RERA project · Residential/Group Housing

Engrace 3

by Modern Spaces · 76 homes · 1.30 acres · 1 tower · Bengaluru East

Past due, no completion filed Past its deadline of 1 Jun 2026, and no completion is filed on RERA. Some finished projects never file, so ask the builder for the occupancy certificate.

Location report

At a glance

Is it on schedule?Past due
Past its deadline

The deadline was 1 Jun 2026, and no completion is filed.

How much is sold?0 left
100% booked

76 of 76 homes, as the builder reported for Q1 2026-27.

How crowded is it?Less crowded
58 homes per acre

Similar projects within 3 km: 70 per acre. 51% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?3 due so far
67% on time

Of its 5 RERA projects in Bengaluru Urban: 2 delivered on time, 1 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Jul 2023
  2. Approved by RERA24 Jul 2023
  3. Deadline1 Jun 2026

    Passed with no completion filed.

How much is built, each quarter

Q3 2025-2699%
Q4 2025-2699%
Q1 2026-27100%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

76 booked0 leftQ1 2026-27

Booked, by type

2 BHK31 of 31
3 BHK45 of 45

Booked, each quarter

Q3 2025-2675 of 76
Q4 2025-2675 of 76
Q1 2026-2776 of 76

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,182 sq ft
110 m² carpet · sizes 956–1,182 sq ft (36 at this size)
75 m² land share · 25 m² balcony/terrace · 1 parking space
45 homes · 59% of the project
2 BHK
956 sq ft
89 m² carpet
61 m² land share · 20 m² balcony/terrace · 1 parking space
31 homes · 41% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Engrace 33 floors

Engrace 3: 76 homes, 15 m tall

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project58
Typical within 3 km (67)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project51%
Typical within 3 km (69)60%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
1.30 acres

5,260 m²

Ground covered by buildings
49% of the land

2,597 m²

Floor-area ratio
1.99

Floors built per unit of land: 1.99 m² of floors for each m² of land.

Parking
1.47 per home

112 covered, 0 open

Built-up area, all floors
1,12,687 sq ft

10,469 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 5 RERA projects of Modern Spaces on the map

The company

Registered as
Modern Spaces
Type
Partnership Firm
PAN
ABRFM2213K
GSTIN
29ABRFM2213K1ZX
Website
www.modernspaaces.com

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹1.3 crBuilding and development ₹27.5 crTotal ₹28.8 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹4.2 cr₹5.1 cr
Q4 2025-26₹1.7 cr₹2.9 cr
Q1 2026-27₹44.4 lakh₹59.6 lakh

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station8.86 kmReliable
  • Nearest railway station7.34 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km0Caveat
  • Nearest lake / water body (≥2 ha)1.24 kmCaveat

Hospitals

  • Nearest hospital1.2 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)12.23 kmReliable
  • Nearest sewage treatment plant5.17 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)12.5 kmCaveat
  • Nearest commercial-airport runway36.17 kmReliable
  • Distance to runway approach-path proxy34.79 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.86344, 77.75655), 2026-10-24. Each figure's source and caveat are in the full report.