RERA project · Residential/Group Housing

DSR RR AVENUES

by DSR INFRA PROJECTS · 212 homes · 2.22 acres · 1 tower · Yelahanka

Delivered late Completed: the builder filed for completion on 17 May 2024, 473 days after the date it first promised.

Location report

At a glance

Was it on time?Delivered late
Completed late

The builder filed for completion on 17 May 2024, 473 days after the date it first promised.

How much is sold?Unknown
Not reported

The builder has not filed bookings on RERA.

How crowded is it?More crowded
95 homes per acre

Similar projects within 3 km: 76 per acre. 57% of the land is left open.

Any complaints?None filed
None

Complaints to RERA about this project.

Any legal cases?Unknown
Not stated

The RERA page doesn't say.

What is the builder's record?3 due so far
0% on time

Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 3 late (after the date first promised).

These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.

Was it delivered on time?

  1. Work started25 Mar 2019
  2. Approved by RERA9 Aug 2019
  3. First promised30 Jan 2023

    The date the builder gave at registration.

  4. Completion filed17 May 2024

    The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.

No quarterly construction update is filed on this project's RERA page.

CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.

What's being built?

2BHK
904 sq ft
84 m² carpet · sizes 840–926 sq ft (54 at this size)
34 m² land share · 1 parking space
108 homes · 51% of the project
3BHK
1,044 sq ft
97 m² carpet · sizes 926–1,152 sq ft (26 at this size)
40 m² land share · 1 parking space
100 homes · 47% of the project
3 BHK
926 sq ft
86 m² carpet · sizes 926–1,098 sq ft (1 at this size)
40 m² land share · 1 parking space
4 homes · 2% of the project

Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.

Towers

Tower 113 floors

Tower 1: 212 homes, 2 basements

Amenities

CaveatAs registered by the builder on RERA Karnataka.

How crowded is it?

Homes per acre

This project95
Typical within 3 km (65)76
Typical in the city (3,044)76

Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.

Land left open

This project57%
Typical within 3 km (67)50%
Typical in the city (3,151)56%

The share of the land not built on, which includes roads.

Land
2.22 acres

8,989 m²

Ground covered by buildings
29% of the land

2,606 m²

CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.

Who is building it?

All 3 RERA projects of DSR INFRA PROJECTS on the map

The company

Registered as
DSR INFRA PROJECTS
Type
Partnership Firm
PAN
AAPFD6671B

CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.

Project cost

Land
₹26.9 cr
Construction
₹85.1 cr
Total project cost
₹112.0 cr

CaveatCost as certified by the builder's chartered accountant at registration.

What's around it?

Open the full location report on the map

Metro, rail, bus, airport

  • Nearest operational metro station9.68 kmReliable
  • Nearest railway station1.14 kmReliable
  • Bus stops within 500 m5Caveat

Parks, shops, daily needs

  • Supermarkets within 1 km7Caveat
  • Parks within 1 km30Caveat
  • Nearest lake / water body (≥2 ha)0.82 kmCaveat

Hospitals

  • Nearest hospital0.32 kmCaveat

Schools

  • Schools in pincode 560064 (UDISE+ census)240Caveat
  • Private (classes 1–10 or 1–12), government and central schools within 1 km16Caveat
  • Median pupil-teacher ratio, schools within 1 km25.6 :1Caveat
  • Schools with library + playground + ICT lab (1 km)7Caveat

Police and crime

  • Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
  • Police station jurisdictionYelahanka New Town PSReliable

Flood and waterlogging

  • BBMP-listed flood / low-lying spots within 1 km0Caveat

Water availability

  • Groundwater stage (CGWB block assessment)Over ExploitedCaveat
  • Groundwater depth at nearest CGWB well16.2 m below groundCaveat
  • In an IISc groundwater-critical ward (2025 outlook)noCaveat

Power reliability

  • Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
  • Un/partially-electrified layouts within 1 km0Caveat

Landfills, sewage plants, industry, aircraft

  • Nearest named landfill / dump site (≥2 ha)4.75 kmReliable
  • Nearest sewage treatment plant0.3 kmCaveat
  • Industrial zones within 1 km14Caveat
  • Nearest airfield runway (any, incl. military)3.5 kmCaveat
  • Nearest commercial-airport runway14.92 kmReliable
  • Distance to runway approach-path proxy8.61 kmCaveat

Upcoming infrastructure

  • Under-construction projects within 3 km (verified)1Reliable
  • Earlier-stage projects within 3 km (sanctioned/tendered/observed)4Caveat

ReliableFrom our location report at the builder-entered pin (13.10663, 77.58150), 2026-10-24. Each figure's source and caveat are in the full report.