DSR THE ADDRESS

by DSR INFRAPROJECTS · 702 homes · 13.68 acres · 6 towers · Anekal

Upcoming Under construction, due Jun 2029. 47% built with 45% of the time used. 21% of homes booked.

Location report

At a glance

Is it on schedule?Never extended
47% built

Due 12 Jun 2029. 45% of the time from RERA approval to the deadline has passed.

Built47%
Time used45%
How much is sold?1,082 left
21% booked

290 of 1,372 homes, as the builder reported for Q1 2026-27.

How crowded is it?Less crowded
51 homes per acre

Similar projects within 3 km: 76 per acre. 93% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?None declared
None declared

No litigation on the land or the project, as the builder declares it to RERA.

What is the builder's record?1 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 1 past due with no completion filed, 2 under way.

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

When will it be ready?

  1. Work started25 Jul 2024
  2. Approved by RERA5 Sep 2024
  3. Today24 Oct 2026

    45% of the time to the deadline has passed.

  4. If it slips like a typical project14 Mar 2030

    35% of 4,105 active projects in Bengaluru Urban have extended their deadline, by a median of 275 days.

How much is built, each quarter

Q4 2025-2642%
Q1 2026-2747%

Built, as the builder reports itTime used by then

When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.

By tower, Q1 2026-27

Tower 140%
Tower 245%
Tower 370%
Tower 470%
Tower 570%
Tower 690%

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

How much is sold?

290 booked1,082 leftQ1 2026-27

Still available: 129 × 2BHK, 712 × 3BHK, 89 × 4BHK, 152 × 1BHK.

Booked, by type

2BHK110 of 239
3BHK149 of 861
4BHK31 of 120
1BHK0 of 152

Booked, each quarter

Q4 2025-26227 of 1,372
Q1 2026-27290 of 1,372

Booked means sold or reserved, as the builder reports it. It says nothing about prices.

CaveatFrom the builder's quarterly updates to RERA Karnataka.

What's being built?

3BHK
117 sq ft
11 m² carpet · sizes 74–117 sq ft (248 at this size)
4 m² land share · 4 m² balcony/terrace · 1 parking space
861 homes · 63% of the project
2BHK
67 sq ft
6 m² carpet
2 m² land share · 3 m² balcony/terrace · 1 parking space
239 homes · 17% of the project
1BHK
43 sq ft
4 m² carpet
2 m² land share · 2 m² balcony/terrace · 1 parking space
152 homes · 11% of the project
4BHK
158 sq ft
15 m² carpet
5 m² land share · 6 m² balcony/terrace · 2 parking spaces
120 homes · 9% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home. The builder gave these areas in sq ft; m² figures are converted.

Towers

Tower 130 floors
Tower 230 floors
Tower 330 floors
Tower 430 floors
Tower 530 floors
Tower 612 floors

Tower 1: 275 homes, 3 basements · Tower 2: 275 homes, 3 basements · Tower 3: 120 homes, 3 basements · Tower 4: 275 homes, 3 basements · Tower 5: 275 homes, 3 basements · Tower 6: 152 homes, 3 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project51
Typical within 3 km (46)76
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project93%
Typical within 3 km (47)76%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
13.68 acres

55,341 m²

Ground covered by buildings
7% of the land

3,922 m²

Floor-area ratio
204733.00

Floors built per unit of land: 204733.00 m² of floors for each m² of land.

Parking
1.34 per home

938 covered, 0 open

Built-up area, all floors
15,95,856 sq ft

1,48,260 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of DSR INFRAPROJECTS on the map

The company

Registered as
DSR INFRAPROJECTS
Type
Partnership Firm
PAN
AAPFD6671B
GSTIN
29AAPFD6671B1Z7
Website
WWW.DSRINFRA.COM

Its other registrations on RERA Karnataka

The land is owned together with others (a joint development).

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land ₹228.9 crBuilding and development ₹457.8 crTotal ₹686.6 cr
Money from buyers, each quarter
QuarterCollected from buyersWithdrawn from the project account
Q4 2025-26₹24.3 cr₹24.3 cr
Q1 2026-27₹19.7 cr₹16.5 cr

Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.69 kmReliable
  • Nearest railway station4.99 kmReliable
  • Bus stops within 500 m1Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km1Caveat
  • Parks within 1 km2Caveat
  • Nearest lake / water body (≥2 ha)0.62 kmCaveat

Hospitals

  • Nearest hospital1.25 kmCaveat

Schools

  • Schools in pincode 562125 (UDISE+ census)91Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionSarjapura PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km1Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)10.91 kmReliable
  • Nearest sewage treatment plant6.34 kmCaveat
  • Industrial zones within 1 km2Caveat
  • Nearest airfield runway (any, incl. military)9.61 kmCaveat
  • Nearest commercial-airport runway32.93 kmReliable
  • Distance to runway approach-path proxy31.74 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)0Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)2Caveat

ReliableFrom our location report at the builder-entered pin (12.89228, 77.74921), 2026-10-24. Each figure's source and caveat are in the full report.