RERA project · Residential/Group Housing
Elanza
by Lodha Developers Limited · 698 homes · 6.76 acres · 6 towers · Anekal
Upcoming Under construction, due Sep 2031. 2% built with 15% of the time used. 47% of homes booked.
At a glance
Due 30 Sep 2031. 15% of the time from RERA approval to the deadline has passed.
331 of 698 homes, as the builder reported for Q2 2026-27.
Similar projects within 3 km: 70 per acre. 33% of the land is left open.
Complaints to RERA about this project. 1 more about the builder's other projects.
No litigation on the land or the project, as the builder declares it to RERA.
None of its 7 RERA projects in Bengaluru Urban has reached its deadline yet.
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
When will it be ready?
- Approved by RERA19 Dec 2025
- Work started1 Feb 2026
- Today24 Oct 2026
15% of the time to the deadline has passed.
- Deadline30 Sep 2031
The date it must be complete by.
- If it slips like a typical project1 Jul 2032
35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q2 2026-27
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 2 × 1 BHK+STUDY+GARDEN, 74 × 3 BHK OPTIMA, 2 × 3 BHK+GARDEN_A, 3 × 3 BHK+STUDY_C, 147 × 3 BHK_B, 6 × 4 BHK+STUDY+TERRACE_PH_A, 6 × 4 BHK_A, 2 × 3 BHK_A, 104 × 3 BHK+STUDY_A, 2 × 3 BHK+STUDY_B, 3 × 4 BHK+STUDY, 6 × 4 BHK+STUDY+TERRACE_PH_B, 6 × 4 BHK_B, 2 × 2 BHK+GARDEN, 2 × 3 BHK+GARDEN_B.
Booked, by type
Booked, each quarter
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
A: 119 homes, 104 m tall · B: 119 homes, 104 m tall · C: 111 homes, 104 m tall · D: 111 homes, 104 m tall · E: 119 homes, 104 m tall · F: 119 homes, 104 m tall
Amenities
- Electricity 252 m²
- CCTV Surveillance 74 m²
- Club House 2,909 m²
- Community Hall 240 m²
- Outdoor Sports facility 1,236 m²
- Indoor Sports facility 560 m²
- Swimming Pool 222 m²
- Gym 270 m²
- Parks 7,696 m²
- Power Backup 425 m²
- Piped Gas 18 m²
- Water and Sanitation 1,272 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 6.76 acres
- Ground covered by buildings
- 67% of the land
- Floor-area ratio
- 2.49
- Parking
- 1.00 per home
- Built-up area, all floors
- 19,26,620 sq ft
27,344 m²
18,372 m²
Floors built per unit of land: 2.49 m² of floors for each m² of land.
698 covered, 0 open
1,78,989 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 7 RERA projects of Lodha on the map
Complaints to RERA about its other projects
- Azur 1 complaint
The company
- Registered as
- Lodha Developers Limited
- Type
- Company
- Company number
- L45200MH1995PLC093041
- PAN
- AAACL1490J
- GSTIN
- 29AAACL1490J1ZC
CIN or LLPIN, from the Registrar of Companies.
Its other registrations on RERA Karnataka
6 registrations under this company
- Fiorana@Beaumont Estate(Phase-1) PRM/KA/RERA/1251/472/PR/200726/008829 · approved 20 Jul 2026
- Haven Phase 2 PRM/KA/RERA/1251/308/PR/260326/008551 · approved 26 Mar 2026
- Azur Phase 2 PRM/KA/RERA/1251/310/PR/200925/008110 · approved 20 Sep 2025
- Haven PRM/KA/RERA/1251/308/PR/280525/007785 · approved 28 May 2025
- Azur Tower D PRM/KA/RERA/1251/310/PR/280324/006746 · approved 28 Mar 2024
- Azur PRM/KA/RERA/1251/310/PR/220324/006728 · approved 22 Mar 2024
The land is owned together with others (a joint development), including Lodha Developers Limited (formerly known as Macrotech Developers Limited).
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/308/PR/191225/008353 · Approved
- Building plan approvedAnekal Planning Authority · APA/CC/1199/2025-26 · 12 Dec 2025
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q2 2026-27 update
- Water sourceLocal Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
224 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹10.4 cr | ₹8.3 cr |
| Q4 2025-26 | ₹83.7 cr | ₹73.8 cr |
| Q1 2026-27 | ₹120.5 cr | ₹120.1 cr |
| Q2 2026-27 | ₹150.1 cr | ₹147.6 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station9.67 kmReliable
- Nearest railway station6.79 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km1Caveat
- Parks within 1 km0Caveat
- Nearest lake / water body (≥2 ha)0.09 kmCaveat
Hospitals
- Nearest hospital1.06 kmCaveat
Schools
- Schools in pincode 562125 (UDISE+ census)91Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km6Caveat
- Median pupil-teacher ratio, schools within 1 km20.2 :1Caveat
- Schools with library + playground + ICT lab (1 km)1Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionSarjapura PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km0Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)12.17 kmReliable
- Nearest sewage treatment plant6.43 kmCaveat
- Industrial zones within 1 km0Caveat
- Nearest airfield runway (any, incl. military)11.72 kmCaveat
- Nearest commercial-airport runway34.96 kmReliable
- Distance to runway approach-path proxy33.52 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat
ReliableFrom our location report at the builder-entered pin (12.87471, 77.75883), 2026-10-24. Each figure's source and caveat are in the full report.