Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

Eaton Park @ The Prestige City

by PRESTIGE PROJECTS PRIVATE LIMITED · 366 homes · 7.66 acres · 4 towers · Anekal

Upcoming Under construction, due Jun 2030. 8% built with 14% of the time used. 80% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
8% built

Due 30 Jun 2030. 14% of the time from RERA approval to the deadline has passed.

Built8%
Time used14%
How much is sold?63 left
80% booked

247 of 310 homes, as the builder reported for Q2 2026-27.

How crowded is it?Less crowded
48 homes per acre

Similar projects within 3 km: 70 per acre. 90% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 17 more about the builder's other projects.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?55 due so far
25% on time

Of its 73 RERA projects in Bengaluru Urban: 14 delivered on time, 34 late (after the date first promised), 7 past due with no completion filed, 17 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Approved by RERA18 Mar 2026
  2. Work started1 Apr 2026
  3. Today24 Oct 2026

    14% of the time to the deadline has passed.

  4. If it slips like a typical project1 Apr 2031

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-2611%
Q1 2026-272%
Q2 2026-278%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q2 2026-27

Building 1 Tower 13%
Building 1 Tower 24%
Building 2 Tower 36%
Building 3 Tower 46%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

247 booked63 leftQ2 2026-27

Still available: 14 × 3 BED+3T, 49 × 4 BED+4T+POWDER+HO.

Booked, by type

3 BED+3T112 of 126
3 BED+3T+POWDER+HO5 of 5
4 BED+4T+POWDER+HO130 of 179

Booked, each quarter

Q4 2025-26112 of 366
Q1 2026-27167 of 366
Q2 2026-27247 of 310

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

4 BED+4T+POWDER+HO
1,657 sq ft
154 m² carpet · sizes 1,579–1,658 sq ft (63 at this size)
86 m² land share · 57 m² balcony/terrace · 1 parking space
235 homes · 64% of the project
3 BED+3T
1,102 sq ft
102 m² carpet · sizes 1,102–1,180 sq ft (66 at this size)
60 m² land share · 40 m² balcony/terrace · 1 parking space
126 homes · 34% of the project
3 BED+3T+POWDER+HO
1,355 sq ft
126 m² carpet · sizes 1,322–1,355 sq ft (3 at this size)
71 m² land share · 47 m² balcony/terrace · 1 parking space
5 homes · 1% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Building 1 Tower 129 floors
Building 1 Tower 229 floors
Building 2 Tower 329 floors
Building 3 Tower 437 floors

Building 1 Tower 1: 87 homes, 92 m tall, 2 basements · Building 1 Tower 2: 85 homes, 92 m tall, 2 basements · Building 2 Tower 3: 82 homes, 92 m tall, 2 basements · Building 3 Tower 4: 112 homes, 116 m tall, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project48
Typical within 3 km (92)70
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project90%
Typical within 3 km (94)57%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
7.66 acres

31,008 m²

Ground covered by buildings
10% of the land

3,100 m²

Floor-area ratio
2.75

Floors built per unit of land: 2.75 m² of floors for each m² of land.

Parking
1.20 per home

366 covered, 72 open

Built-up area, all floors
11,89,336 sq ft

1,10,493 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 73 RERA projects of Prestige Group on the map

Complaints to RERA about its other projects

17 complaints across 6 projects. The most complained about:

Show all 6 projects
  • PRESTIGE GREAT ACRES 1 complaint

The company

Registered as
PRESTIGE PROJECTS PRIVATE LIMITED
Type
Company
Company number
U45201KA2008PTC046784

CIN or LLPIN, from the Registrar of Companies.

PAN
AAECP7361E
GSTIN
29AAECP7361E1Z9
Website
www.prestigeconstructions.com

Its other registrations on RERA Karnataka

11 registrations under this company
  • Garden Breeze @ The Prestige City PRM/KA/RERA/1251/308/PR/080926/008919 · approved 8 Sep 2026
  • Fernvale @ The Prestige City PRM/KA/RERA/1251/308/PR/110326/008519 · approved 11 Mar 2026
  • Prestige Park Grove PRM/KA/RERA/1251/446/PR/100823/006141 · approved 10 Aug 2023
  • Aston Park @ The Prestige City PRM/KA/RERA/1251/308/PR/080323/005778 · approved 8 Mar 2023
  • Meridian Park Phase III @ The Prestige City PRM/KA/RERA/1251/308/PR/110822/005151 · approved 11 Aug 2022
  • Meridian Park Phase II @ The Prestige City PRM/KA/RERA/1251/308/PR/230522/004901 · approved 23 May 2022
  • Meridian Park Phase I @ The Prestige City PRM/KA/RERA/1251/308/PR/090222/004684 · approved 9 Feb 2022
  • EDEN PARK @ THE PRESTIGE CITY PRM/KA/RERA/1251/308/PR/211008/004353 · approved 8 Oct 2021
  • ASPEN GREENS @ THE PRESTIGE CITY PRM/KA/RERA/1251/308/PR/211007/004346 · approved 7 Oct 2021
  • THE PRESTIGE CITY - AVALON PARK PRM/KA/RERA/1251/308/PR/210928/004316 · approved 28 Sep 2021
  • PRESTIGE GREAT ACRES PRM/KA/RERA/1251/308/PR/210824/004289 · approved 24 Aug 2021

The land is owned together with others (a joint development), including M/s.Orchids Developers.

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹181.4 crBuilding and development ₹536.7 crTotal ₹718.1 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹10.0 cr₹7.4 cr
Q1 2026-27₹22.6 cr₹24.7 cr
Q2 2026-27₹71.9 cr₹68.3 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station11.33 kmReliable
  • Nearest railway station8.13 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km1Caveat
  • Nearest lake / water body (≥2 ha)0.85 kmCaveat

Hospitals

  • Nearest hospital1.41 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)13.77 kmReliable
  • Nearest sewage treatment plant7.12 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)12.73 kmCaveat
  • Nearest commercial-airport runway34.84 kmReliable
  • Distance to runway approach-path proxy33.02 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)1Caveat

ReliableFrom our location report at the builder-entered pin (12.87762, 77.77433), 2026-10-24. Each figure's source and caveat are in the full report.