Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ENGRACE VISTA

by MODERN SPAACES VENTURES · 392 homes · 8.05 acres · 7 towers · Anekal

Upcoming Under construction, due Dec 2028. 60% built with 55% of the time used. 46% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
60% built

Due 30 Dec 2028. 55% of the time from RERA approval to the deadline has passed.

Built60%
Time used55%
How much is sold?211 left
46% booked

181 of 392 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
49 homes per acre

Similar projects within 3 km: 70 per acre. 84% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?5 due so far
20% on time

Of its 6 RERA projects in Bengaluru Urban: 1 delivered on time, 4 late (after the date first promised), 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started20 Feb 2024
  2. Approved by RERA6 Mar 2024
  3. Today24 Oct 2026

    55% of the time to the deadline has passed.

  4. If it slips like a typical project1 Oct 2029

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2646%
Q4 2025-2650%
Q1 2026-2753%
Q2 2026-2760%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Tower 125%
Tower 270%
Tower 365%
Tower 455%
Tower 555%
Tower 680%
Tower 780%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

181 booked211 leftQ2 2026-27

Still available: 211 × 3 BHK.

Booked, by type

3 BHK181 of 392

Booked, each quarter

Q3 2025-26173 of 392
Q4 2025-26178 of 392
Q1 2026-27178 of 392
Q2 2026-27181 of 392

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,293 sq ft
120 m² carpet · sizes 1,279–1,330 sq ft (56 at this size)
71 m² land share · 26 m² balcony/terrace · 1 parking space
392 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 114 floors
Tower 214 floors
Tower 314 floors
Tower 414 floors
Tower 514 floors
Tower 614 floors
Tower 714 floors

Tower 1: 56 homes, 45 m tall, 1 basement · Tower 2: 56 homes, 45 m tall, 1 basement · Tower 3: 56 homes, 45 m tall, 1 basement · Tower 4: 56 homes, 45 m tall, 1 basement · Tower 5: 56 homes, 45 m tall, 1 basement · Tower 6: 56 homes, 45 m tall, 1 basement · Tower 7: 56 homes, 45 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project49
Typical within 3 km (71)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project84%
Typical within 3 km (73)60%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
8.05 acres

32,577 m²

Ground covered by buildings
16% of the land

5,304 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.32 per home

516 covered, 0 open

Built-up area, all floors
10,71,869 sq ft

99,580 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 6 RERA projects of MODERN SPAACES VENTURES on the map

The company

Registered as
MODERN SPAACES VENTURES
Type
Partnership Firm
PAN
ABNFM0253F
GSTIN
29ABNFM0253F1Z8
Website
www.modernspaaces.com

Its other registrations on RERA Karnataka

6 registrations under this company
  • Soulace by Modern Spaaces PRM/KA/RERA/1251/308/PR/150223/005723 · approved 15 Feb 2023
  • 77 EAST PHASE 2 BY MODERN SPAACES VENTURES PRM/KA/RERA/1251/308/PR/210813/004263 · approved 13 Aug 2021
  • 302 WEST PRM/KA/RERA/1251/308/PR/210804/004223 · approved 4 Aug 2021
  • Soul Tree - Bliss PRM/KA/RERA/1251/308/PR/210312/003996 · approved 12 Mar 2021
  • Soul Tree - Nirvana PRM/KA/RERA/1251/308/PR/210111/003777 · approved 11 Jan 2021
  • SOUL TREE - SERINITY PRM/KA/RERA/1251/308/PR/201106/003694 · approved 6 Nov 2020

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹78.2 crBuilding and development ₹275.6 crTotal ₹355.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹30.1 cr₹20.9 cr
Q4 2025-26₹23.6 cr₹15.6 cr
Q1 2026-27₹17.4 cr₹13.8 cr
Q2 2026-27₹5.4 cr₹0.0 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.02 kmReliable
  • Nearest railway station7.49 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.4 kmCaveat

Hospitals

  • Nearest hospital1.01 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km2Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.58 kmReliable
  • Nearest sewage treatment plant5.01 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)12.84 kmCaveat
  • Nearest commercial-airport runway36.39 kmReliable
  • Distance to runway approach-path proxy34.94 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.86168, 77.75942), 2026-10-24. Each figure's source and caveat are in the full report.