Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

ELEGANT TRANQUILITY

by ELEGANT ALTIMA · 321 homes · 3.47 acres · 5 towers · Bengaluru South

Upcoming Under construction, due Sep 2029. 78% built with 54% of the time used. 85% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
78% built

Due 30 Sep 2029. 54% of the time from RERA approval to the deadline has passed.

Built78%
Time used54%
How much is sold?66 left
85% booked

371 of 437 homes, as the builder reported for Q2 2026-27.

How crowded is it?More crowded
92 homes per acre

Similar projects within 3 km: 80 per acre. 50% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 2 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 1 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started1 Apr 2023
  2. Approved by RERA30 May 2023
  3. Today24 Oct 2026

    54% of the time to the deadline has passed.

  4. If it slips like a typical project2 Jul 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2660%
Q4 2025-2666%
Q1 2026-2770%
Q2 2026-2778%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Block - A40%
Block - B78%
Block - C86%
Block - D98%
Block - E98%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

371 booked66 leftQ2 2026-27

Still available: 20 × 2BHK, 46 × 3BHK.

Booked, by type

2BHK167 of 187
3BHK204 of 250

Booked, each quarter

Q3 2025-26295 of 437
Q4 2025-26314 of 437
Q1 2026-27342 of 437
Q2 2026-27371 of 437

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
  • 1,082 sq ft84 homes100.5 m²
  • 1,147 sq ft83 homes106.6 m²
  • 1,236 sq ft83 homes114.8 m²
Typically 388 m² land share · 75 m² balcony/terrace · 1 parking space
250 homes · 57% of the project
2BHK
  • 746 sq ft43 homes69.3 m²
  • 785 sq ft41 homes72.9 m²
  • 869 sq ft41 homes80.7 m²
  • 959 sq ft41 homes89.1 m²
  • and 21 homes in other sizes
Typically 293 m² land share · 57 m² balcony/terrace · 1 parking space
187 homes · 43% of the project

Carpet areas from the builder's flat-by-flat list on RERA, each size as listed with how many homes have it. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block - A10 floors
Block - B10 floors
Block - C11 floors
Block - D11 floors
Block - E11 floors

Block - A: 79 homes, 2 basements · Block - B: 100 homes, 2 basements · Block - C: 106 homes, 2 basements · Block - D: 64 homes, 2 basements · Block - E: 88 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project92
Typical within 3 km (61)80
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project50%
Typical within 3 km (63)50%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
3.47 acres

14,062 m²

Ground covered by buildings
50% of the land

7,024 m²

Floor-area ratio
3.30

Floors built per unit of land: 3.30 m² of floors for each m² of land.

Parking
1.24 per home

397 covered, 0 open

Built-up area, all floors
5,71,531 sq ft

53,097 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 2 RERA projects of ELEGANT ALTIMA on the map

The company

Registered as
ELEGANT ALTIMA
Type
Partnership Firm
PAN
AAGFE6597G
GSTIN
29AAGFE6597G1ZW

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹43.9 crBuilding and development ₹188.6 crTotal ₹232.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹16.5 cr₹16.5 cr
Q4 2025-26₹24.7 cr₹24.7 cr
Q1 2026-27₹34.7 cr₹34.7 cr
Q2 2026-27₹44.0 cr₹44.0 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station1.28 kmReliable
  • Nearest railway station2.69 kmReliable
  • Bus stops within 500 m2Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km6Caveat
  • Nearest lake / water body (≥2 ha)0.75 kmCaveat

Hospitals

  • Nearest hospital1.11 kmCaveat

Schools

  • Schools in pincode 560098 (UDISE+ census)29Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
  • Median pupil-teacher ratio, schools within 1 km30 :1Caveat
  • Schools with library + playground + ICT lab (1 km)2Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionRajarajeshwari Nagar PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)10 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km4Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)13.57 kmReliable
  • Nearest sewage treatment plant1.61 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)16.15 kmCaveat
  • Nearest commercial-airport runway35.87 kmReliable
  • Distance to runway approach-path proxy30.85 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.91838, 77.50854), 2026-10-24. Each figure's source and caveat are in the full report.