizes 644–859 sq ft (12 at this size)
39 m² land share · 24 m² balcony/terrace · 1 parking space
65 homes · 32% of the project
1 BHK
352 sq ft
33 m² carpet · sizes 352–429 sq ft (13 at this size)
19 m² land share · 13 m² balcony/terrace · 1 parking space
38 homes · 19% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Fourwalls Avenue12 floors

Fourwalls Avenue: 203 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project215
Typical within 3 km (26)74
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project69%
Typical within 3 km (26)65%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.94 acres

3,823 m²

Ground covered by buildings
31% of the land

1,181 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Fourwalls Avenue
Type
Partnership Firm
PAN
AAHFF0925E

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹2.1 cr
Construction
₹30.0 cr
Total project cost
₹32.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹46.3 lakh₹32.4 lakh
Q4 2025-26₹71.5 lakh₹50.0 lakh
Q1 2026-27₹65.1 lakh₹45.6 lakh
Q2 2026-27₹2.0 cr₹1.4 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station13.16 kmReliable
  • Nearest railway station11.12 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)0.47 kmCaveat

Hospitals

  • Nearest hospital1.56 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)17.35 kmReliable
  • Nearest sewage treatment plant6.87 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)15.3 kmCaveat
  • Nearest commercial-airport runway37.72 kmReliable
  • Distance to runway approach-path proxy35.23 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.85652, 77.80362), 2026-10-24. Each figure's source and caveat are in the full report.