Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Estella Maple square Block A

by Estella Projects Private Limited · 57 homes · 0.80 acres · 1 tower · Anekal

Delivered late Completed: the builder filed for completion on 4 Jul 2025, 1,830 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 4 Jul 2025, 1,830 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
71 homes per acre

Similar projects within 3 km: 68 per acre. 62% of the land is left open.

Any complaints?See the list
1 complaint

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Feb 2018
  2. Approved by RERA24 May 2018
  3. First promised30 Jun 2020

    The date the builder gave at registration.

  4. Completion filed4 Jul 2025

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2 BHK
802 sq ft
74 m² carpet · sizes 759–841 sq ft (6 at this size)
27 m² land share · 1 parking space
40 homes · 70% of the project
3 BHK
1,013 sq ft
94 m² carpet · sizes 990–1,039 sq ft (4 at this size)
34 m² land share · 1 parking space
17 homes · 30% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A8 floors

Block A: 57 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project71
Typical within 3 km (90)68
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project62%
Typical within 3 km (90)60%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.80 acres

3,237 m²

Ground covered by buildings
38% of the land

1,237 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

The company

Registered as
Estella Projects Private Limited
Type
Company
PAN
AADCE5581G

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹6.0 cr
Construction
₹30.0 cr
Total project cost
₹36.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station3.42 kmReliable
  • Nearest railway station3.75 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km3Caveat
  • Parks within 1 km3Caveat
  • Nearest lake / water body (≥2 ha)0.62 kmCaveat

Hospitals

  • Nearest hospital0.88 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km2Caveat
  • Schools with library + playground + ICT lab (1 km)1Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionparappana AgraharaReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)18 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)2.83 kmReliable
  • Nearest sewage treatment plant1.37 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)6.37 kmCaveat
  • Nearest commercial-airport runway32.87 kmReliable
  • Distance to runway approach-path proxy31.92 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)0Caveat

ReliableFrom our location report at the builder-entered pin (12.89276, 77.67466), 2026-10-24. Each figure's source and caveat are in the full report.