RERA project · Residential/Group Housing
DSR HIGHLAND GREENZ
by DSR INFRA PROJECTS · 900 homes · 10.10 acres · 4 towers · Bengaluru East
Delivered late Completed: the builder filed for completion on 31 Mar 2026, 1 day after the date it first promised.
At a glance
The builder filed for completion on 31 Mar 2026, 1 day after the date it first promised.
603 of 900 homes, as the builder reported for Q3 2025-26.
Similar projects within 3 km: 68 per acre. 73% of the land is left open.
Complaints to RERA about this project.
No litigation on the land or the project, as the builder declares it to RERA.
Of its 3 RERA projects in Bengaluru Urban: 0 delivered on time, 3 late (after the date first promised).
These answers come from the builder's own filings on RERA Karnataka and RERA's records. They are not checked on site; each section below shows the detail.
Was it delivered on time?
- Work started27 Jan 2022
- Approved by RERA11 May 2022
- Completion filed31 Mar 2026
The builder told RERA the project is complete. Ask for the occupancy certificate before moving in.
How much is built, each quarter
Built, as the builder reports itTime used by then
When the bar is short of the mark, construction is behind a steady pace. Builders rarely work at a steady pace, so read it as a rough guide.
By tower, Q3 2025-26
CaveatDates from the RERA Karnataka project list, 24 Oct 2026. Progress as the builder reports it each quarter, certified by its architect and engineer; not checked on site.
How much is sold?
Still available: 192 × 2 BHK, 53 × 3 BHK, 52 × 1 BHK.
Booked, by type
Booked means sold or reserved, as the builder reports it. It says nothing about prices.
CaveatFrom the builder's quarterly updates to RERA Karnataka.
What's being built?
Sizes from the builder's flat-by-flat list on RERA: the size most homes of each type have, and the range. Carpet area is the floor area inside the walls of a home, the figure RERA requires builders to sell by. Land share (the undivided share) is the part of the land that comes with each home.
Towers
Tower 1: 192 homes, 40 m tall, 1 basement · Tower 2: 240 homes, 40 m tall, 1 basement · Tower 3: 336 homes, 40 m tall, 1 basement · Tower 4: 132 homes, 37 m tall, 1 basement
Amenities
- Electricity 100 m²
- CCTV Surveillance
- Club House 1,988 m²
- Outdoor Sports facility 250 m²
- Indoor Sports facility 70 m²
- Swimming Pool 70 m²
- Gym
- Parks
- Power Backup 20 m²
CaveatAs registered by the builder on RERA Karnataka.
How crowded is it?
Homes per acre
Fewer homes on each acre usually means less crowding: less traffic, quieter common areas.
Land left open
The share of the land not built on, which includes roads.
- Land
- 10.10 acres
- Ground covered by buildings
- 27% of the land
- Floor-area ratio
- 84984.00
- Parking
- 1.12 per home
- Built-up area, all floors
- 13,26,565 sq ft
40,873 m²
11,133 m²
Floors built per unit of land: 84984.00 m² of floors for each m² of land.
923 covered, 87 open
1,23,242 m²
CaveatAs registered on RERA Karnataka. "Typical" is the median of active residential/group housing projects with a land area on RERA; the comparison is ours.
Who is building it?
All 3 RERA projects of DSR INFRA PROJECTS on the map
The company
- Registered as
- DSR INFRA PROJECTS
- Type
- Partnership Firm
- PAN
- AAPFD6671B
- GSTIN
- 29AAPFD6671B1Z7
- Website
- WWW.DSRINFRA.COM
Its other registrations on RERA Karnataka
- DSR THE ADDRESS PRM/KA/RERA/1251/308/PR/050924/006996 · approved 5 Sep 2024
- DSR THE COURTYARD PRM/KA/RERA/1251/446/PR/280324/006759 · approved 28 Mar 2024
- DSR GREEN WATERS PRM/KA/RERA/1251/446/PR/061222/005506 · approved 6 Dec 2022
- DSR VERTEX AND APEX PRM/KA/RERA/1251/446/PR/200526/003419 · approved 26 May 2020
- DSR RR AVENUES PRM/KA/RERA/1251/472/PR/190809/002785 · approved 9 Aug 2019
The land is owned together with others (a joint development), including DSR INFRAPROJECTS, DSR INFRASTRUCTURE PVT LTD REP BY K S SATYANARAYANA REDDY.
CaveatFrom the builder's own filings on this project's RERA page; complaints from RERA's list.
Paperwork and legal
- Registered with RERAPRM/KA/RERA/1251/446/PR/110522/004876 · Approved
- Building plan approvedBDA - Bangalore Development Authority · 22/21-22 · 27 Jan 2022
- Litigation on the landNone declared
- Litigation on the projectNone declared in the Q3 2025-26 update
- Water sourceLocal Authority
Complaints to RERA about this project
None on RERA Karnataka.
Documents
219 files on the RERA page: Approved plan ↗, Commencement certificate ↗, Brochure ↗.
CaveatAs filed on RERA Karnataka. Complaints are listed without the names of the people who filed them.
Project cost
Money from buyers, each quarter
| Quarter | Collected from buyers | Withdrawn from the project account |
|---|---|---|
| Q3 2025-26 | ₹36.0 cr | ₹36.0 cr |
Builders fill these in differently: some give the quarter, some the total so far, and the totals don't always add up. Read them as rough.
CaveatCost as certified by the builder's chartered accountant at registration.
What's around it?
Open the full location report on the map
Metro, rail, bus, airport
- Nearest operational metro station5.47 kmReliable
- Nearest railway station1.63 kmReliable
- Bus stops within 500 m0Caveat
Parks, shops, daily needs
- Supermarkets within 1 km0Caveat
- Parks within 1 km7Caveat
- Nearest lake / water body (≥2 ha)0.69 kmCaveat
Hospitals
- Nearest hospital0.16 kmCaveat
Schools
- Schools in pincode 560035 (UDISE+ census)45Caveat
- Private (classes 1–10 or 1–12), government and central schools within 1 km5Caveat
- Median pupil-teacher ratio, schools within 1 km18.5 :1Caveat
- Schools with library + playground + ICT lab (1 km)3Caveat
Police and crime
- Reported IPC/BNS crimes, Bengaluru City (2025)37,181 casesCaveat
- Police station jurisdictionBellanduru PSReliable
Flood and waterlogging
- BBMP-listed flood / low-lying spots within 1 km1Caveat
Water availability
- Groundwater stage (CGWB block assessment)Over ExploitedCaveat
Power reliability
- Avg outage minutes per feeder, city circles (2026-08)18.9 min/monthCaveat
- Un/partially-electrified layouts within 1 km0Caveat
Landfills, sewage plants, industry, aircraft
- Nearest named landfill / dump site (≥2 ha)5.17 kmReliable
- Nearest sewage treatment plant2.07 kmCaveat
- Industrial zones within 1 km2Caveat
- Nearest airfield runway (any, incl. military)6.28 kmCaveat
- Nearest commercial-airport runway32.47 kmReliable
- Distance to runway approach-path proxy31.84 kmCaveat
Upcoming infrastructure
- Under-construction projects within 3 km (verified)0Reliable
- Earlier-stage projects within 3 km (sanctioned/tendered/observed)3Caveat
ReliableFrom our location report at the builder-entered pin (12.89593, 77.69639), 2026-10-24. Each figure's source and caveat are in the full report.