Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

EL ROI

by LEWIS INFRASTRUCTURE AND PROJECTS · 35 homes · 0.57 acres · 1 tower · Bengaluru East

Upcoming Under construction, due Mar 2028. 82% built with 58% of the time used. 83% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
82% built

Due 31 Mar 2028. 58% of the time from RERA approval to the deadline has passed.

Built82%
Time used58%
How much is sold?6 left
83% booked

29 of 35 homes, as the builder reported for Q2 2026-27.

How crowded is it?About the same
62 homes per acre

Similar projects within 3 km: 57 per acre. 39% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?7 due so far
14% on time

Of its 9 RERA projects in Bengaluru Urban: 1 delivered on time, 4 late (after the date first promised), 2 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started16 Oct 2024
  2. Approved by RERA24 Oct 2024
  3. Today24 Oct 2026

    58% of the time to the deadline has passed.

  4. If it slips like a typical project31 Dec 2028

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q3 2025-2665%
Q4 2025-2675%
Q1 2026-2780%
Q2 2026-2782%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

29 booked6 leftQ2 2026-27

Still available: 6 × 3 BHK.

Booked, by type

3 BHK29 of 35

Booked, each quarter

Q3 2025-2617 of 35
Q4 2025-2625 of 35
Q1 2026-2726 of 35
Q2 2026-2729 of 35

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3 BHK
1,454 sq ft
135 m² carpet · sizes 1,207–1,454 sq ft (8 at this size)
47 m² land share · 46 m² balcony/terrace · 1 parking space
35 homes · 100% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

El Roi5 floors

El Roi: 35 homes, 15 m tall, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project62
Typical within 3 km (24)57
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project39%
Typical within 3 km (24)48%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
0.57 acres

2,302 m²

Ground covered by buildings
47% of the land

1,090 m²

Floor-area ratio
2.25

Floors built per unit of land: 2.25 m² of floors for each m² of land.

Parking
1.14 per home

35 covered, 4 open

Built-up area, all floors
77,748 sq ft

7,223 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 9 RERA projects of LEWIS INFRASTRUCTURE AND PROJECTS on the map

The company

Registered as
LEWIS INFRASTRUCTURE AND PROJECTS
Type
Partnership Firm
PAN
AAMFN4665N
GSTIN
29AAMFN4665N1ZD
Website
www.lewisinfrastructure.com

Its other registrations on RERA Karnataka

8 registrations under this company
  • FERRIS PRM/KA/RERA/1251/309/PR/161225/008344 · approved 16 Dec 2025
  • NO 12 LLOYDS ROAD PRM/KA/RERA/1251/446/PR/240323/005817 · approved 24 Mar 2023
  • NO 3 MILTON STREET PRM/KA/RERA/1251/446/PR/210323/005801 · approved 21 Mar 2023
  • GLORIOUS A2 PRM/KA/RERA/1251/446/PR/210216/003910 · approved 16 Feb 2021
  • PROVIDENCE PRM/KA/RERA/1251/309/PR/191116/003007 · approved 16 Nov 2019
  • 24, Defence Colony PRM/KA/RERA/1251/446/PR/180611/001893 · approved 11 Jun 2018
  • RAINTREE PRM/KA/RERA/1251/309/PR/180602/001855 · approved 2 Jun 2018
  • Charis PRM/KA/RERA/1251/446/PR/180131/001668 · approved 31 Jan 2018

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹31.0 crBuilding and development ₹30.3 crTotal ₹64.5 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q3 2025-26₹19.5 cr₹15.0 cr
Q4 2025-26₹27.8 cr₹27.8 cr
Q1 2026-27₹32.5 cr₹32.5 cr
Q2 2026-27₹8.3 cr₹8.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station2.47 kmReliable
  • Nearest railway station0.55 kmReliable
  • Bus stops within 500 m6Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km11Caveat
  • Parks within 1 km8Caveat
  • Nearest lake / water body (≥2 ha)1.75 kmCaveat

Hospitals

  • Nearest hospital0.23 kmCaveat

Schools

  • Schools in pincode 560005 (UDISE+ census)50Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km17Caveat
  • Median pupil-teacher ratio, schools within 1 km23.5 :1Caveat
  • Schools with library + playground + ICT lab (1 km)4Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionPulakeshinagar PSReliable

Air quality

  • PM2.5, recent 24 h avg (nearest CPCB station)32 µg/m³Caveat

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km1Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)11.71 kmReliable
  • Nearest sewage treatment plant1.3 kmCaveat
  • Industrial zones within 1 km3Caveat
  • Nearest airfield runway (any, incl. military)6.46 kmCaveat
  • Nearest commercial-airport runway22.36 kmReliable
  • Distance to runway approach-path proxy19.72 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.99846, 77.62265), 2026-10-24. Each figure's source and caveat are in the full report.