Neighborhood IntelOpen on the map

RERA project · Residential/Group Housing

DSR WHITE WATERS PHASE - II

by DSR INFRSTRUCTURE PVT LTD · 195 homes · 2.55 acres · 3 towers · Bengaluru East

Delivered late Completed: the builder filed for completion on 13 Mar 2020, 165 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 13 Mar 2020, 165 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?About the same
76 homes per acre

Similar projects within 3 km: 78 per acre. 53% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project. 2 more about the builder's other projects.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?No other record
Only this project

It is the only RERA project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started1 Jan 2017
  2. Approved by RERA14 Oct 2017
  3. Completion filed13 Mar 2020

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2 BHK
764 sq ft
71 m² carpet · sizes 732–893 sq ft (45 at this size)
40 m² land share · 1 parking space
78 homes · 40% of the project
3 BHK
1,066 sq ft
99 m² carpet · sizes 958–1,119 sq ft (27 at this size)
54 m² land share · 1 parking space
57 homes · 29% of the project
2BHK
764 sq ft
71 m² carpet · sizes 743–764 sq ft (43 at this size)
40 m² land share · 1 parking space
50 homes · 26% of the project
3BHK
1,001 sq ft
93 m² carpet · sizes 1,001–1,087 sq ft (5 at this size)
52 m² land share · 1 parking space
10 homes · 5% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Block A4 floors
Block B4 floors
Block C4 floors

Block A: 76 homes, 1 basement · Block B: 60 homes, 1 basement · Block C: 59 homes, 1 basement

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project76
Typical within 3 km (137)78
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project53%
Typical within 3 km (137)79%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.55 acres

10,319 m²

Ground covered by buildings
47% of the land

4,806 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

This is the only project registered under this company name in Bengaluru Urban. Builders often register projects under other companies.

Complaints to RERA about its other projects

The company

Registered as
DSR INFRSTRUCTURE PVT LTD
Type
Company
Company number
U45200AP2007PTC052586

CIN or LLPIN, from the Registrar of Companies.

PAN
AACCD6139Q

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹3.6 cr
Construction
₹58.4 cr
Total project cost
₹62.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station6.51 kmReliable
  • Nearest railway station1.75 kmReliable
  • Bus stops within 500 m0Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km0Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.35 kmCaveat

Hospitals

  • Nearest hospital1.34 kmCaveat

Schools

  • Schools in pincode 560035 (UDISE+ census)45Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionVarthur PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well33.1 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)7.87 kmReliable
  • Nearest sewage treatment plant2.42 kmCaveat
  • Industrial zones within 1 km0Caveat
  • Nearest airfield runway (any, incl. military)5.15 kmCaveat
  • Nearest commercial-airport runway29.98 kmReliable
  • Distance to runway approach-path proxy29.35 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)6Caveat

ReliableFrom our location report at the builder-entered pin (12.91820, 77.71755), 2026-10-24. Each figure's source and caveat are in the full report.