RERA project · Residential/Group Housing
FOLIUM BY SUMADHURA PHASE-IV
by SUMADHURA INFRACON PRIVATE LIMITED · 280 homes · 2.83 acres · 2 towers · Bengaluru East
Upcoming Under construction, due Mar 2028. 45% built with 36% of the time used. 24% of homes booked.
At a glance
Due 31 Mar 2028. 36% of the time from RERA approval to the deadline has passed.
68 of 280 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 72 per acre. 82% of the land is left open.
Complaints to RERA about this project. 4 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 27 RERA projects in Bengaluru Urban: 2 delivered on time, 10 late (after the date first promised), 15 under way.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Work started1 Dec 2025
- Approved by RERA5 Jan 2026
- Today24 Oct 2026
36% of the time to the deadline has passed.
- Deadline31 Mar 2028
The date it must be complete by.
- If it slips like a typical project31 Dec 2028
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 16 × 1 BHK, 46 × 3 BHK CLASSIC, 47 × 3 BHK GRAND, 9 × 3 BHK SMART, 94 × 4 BHK SMART.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Wing - F (OAK): 200 homes, 60 m tall, 2 basements · Wing-G(ELM): 80 homes, 59 m tall, 2 basements
Amenities
- Electricity 187 m²
- Smart Home Automation 8,974 m²
- CCTV Surveillance 1,200 m²
- Outdoor Sports facility 2,500 m²
- Parks 1,500 m²
- Power Backup 150 m²
- Water and Sanitation 558 m²
- Air Conditioning 21,912 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 2.83 acres
- Ground covered by buildings
- 18% of the land
- Floor-area ratio
- 2.64
- Parking
- 1.86 per home
- Built-up area, all floors
- 8,29,197 sq ft
11,445 m²
2,054 m²
Floors built per unit of land: 2.64 m² of floors for each m² of land.
520 covered, 0 open
77,035 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 27 RERA projects of Sumadhura on the map
Complaints to RERA about its other projects
- SUMADHURA NANDANAM 1 complaint
- FOLIUM BY SUMADHURA PHASE-I 1 complaint
- FOLIUM BY SUMADHURA PHASE-II 1 complaint
- SUMADHURA EDITION PHASE-I 1 complaint
The company
- Registered as
- SUMADHURA INFRACON PRIVATE LIMITED
- Type
- Company
- Company number
- U45200KA2012PTC062071
- PAN
- AAQCS9641A
- GSTIN
- 29AAQCS9641A1ZZ
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
20 registrations under this company
- Sumadhura Belfort PRM/KA/RERA/1250/304/PR/230926/008960 · approved 23 Sep 2026
- SUMADHURA SOLACE PHASE-II PRM/KA/RERA/1251/446/PR/111225/008333 · approved 11 Dec 2025
- SUMADHURA EDITION PHASE-II PRM/KA/RERA/1251/446/PR/111225/008332 · approved 11 Dec 2025
- SUMADHURA SOLACE PHASE-I PRM/KA/RERA/1251/446/PR/111225/008330 · approved 11 Dec 2025
- SUMADHURA EDITION PHASE-I PRM/KA/RERA/1251/446/PR/111225/008328 · approved 11 Dec 2025
- SUMADHURA PRAMODA PRM/KA/RERA/1251/310/PR/250325/007625 · approved 25 Mar 2025
- SARANG BY SUMADHURA PHASE-II PRM/KA/RERA/1251/446/PR/050225/007481 · approved 5 Feb 2025
- SUMADHURA CAPITOL RESIDENCES PRM/KA/RERA/1251/446/PR/051024/007125 · approved 5 Oct 2024
- SUMADHURA THRIVE PRM/KA/RERA/1251/446/PR/051024/007124 · approved 5 Oct 2024
- HIVE BY SUMADHURA PRM/KA/RERA/1251/446/PR/051024/007123 · approved 5 Oct 2024
- FOLIUM BY SUMADHURA PHASE-III PRM/KA/RERA/1251/446/PR/141223/006468 · approved 14 Dec 2023
- SARANG BY SUMADHURA PHASE-I PRM/KA/RERA/1251/446/PR/180723/006075 · approved 18 Jul 2023
- FOLIUM BY SUMADHURA PHASE-II PRM/KA/RERA/1251/446/PR/250423/005893 · approved 25 Apr 2023
- FOLIUM BY SUMADHURA PHASE-I PRM/KA/RERA/1251/446/PR/280222/004738 · approved 28 Feb 2022
- SUMADHURA SUSHANTHAM PHASE II PRM/KA/RERA/1251/309/PR/200205/003253 · approved 5 Feb 2020
- SUMADHURA SUSHANTHAM PHASE I PRM/KA/RERA/1251/309/PR/200103/003118 · approved 3 Jan 2020
- SUMADHURA SOHAM PHASE II PRM/KA/RERA/1251/446/PR/190423/002529 · approved 23 Apr 2019
- SUMADHURA NANDANAM PRM/KA/RERA/1251/446/PR/180507/001667 · approved 7 May 2018
- SUMADHURA EDEN GARDEN PRM/KA/RERA/1251/446/PR/180328/002632 · approved 28 Mar 2018
- SUMADHURA SOHAM PHASE-I PRM/KA/RERA/1251/446/PR/171123/000704 · approved 23 Nov 2017
The land is owned together with others (a joint development).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/050126/008382 · Approved
- Building plan approvedBBMP - Bruhat Bengaluru Mahanagara Palike · BBMP/Addl.Dir/JDNORTH/0056/25-26 · 15 Dec 2025
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceBWSSB,Local Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
211 files on the RERA page: Approved plan ↗, Commencement certificate ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q4 2025-26 | ₹8.2 cr | ₹5.3 cr |
| Q1 2026-27 | ₹18.7 cr | ₹13.4 cr |
| Q2 2026-27 | ₹67.1 cr | ₹47.3 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station2.17 kmReliable
- Nearest railway station3.86 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km8Caveat
- Parks within 1 km3Caveat
- Nearest lake / water body (≥2 ha)0.22 kmCaveat
Hospitals
- Nearest hospital0.68 kmCaveat
Schools
- Schools in pincode 560066 (UDISE+ census)44Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km4Caveat
- Schools with library + playground + ICT lab (1 km)2Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionWhitefield PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km2Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
- In an IISc groundwater-critical ward (2025 outlook)yesCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km6Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)12.84 kmReliable
- Nearest sewage treatment plant1.76 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)6.59 kmCaveat
- Nearest commercial-airport runway24.71 kmReliable
- Distance to runway approach-path proxy23.7 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat
ReliableFrom our location report at the builder-entered pin (12.96642, 77.74317), 2026-10-24. Each figure's source and caveat are in the full report.